Show Job Controls
Bid Cobra

LLANO RM 152 (0396-09-021)

Items: 44

County: LLANO
Length: N/A
Highway: RM 152
District: AUSTIN
Control Number: 0396-09-021
DBE Goal: N/A
Project: STP 2017(426)TAPS
Guaranty: N/A
Time: 161 WORKING DAYS
Engineer's Estimate: $975,603.85
Date: 09/07/2017 (8 years ago)
Contract Number: N/A
Type: PEDESTRIAN TRAIL- SIDEWALKS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (9)
E
Engineer's Estimate
$975,603.85
$1,011,049.85
Over/Under Est: 3.63% $35,446.00
Over/Under Est: 16.87% $164,596.05
Amt Left: 12.77% $129,150.05
$1,197,565.45
Over/Under Est: 22.75% $221,961.60
Amt Left: 18.45% $186,515.60
Delta: -5.03% -$57,365.55
$1,213,461.20
Over/Under Est: 24.38% $237,857.35
Amt Left: 20.02% $202,411.35
Delta: -1.33% -$15,895.75
$1,220,305.50
Over/Under Est: 25.08% $244,701.65
Amt Left: 20.7% $209,255.65
Delta: -0.56% -$6,844.30
Over/Under Est: 40.89% $398,947.79
Amt Left: 35.95% $363,501.79
Delta: -12.64% -$154,246.14
Over/Under Est: 41.61% $405,992.25
Amt Left: 36.65% $370,546.25
Delta: -0.51% -$7,044.46
$1,397,689.71
Over/Under Est: 43.26% $422,085.86
Amt Left: 38.24% $386,639.86
Delta: -1.16% -$16,093.61
$1,558,652.00
Over/Under Est: 59.76% $583,048.15
Amt Left: 54.16% $547,602.15
Delta: -11.52% -$160,962.29

