LOVING SH 302 (0479-03-021)

Items: 81

County: LOVING
Length: N/A
Highway: SH 302
District: ODESSA
Control Number: 0479-03-021
DBE Goal: N/A
Project: F 2022(590)
Guaranty: N/A
Time: 478 WORKING DAYS
Engineer's Estimate: $26,165,542.17
Date: 12/02/2022 (3 years ago)
Contract Number: N/A
Type: ROADWAY WIDENING TO A SUPER 2
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$26,165,542.17
$31,270,742.80
Over/Under Est: 19.51% $5,105,200.63
$32,395,443.69
Over/Under Est: 23.81% $6,229,901.52
Amt Left: 3.6% $1,124,700.89
Over/Under Est: 24.84% $6,498,241.03
Amt Left: 4.45% $1,393,040.40
Delta: -0.83% -$268,339.51
Subcontractor Percentage Amount
MAKIN" IT MOVE TRANSPORT,LLC 8.90% $2,783,096.11
REECE CONSTRUCTION CO., INC. 4.86% $1,519,758.10
TRP CONSTRUCTION GROUP, LLC 0.91% $284,563.76
TEX OP CONSTRUCTION, LP 0.83% $259,547.17
JVH4 SERVICES, LLC 0.12% $37,524.89
HJC FARMS, INC. 0.11% $34,397.82
WEST TEXAS ROCK RESOURCES, LLC 0.04% $12,508.30
AGAVE TRANSPORTATION SERVICES, INC. 0.03% $9,381.22
JOAT ONE ENTERPRISES LLC 0.02% $6,254.15
Total: 15.82% $4,947,031.52

