Show Job Controls
Bid Cobra

LUBBOCK US 84 (0053-18-048)

Items: 137

County: LUBBOCK
Length: N/A
Highway: US 84
District: LUBBOCK
Control Number: 0053-18-048
DBE Goal: N/A
Project: CR 2023(042)
Guaranty: N/A
Time: 389 WORKING DAYS
Engineer's Estimate: $8,534,908.35
Date: 11/02/2022 (3 years ago)
Contract Number: N/A
Type: INFRASTRUCTURE IMPROVEMENTS
Mail/Deliver Bids To: N/A
MICHAEL WITTIE
ROSS MCMILLAN
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$8,534,908.35
$9,876,826.69
Over/Under Est: 15.72% $1,341,918.34
Over/Under Est: 61.36% $5,237,069.20
Amt Left: 39.44% $3,895,150.86
Subcontractor Percentage Amount
ALAMO BROTHERS CONCRETE INC 17.60% $1,673,743.44
ARTEX ELECTRIC, INC. 14.39% $1,368,475.46
TRP CONSTRUCTION GROUP, LLC 3.66% $348,062.56
FIBERTEX, LLC 1.20% $114,118.87
A BROTHERS MILLING, LLC 0.78% $74,177.27
H & F TRUCKING 0.74% $70,373.30
DK CONTRACTING, LLC 0.61% $58,010.43
BARRICADES UNLIMITED 0.42% $39,941.60
Total: 39.40% $3,746,902.93