Bid Items & Bid Tabulations

44 Total 0 of 44
LLANO  |  RM 152  |  AUSTIN  |  0396-09-021  |  09/07/2017  |  $975,603.85  |  STP 2017(426)TAPS  |  PEDESTRIAN TRAIL- SIDEWALKS  |  161 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ACME BRIDGE COMPANY, INC.
A GREATER AUSTIN DEVELOPMENT CONCRETE CONSTRUCTION, L.L.C.
TI-ZACK CONCRETE, INC.
ENCINO LANDSCAPE, INC.
3LW CIVIL LLC
HIGHWAY 19 CONSTRUCTION LLC
AARON CONCRETE CONTRACTORS, L.P.
DAN WILLIAMS COMPANY
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 70.000 $1,000.000 $500.000 $800.000 $165.000 $1,000.000 $300.000 $1,000.000 $1,500.000 $1,900.000 $1,500.000
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 1.000 $1,000.000 $3,250.000 $730.000 $600.000 $1,000.000 $1,000.000 $1,000.000 $4,200.000 $1,500.000 $1,000.000
REMOVING CONC (RIPRAP)
SY 274.000 $25.000 $17.000 $25.000 $15.000 $10.000 $20.000 $25.000 $32.000 $15.000 $20.000
REMOVING CONC (CURB AND GUTTER)
LF 49.000 $20.000 $26.000 $30.000 $15.000 $10.000 $15.000 $10.000 $27.000 $10.000 $12.500
EXCAVATION (ROADWAY)
CY 935.000 $20.000 $30.000 $36.000 $25.000 $10.000 $30.000 $15.000 $46.000 $30.000 $30.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 133.000 $30.000 $30.000 $25.000 $25.000 $20.000 $35.000 $45.000 $58.000 $30.000 $30.000
FURNISHING AND PLACING TOPSOIL (4")
SY 11,663.000 $2.150 $4.650 $4.500 $3.000 $2.000 $2.500 $4.000 $2.500 $2.000 $4.500
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 11,663.000 $0.150 $0.170 $0.200 $0.200 $0.200 $1.000 $0.160 $0.200 $0.220 $0.500
BROADCAST SEED (TEMP) (WARM)
SY 11,663.000 $0.150 $0.130 $0.200 $0.200 $0.200 $1.000 $0.120 $0.200 $0.200 $0.500
VEGETATIVE WATERING
MG 350.000 $25.000 $30.000 $56.000 $100.000 $20.000 $50.000 $100.000 $35.000 $20.000 $100.000
RETAINING WALL (CONC BLOCK)
SF 1,084.000 $50.000 $39.000 $49.000 $40.000 $50.000 $65.000 $50.000 $43.000 $50.000 $65.000
RIPRAP (CONC)(5 IN)
CY 60.000 $500.000 $500.000 $490.000 $510.000 $800.000 $500.000 $600.000 $500.000 $650.000 $650.000
RIPRAP (MOW STRIP)(4 IN)
CY 26.000 $540.000 $450.000 $600.000 $450.000 $800.000 $450.000 $500.000 $500.000 $600.000 $550.000
STR STEEL (MISC NON - BRIDGE)
LB 2,267.000 $10.500 $4.300 $3.000 $5.000 $25.000 $9.000 $12.000 $5.000 $14.000 $10.000
RAIL (HANDRAIL)(TY B)
LF 1,138.000 $50.000 $57.500 $180.000 $60.000 $100.000 $117.000 $50.000 $75.000 $75.000 $200.000
RAIL (HANDRAIL)(TY E)
LF 228.000 $112.500 $88.800 $110.000 $110.000 $150.000 $225.000 $100.000 $115.000 $125.000 $250.000
CONC BOX CULV (10 FT X 6 FT)
LF 58.000 $1,000.000 $800.000 $740.000 $1,100.000 $2,000.000 $795.000 $900.000 $1,600.000 $1,000.000 $1,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $20,000.000 $29,000.000 $30,500.000 $32,000.000 $5,000.000 $15,000.000 $16,000.000 $50,000.000 $59,000.000 $20,000.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 2.000 $500.000 $510.000 $730.000 $200.000 $500.000 $200.000 $1,000.000 $600.000 $1,000.000 $1,500.000
PIPE (PVC) (SCH 40) (4 IN)
LF 5.000 $100.000 $47.100 $22.500 $55.000 $50.000 $25.000 $10.000 $15.000 $30.000 $15.000
MOBILIZATION
LS 1.000 $104,500.000 $80,000.000 $100,000.000 $175,000.000 $125,000.000 $100,000.000 $350,000.000 $130,000.000 $135,000.000 $150,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $2,500.000 $2,000.000 $3,000.000 $1,000.000 $3,000.000 $8,000.000 $1,500.000 $1,500.000 $12,000.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 162.000 $30.000 $27.800 $28.000 $27.000 $20.000 $35.000 $25.000 $28.000 $26.000 $40.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 100.000 $40.000 $51.600 $47.500 $46.000 $20.000 $80.000 $10.000 $48.000 $45.000 $90.000
ROCK FILTER DAMS (REMOVE)
LF 262.000 $10.000 $6.400 $11.000 $11.000 $20.000 $10.000 $10.000 $12.000 $12.000 $16.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 845.000 $3.000 $2.450 $2.500 $2.750 $3.000 $4.000 $3.000 $2.500 $2.500 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 845.000 $1.000 $0.530 $0.500 $0.500 $1.000 $1.000 $1.000 $0.500 $0.750 $2.000
DRIVEWAYS (ACP)
SY 606.000 $47.500 $98.800 $39.000 $50.000 $60.000 $25.000 $45.000 $150.000 $75.000 $42.000
DRIVEWAYS (CONC) (FAST TRACK)
SY 157.000 $75.000 $129.000 $104.000 $76.000 $100.000 $50.000 $150.000 $150.000 $130.000 $150.000
CONC SIDEWALKS (5")
SY 4,891.000 $50.000 $59.000 $50.000 $80.000 $60.000 $55.000 $75.000 $78.000 $65.000 $65.000
CURB RAMPS (TY 7)
EA 12.000 $1,700.000 $2,030.000 $1,600.000 $2,000.000 $2,000.000 $1,200.000 $1,100.000 $1,800.000 $1,800.000 $1,850.000
MTL W-BEAM GD FEN (TIM POST)
LF 175.000 $25.000 $21.500 $22.500 $25.000 $35.000 $20.000 $75.000 $23.000 $25.000 $25.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $2,700.000 $2,470.000 $2,600.000 $2,500.000 $4,500.000 $2,100.000 $2,500.000 $2,600.000 $2,800.000 $2,850.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $300.000 $240.000 $250.000 $250.000 $500.000 $300.000 $500.000 $250.000 $300.000 $500.000
POST (W/SINGLE BRACE)(REM/REP)(METAL)
EA 4.000 $1,000.000 $213.000 $220.000 $550.000 $1,000.000 $1,000.000 $100.000 $450.000 $400.000 $1,500.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 6.000 $400.000 $421.000 $440.000 $165.000 $300.000 $250.000 $400.000 $450.000 $500.000 $1,100.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 424.000 $3.000 $4.950 $5.200 $5.000 $10.000 $5.350 $10.000 $5.000 $5.000 $8.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 80.000 $8.000 $9.600 $10.000 $11.000 $20.000 $10.350 $10.000 $10.000 $9.500 $20.000
REFL PAV MRK TY II (W) 12" (SLD)
LF 424.000 $1.000 $1.050 $1.100 $3.000 $10.000 $1.150 $10.000 $1.100 $1.250 $8.000
REFL PAV MRK TY II (W) 24" (SLD)
LF 80.000 $3.000 $2.150 $2.200 $6.000 $20.000 $2.300 $10.000 $2.200 $2.250 $20.000
TREE PROTECTION
EA 11.000 $375.000 $267.000 $280.000 $275.000 $200.000 $10.000 $400.000 $280.000 $275.000 $500.000
STONE MASONRY (ROCK WALL)
SF 1,378.000 $40.000 $38.900 $36.500 $60.000 $40.000 $120.000 $35.000 $42.000 $40.000 $65.000
FIXED BOLLARD
EA 2.000 $1,200.000 $453.000 $480.000 $500.000 $500.000 $1,400.000 $200.000 $480.000 $500.000 $15.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 60.000 $80.000 $64.000 $73.000 $25.000 $200.000 $90.000 $100.000 $75.000 $150.000 $150.000
Totals: $975,603.850 $1,011,049.850 $1,140,199.900 $1,197,565.450 $1,213,461.200 $1,220,305.500 $1,374,551.640 $1,381,596.100 $1,397,689.710 $1,558,652.000