Bid Items & Bid Tabulations

81 Total 0 of 81
LOVING  |  SH 302  |  ODESSA  |  0479-03-021  |  12/02/2022  |  $26,165,542.17  |  F 2022(590)  |  ROADWAY WIDENING TO A SUPER 2  |  478 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
FNF CONSTRUCTION, INC.
CI CONSTRUCTORS, INC.
JAMES HAMILTON CONSTRUCTION CO.
REMOVING STAB BASE & ASPH PAV (12")
SY 37,682.000 $7.500 $8.000 $5.600 $4.900
REMOVING STAB BASE AND ASPH PAV (5")
SY 121,397.000 $5.000 $4.000 $2.750 $2.500
EXCAVATION (ROADWAY)
CY 75,165.000 $9.000 $22.000 $8.000 $11.500
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 26,532.000 $10.000 $11.500 $15.000 $11.500
BLADING
STA 398.000 $160.000 $620.000 $1,250.000 $120.000
PROOF ROLLING
HR 15.000 $135.000 $110.000 $150.000 $115.000
FL BS (CMP IN PLC)(TY A GR 4)(5")
SY 199,003.000 $7.780 $7.000 $7.800 $9.200
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 99,997.000 $1.160 $2.000 $2.000 $1.800
PRIME COAT (MC-30)
GAL 56,964.000 $4.500 $7.000 $6.000 $6.500
FOG SEAL (CSS-1H)
GAL 59,482.000 $3.500 $4.000 $4.000 $4.800
ASPH (AC-20-5TR)
GAL 108,234.000 $3.250 $4.500 $5.100 $5.000
AGGR(TY-PB GR-4 SAC-A)
CY 2,477.000 $100.000 $150.000 $115.000 $150.000
STRUCT EXCAV
CY 839.000 $10.000 $95.000 $30.000 $25.000
CEM STABIL BKFL
CY 452.000 $185.000 $410.000 $200.000 $330.000
CUT & RESTORING PAV
SY 165.000 $120.000 $230.000 $140.000 $230.000
TRENCH EXCAVATION PROTECTION
LF 529.000 $16.000 $55.000 $30.000 $30.000
TEMPORARY SPL SHORING
SF 6,481.000 $20.000 $10.000 $17.000 $24.000
CONC BOX CULV (4 FT X 2 FT)
LF 240.000 $320.000 $705.000 $500.000 $500.000
CONC BOX CULV (5 FT X 2 FT)
LF 606.000 $400.000 $825.000 $600.000 $700.000
RC PIPE (CL IV)(36 IN)
LF 344.000 $135.000 $315.000 $250.000 $350.000
RC PIPE (ARCH)(CL IV)(DES 3)
LF 525.000 $200.000 $415.000 $300.000 $470.000
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $11,500.000 $33,000.000 $29,500.000 $31,000.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 3.000 $10,000.000 $16,300.000 $13,500.000 $11,000.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 14.000 $6,000.000 $8,250.000 $10,000.000 $9,500.000
SET (TY II) (18 IN) (RCP) (4: 1) (P)
EA 14.000 $1,250.000 $1,450.000 $2,000.000 $2,600.000
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 20.000 $2,000.000 $1,800.000 $2,300.000 $3,200.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 8.000 $2,600.000 $4,720.000 $6,300.000 $5,000.000
SET (TY II) (DES 3) (RCP) (4: 1) (C)
EA 15.000 $1,750.000 $2,280.000 $3,800.000 $3,300.000
SET (TY II) (DES 3) (RCP) (6: 1) (C)
EA 3.000 $2,000.000 $3,220.000 $5,600.000 $4,600.000
REMOV STR (HEADWALL)
EA 14.000 $1,500.000 $455.000 $1,350.000 $1,100.000
REMOV STR (PIPE)
EA 11.000 $700.000 $1,500.000 $1,300.000 $1,100.000
MOBILIZATION
LS 1.000 $2,382,900.000 $3,115,000.000 $3,200,000.000 $3,041,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $20,000.000 $14,250.000 $30,000.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 247.000 $30.000 $55.000 $80.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 247.000 $15.000 $12.000 $20.000 $13.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 444.000 $25.000 $30.000 $65.000 $25.000
CONSTRUCTION EXITS (REMOVE)
SY 444.000 $12.000 $10.000 $11.000 $9.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 620.000 $7.500 $10.000 $15.000 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 620.000 $2.000 $2.500 $5.000 $2.500
CONSTRUCTING DETOURS
SY 8,095.000 $45.000 $94.000 $60.000 $70.000
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
LF 12,650.000 $50.000 $45.000 $70.000 $48.000
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
LF 37,945.000 $9.000 $5.000 $10.000 $4.000
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
LF 12,650.000 $8.000 $10.000 $7.000 $4.000
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 4,064.000 $50.000 $89.000 $100.000 $75.000
RUMBLE STRIPS (SHOULDER)
LF 78,416.000 $0.200 $0.300 $0.140 $0.200
RUMBLE STRIPS (CENTERLINE)
LF 20,650.000 $0.200 $0.300 $0.140 $0.250
CRASH CUSH ATTEN (MOVE & RESET)
EA 14.000 $1,200.000 $885.000 $1,500.000 $1,000.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $850.000 $715.000 $1,500.000 $400.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $8,500.000 $9,300.000 $9,300.000 $8,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 18.000 $600.000 $1,200.000 $1,000.000 $1,070.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 3.000 $1,500.000 $1,500.000 $1,600.000 $1,530.000
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 1.000 $1,500.000 $1,700.000 $1,900.000 $1,850.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 8.000 $500.000 $850.000 $1,000.000 $1,010.000
REMOVE SM RD SN SUP&AM
EA 9.000 $100.000 $125.000 $175.000 $140.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 245,794.000 $0.150 $0.200 $0.150 $0.150
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 246,988.000 $0.200 $0.200 $0.150 $0.150
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,976.000 $2.000 $1.000 $3.000 $1.250
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,988.000 $0.950 $1.000 $3.000 $1.250
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 2,093.000 $1.000 $1.100 $1.200 $1.100
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 1,500.000 $1.000 $1.500 $1.750 $1.600
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 6,083.000 $1.000 $1.200 $1.200 $1.200
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 7,083.000 $0.420 $0.600 $0.600 $0.600
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 78,416.000 $0.420 $0.600 $0.600 $0.600
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 106,384.000 $0.420 $0.600 $0.600 $0.600
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 225.000 $14.000 $15.000 $17.000 $16.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 30.000 $230.000 $235.000 $270.000 $250.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 16.000 $500.000 $550.000 $600.000 $560.000
PREFAB PAV MRK TY C (W) (WORD)
EA 30.000 $300.000 $320.000 $360.000 $330.000
REFL PAV MRKR TY I-C
EA 662.000 $3.250 $5.000 $5.850 $5.500
REFL PAV MRKR TY II-A-A
EA 3,948.000 $3.000 $4.000 $4.600 $4.400
ELIM EXT PAV MRK & MRKS (4")
LF 82,837.000 $0.350 $0.700 $0.700 $0.700
SP MIXES SP-B SAC-B PG70-22
TON 153,026.000 $80.000 $90.000 $95.000 $105.000
TACK COAT
GAL 56,964.000 $3.500 $5.500 $5.000 $5.200
STONE-MTRX-ASPH SMAR-F SAC-A
TON 23,580.000 $125.000 $130.000 $165.000 $150.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $15,230.000 $23,500.000 $26,000.000
TMA (STATIONARY)
DAY 308.000 $150.000 $190.000 $150.000 $250.000
TMA (MOBILE OPERATION)
HR 80.000 $80.000 $70.000 $130.000 $900.000
1
RC PIPE (CL III)(18 IN)
LF 847.000 $90.000 $0.000 $120.000 $110.000
1A
THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)
LF 847.000 $90.000 $100.000 $0.000 $0.000
2
RC PIPE (CL III)(24 IN)
LF 1,160.000 $100.000 $0.000 $130.000 $140.000
2A
THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)
LF 1,160.000 $100.000 $125.000 $0.000 $0.000
Totals: $26,357,772.170 $31,270,742.800 $32,395,443.690 $32,663,783.200