REMOVING CONC (MEDIANS)
|
SY
|
247.000
|
$16.000
|
$13.500
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
521.000
|
$15.000
|
$11.000
|
|
|
OBLITERATING ABANDONED ROAD
|
STA
|
14.000
|
$1,500.000
|
$691.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY D)
|
CY
|
369.000
|
$10.000
|
$48.000
|
|
|
DRILL SEEDING (PERM) (URBAN) (SANDY)
|
SY
|
4,445.000
|
$0.200
|
$1.500
|
|
|
VEGETATIVE WATERING
|
MG
|
150.000
|
$30.000
|
$121.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
793.000
|
$5.000
|
$7.500
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
5,846.000
|
$4.000
|
$6.500
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
21,650.000
|
$2.250
|
$2.500
|
|
|
CL C CONC (MISC)
|
CY
|
85.000
|
$800.000
|
$558.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
58.000
|
$600.000
|
$736.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
7.000
|
$2,000.000
|
$4,220.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$129,678.000
|
$156,263.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$10,000.000
|
$2,432.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 3)
|
SY
|
160.000
|
$20.000
|
$81.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
160.000
|
$10.000
|
$25.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
56.000
|
$10.000
|
$43.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
152.000
|
$7.000
|
$16.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
152.000
|
$2.500
|
$10.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (54 )
|
LF
|
283.000
|
$100.000
|
$339.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
148.000
|
$20.000
|
$28.500
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$275.000
|
$579.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$500.000
|
$1,020.000
|
|
|
CRASH CUSHION ATTEN (INSTALL) (QUAD)(N)
|
EA
|
2.000
|
$35,000.000
|
$44,011.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
14.000
|
$900.000
|
$1,072.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
8.000
|
$900.000
|
$1,265.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
3.000
|
$900.000
|
$1,137.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
3.000
|
$750.000
|
$1,265.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$1,100.000
|
$1,265.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U)
|
EA
|
1.000
|
$900.000
|
$1,923.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
40.000
|
$200.000
|
$277.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-A
|
EA
|
166.000
|
$5.000
|
$14.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
171.000
|
$5.000
|
$14.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
60.000
|
$7.000
|
$14.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
500.000
|
$5.000
|
$7.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
613.000
|
$5.000
|
$7.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
250.000
|
$5.000
|
$2.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
100.000
|
$5.000
|
$5.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
50.000
|
$3.000
|
$9.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
66.000
|
$2.000
|
$4.250
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,917.000
|
$1.250
|
$2.750
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
833.000
|
$4.000
|
$4.750
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
329.000
|
$4.000
|
$4.750
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
5,948.000
|
$0.500
|
$1.250
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
6,430.000
|
$0.500
|
$1.250
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
72.000
|
$16.000
|
$29.500
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
6.000
|
$250.000
|
$484.000
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
2.000
|
$500.000
|
$1,314.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
23.000
|
$30.000
|
$69.000
|
|
PREFAB PAV MRK TY C (Y) (MED NOSE)
|
EA
|
2.000
|
$100.000
|
$691.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
28.000
|
$5.000
|
$8.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
38.000
|
$5.000
|
$8.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
91.000
|
$5.000
|
$8.500
|
|
|
INSTALL RDSD FLASH BEACON ASSEMBLY
|
EA
|
6.000
|
$4,000.000
|
$6,913.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
1.000
|
$3,000.000
|
$2,074.000
|
|
|
LITTER REMOVAL
|
CYC
|
1.000
|
$2,500.000
|
$1,037.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
|
TON
|
2,555.000
|
$200.000
|
$248.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
365.000
|
$50.000
|
$152.000
|
|
|
TMA (STATIONARY)
|
DAY
|
100.000
|
$250.000
|
$157.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$250.000
|
$1,566.000
|
|
Totals: |
$1,220,461.750
|
$1,570,806.750
|