Bid Items & Bid Tabulations

137 Total 0 of 137
LUBBOCK  |  US 84  |  LUBBOCK  |  0053-18-048  |  11/02/2022  |  $8,534,908.35  |  CR 2023(042)  |  INFRASTRUCT IMPRVS  |  389 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GILVIN-TERRILL, LTD.
ALLEN BUTLER CONSTRUCTION, INC.
PREPARING ROW
STA 53.300 $10,000.000 $14,369.000 $34,724.740
PREPARING ROW (TREE) (36" TO 48" DIA)
EA 1.000 $2,000.000 $5,000.000 $1,339.640
REMOVING CONC (PAV)
SY 598.000 $30.000 $175.000 $161.160
REMOVING STAB BASE & ASPH PAV (12")
SY 1,139.000 $20.000 $41.250 $132.690
BLOCK SODDING
SY 631.000 $10.000 $35.000 $16.080
VEGETATIVE WATERING
MG 22.000 $50.000 $215.000 $360.800
PROOF ROLLING
HR 20.000 $200.000 $160.000 $358.690
FOG SEAL (CSS-1H)
GAL 20,600.000 $5.000 $6.000 $6.640
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 936.000 $80.000 $85.000 $242.880
PLANE ASPH CONC PAV (3"- 5")
SY 93,636.000 $3.000 $6.600 $5.370
CEM STABIL BKFL
CY 135.000 $350.000 $450.000 $174.150
TRENCH EXCAVATION PROTECTION
LF 360.000 $20.000 $100.000 $4.020
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 472.000 $275.000 $175.000 $234.440
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 174.000 $500.000 $350.000 $468.870
CONC STR REPAIR (STANDARD)
SF 84.000 $200.000 $200.000 $103.150
RAIL (HANDRAIL)(TY B)
LF 100.000 $250.000 $200.000 $383.210
RC PIPE (CL III)(18 IN)
LF 312.000 $225.000 $245.000 $194.250
RC PIPE (CL III)(24 IN)
LF 275.000 $250.000 $275.000 $274.630
INLET (COMPL)(PCO)(5FT)(NONE)
EA 6.000 $7,000.000 $6,000.000 $9,645.420
INLET (COMPL)(PCO)(5FT)(LEFT)
EA 7.000 $7,500.000 $7,500.000 $12,659.620
INLET (COMPL)(PCO)(5FT)(RIGHT)
EA 8.000 $7,500.000 $7,500.000 $12,659.620
INLET (COMPL)(PCO)(6FT)(BOTH)
EA 1.000 $10,000.000 $9,500.000 $15,539.850
CAST-IN-PLACE TRENCH DRAIN
LF 352.800 $350.000 $275.000 $663.120
ADJUSTING MANHOLES
EA 30.000 $1,000.000 $1,000.000 $5,358.570
ADJUSTING INLETS
EA 13.000 $2,000.000 $2,000.000 $5,492.530
CLEAN EXIST CULVERTS
EA 70.000 $500.000 $2,000.000 $1,101.130
MOBILIZATION
LS 1.000 $776,000.000 $985,000.000 $1,364,435.100
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $25,000.000 $20,000.000 $22,565.650
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 178.000 $30.000 $35.000 $37.510
CONSTRUCTION EXITS (REMOVE)
SY 178.000 $10.000 $10.000 $13.400
SANDBAGS FOR EROSION CONTROL
EA 531.000 $10.000 $15.000 $18.420
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,410.000 $10.000 $10.000 $12.390
BIODEG EROSN CONT LOGS (REMOVE)
LF 705.000 $3.000 $5.000 $4.020
COLORED TEXTURED CONC (5")
SY 7,364.000 $90.000 $125.000 $212.790
CONC CURB & GUTTER (TY II)
LF 86.000 $35.000 $60.000 $128.610
CONC CURB & GUTTER (VALLEY GUTTER)
LF 460.000 $50.000 $40.000 $62.960
CONCRETE CURB (SPECIAL)
LF 2,023.000 $40.000 $90.000 $95.110
CONC CURB & GUTTER TY II (MOD)
LF 1,416.000 $100.000 $45.000 $85.740
DRIVEWAYS (CONC)
SY 1,648.000 $120.000 $100.000 $234.630
CURB RAMPS (TY 1)
SY 652.000 $200.000 $120.000 $267.930
CURB RAMPS (TY 2)
SY 438.000 $200.000 $120.000 $241.140
CURB RAMPS (TY 6)
SY 43.000 $200.000 $200.000 $247.830
CURB RAMPS (TY 10)
SY 15.000 $200.000 $175.000 $241.140
CURB RAMPS (SPECIAL)
SY 66.000 $250.000 $200.000 $274.630
CONC MEDIAN
SY 1,587.000 $100.000 $150.000 $187.550
REMOVE RD IL ASM (SHOE-BASE)
EA 60.000 $700.000 $500.000 $669.820
IN RD IL (TY SA) 50S-12 (400W EQ) LED
EA 59.000 $5,000.000 $3,925.000 $5,258.090
CONDT (PVC) (SCH 80) (2")
LF 14,104.000 $15.000 $12.000 $16.080
CONDT (PVC) (SCH 80) (2") (BORE)
LF 7,880.000 $25.000 $20.000 $26.790
CONDT (PVC) (SCH 80) (4")
LF 240.000 $20.000 $20.000 $26.790
CONDT (PVC) (SCH 80) (4") (BORE)
LF 775.000 $30.000 $33.000 $44.210
ELEC CONDR (NO.6) BARE
LF 1,070.000 $2.100 $1.300 $1.740
ELEC CONDR (NO.4) BARE
LF 13,106.000 $2.200 $2.400 $3.220
ELEC CONDR (NO.4) INSULATED
LF 26,212.000 $2.300 $2.650 $3.550
ELEC CONDR (NO.2) INSULATED
LF 1,305.000 $3.250 $2.900 $3.880
GROUND BOX TY A (122311)
EA 50.000 $1,900.000 $600.000 $803.790
GROUND BOX TY A (122311)W/APRON
EA 41.000 $2,000.000 $750.000 $1,004.730
GROUND BOX TY D (162922)
EA 20.000 $950.000 $700.000 $937.750
GROUND BOX TY D (162922)W/APRON
EA 4.000 $1,000.000 $900.000 $1,205.680
REMOVE ELECTRICAL SERVICES
EA 5.000 $350.000 $600.000 $803.790
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 4.000 $8,000.000 $6,000.000 $8,037.850
ELC SRV TY D 120/240 070(NS)SS(N)SP(O)
EA 3.000 $8,000.000 $5,500.000 $7,368.030
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 30.000 $900.000 $789.000 $1,056.980
IN SM RD SN SUP&AM TY10BWG(1)SB(P-BM)
EA 15.000 $1,000.000 $1,500.000 $1,323.570
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 13.000 $1,000.000 $1,400.000 $1,200.320
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 2.000 $1,500.000 $2,000.000 $1,758.950
REMOVE SM RD SN SUP&AM
EA 33.000 $200.000 $150.000 $200.940
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 15,770.000 $0.500 $0.300 $0.400
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 4,659.000 $1.000 $0.600 $0.800
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 10,280.000 $0.500 $0.300 $0.400
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 36,726.000 $0.500 $0.300 $0.400
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 18,013.000 $1.000 $1.500 $2.010
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 9,158.000 $1.000 $1.500 $2.010
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 1,570.000 $1.500 $2.000 $2.680
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 904.000 $10.000 $12.000 $16.080
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 1,052.000 $20.000 $24.000 $32.150
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 3,264.000 $1.500 $2.000 $2.680
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 12,110.000 $2.000 $1.000 $1.340
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 7,110.000 $2.000 $1.000 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 7,800.000 $2.000 $1.000 $1.490
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 286.000 $1.500 $1.310 $1.750
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,638.000 $1.500 $1.310 $1.750
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 22.000 $650.000 $600.000 $803.790
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 7,680.000 $0.700 $0.800 $1.070
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 8,730.000 $0.700 $0.750 $1.000
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 2,040.000 $0.700 $0.800 $1.070
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 9,644.000 $0.700 $0.750 $1.000
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 738.000 $20.000 $45.000 $60.280
PREFAB PAV MRK TY B (W)(ARROW)
EA 15.000 $500.000 $850.000 $1,138.700
PREFAB PAV MRK TY B (W)(DBL ARROW)
EA 8.000 $600.000 $1,525.000 $20,396.050
PREFAB PAV MRK TY B (W)(LNDP ARROW)
EA 3.000 $600.000 $2,750.000 $3,684.020
PRE PM TY B(ACC PRK)(BL&WH)(W/BORDR)LG
EA 2.000 $1,500.000 $1,700.000 $2,277.390
PREFAB PAV MRK TY C (W) (18") (SLD)
LF 164.000 $15.000 $15.000 $20.090
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 2,989.000 $20.000 $12.500 $16.750
PREFAB PAV MRK TY C (W) (ARROW)
EA 51.000 $500.000 $250.000 $334.910
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 6.000 $600.000 $400.000 $535.860
PRE PM TY C(ACC PRK)(BL&WH)(W/BORDR)LG
EA 9.000 $1,500.000 $750.000 $1,004.730
REFL PAV MRKR TY I-C
EA 484.000 $5.000 $5.000 $6.700
REFL PAV MRKR TY II-A-A
EA 322.000 $5.000 $5.000 $6.700
REFL PAV MRKR TY II-C-R
EA 130.000 $5.000 $5.000 $6.700
ELIM EXT PAV MRK & MRKS (4")
LF 31,555.000 $1.000 $1.000 $1.340
ELIM EXT PAV MRK & MRKS (8")
LF 6,414.000 $2.000 $1.700 $2.280
PAV SURF PREP FOR MRK (4")
LF 2,322.000 $1.000 $0.250 $0.330
PAV SURF PREP FOR MRK (8")
LF 1,490.000 $2.000 $0.500 $0.670
PAV SURF PREP FOR MRK (24")
LF 739.000 $5.000 $2.000 $2.680
PAV SURF PREP FOR MRK (ARROW)
EA 31.000 $20.000 $75.000 $100.470
PAV SURF PREP FOR MRK (MED NOSE)
EA 22.000 $100.000 $150.000 $200.950
PAV SURF PREP FOR MRK (ACC PRK)(LRG)
EA 2.000 $100.000 $200.000 $267.930
INSTALL HWY TRF SIG (ISOLATED)
EA 3.000 $30,000.000 $15,000.000 $20,094.630
REMOVING TRAFFIC SIGNALS
EA 5.000 $12,000.000 $3,000.000 $20,094.630
VEH SIG SEC (12")LED(GRN)
EA 32.000 $250.000 $225.000 $301.420
VEH SIG SEC (12")LED(GRN ARW)
EA 12.000 $250.000 $225.000 $301.420
VEH SIG SEC (12")LED(YEL)
EA 32.000 $250.000 $225.000 $301.420
VEH SIG SEC (12")LED(YEL ARW)
EA 24.000 $250.000 $225.000 $301.420
VEH SIG SEC (12")LED(RED)
EA 32.000 $250.000 $225.000 $301.420
VEH SIG SEC (12")LED(RED ARW)
EA 12.000 $250.000 $225.000 $301.420
PED SIG SEC (LED)(COUNTDOWN)
EA 24.000 $900.000 $675.000 $904.260
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 56.000 $220.000 $150.000 $200.950
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 20.000 $250.000 $175.000 $234.440
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 2,925.000 $2.800 $4.500 $6.030
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 1,125.000 $2.900 $4.700 $6.300
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 1,100.000 $4.600 $5.000 $6.700
TRF SIG CBL (TY A)(12 AWG)(12 CONDR)
LF 1,395.000 $4.000 $5.500 $7.370
INS TRF SIG PL AM(S)1 ARM(32')
EA 2.000 $13,000.000 $12,500.000 $16,745.530
INS TRF SIG PL AM(S)1 ARM(36')
EA 1.000 $14,000.000 $13,000.000 $17,415.340
INS TRF SIG PL AM(S)1 ARM(40')
EA 2.000 $16,000.000 $14,500.000 $19,424.810
INS TRF SIG PL AM(S)1 ARM(44')
EA 7.000 $19,000.000 $15,000.000 $20,094.630
PED POLE ASSEMBLY
EA 2.000 $2,000.000 $2,000.000 $2,679.290
LITTER REMOVAL
CYC 6.000 $5,000.000 $2,500.000 $6,698.210
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 6.000 $5,000.000 $3,000.000 $5,930.380
LANDSCAPE AMENITY
EA 6.000 $4,000.000 $2,500.000 $9,846.370
D-GR HMA TY-D SAC-A PG76-28
TON 8,100.000 $150.000 $230.000 $222.950
TACK COAT
GAL 13,109.000 $7.000 $5.000 $6.410
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1,440.000 $100.000 $62.500 $66.470
TMA (STATIONARY)
DAY 778.000 $150.000 $325.000 $159.800
TMA (MOBILE OPERATION)
DAY 33.000 $250.000 $950.000 $1,598.030
TEMP SPEED MONITOR SYS
EA 2.000 $20,000.000 $7,500.000 $23,202.600
Totals: $8,534,908.350 $9,876,826.690 $13,771,977.558