Show Job Controls
Bid Cobra

LIVE OAK VA (0916-29-015)

Items: 34

County: LIVE OAK
Length: N/A
Highway: VA
District: CORPUS CHRISTI
Control Number: 0916-29-015
DBE Goal: N/A
Project: STP 2021(632)TAPS
Guaranty: N/A
Time: 102 WORKING DAYS
Engineer's Estimate: $734,945.00
Date: 06/04/2021 (5 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (8)
E
Engineer's Estimate
$734,945.00
$587,838.09
Over/Under Est: -20.02% -$147,106.91
Over/Under Est: -16.33% -$119,988.02
Amt Left: 4.61% $27,118.89
Over/Under Est: -13.52% -$99,384.00
Amt Left: 8.12% $47,722.91
Delta: -3.35% -$20,604.02
Over/Under Est: -11.22% -$82,425.00
Amt Left: 11% $64,681.91
Delta: -2.67% -$16,959.00
Over/Under Est: -0.04% -$329.74
Amt Left: 24.97% $146,777.17
Delta: -12.58% -$82,095.26
Over/Under Est: 4.97% $36,494.50
Amt Left: 31.23% $183,601.41
Delta: -5.01% -$36,824.24
Over/Under Est: 5.95% $43,709.50
Amt Left: 32.46% $190,816.41
Delta: -0.94% -$7,215.00
Over/Under Est: 15.75% $115,760.00
Amt Left: 44.72% $262,866.91
Delta: -9.25% -$72,050.50

Bid Items & Bid Tabulations

34 Total 0 of 34
LIVE OAK  |  VA  |  CORPUS CHRISTI  |  0916-29-015  |  06/04/2021  |  $734,945.00  |  STP 2021(632)TAPS  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  102 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TI-ZACK CONCRETE, INC.
PROJECT ALLIED RESOURCES, LLC
ENCINO LANDSCAPE, INC.
TEXAS STEEL INDUSTRIAL PLACING, LLC
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
SJ&J CONSTRUCTION, LLC
J E CONSTRUCTION SERVICES, LLC
DIAMOND X CONTRACTING, INC
PREPARING ROW
STA 52.000 $2,000.000 $600.000 $654.000 $500.000 $1,000.000 $1,090.630 $1,500.000 $230.000 $800.000
REMOVING CONC (SIDEWALKS)
SY 771.000 $30.000 $15.000 $12.300 $20.000 $31.000 $47.860 $25.000 $55.000 $20.000
REMOVING CONC (DRIVEWAYS)
SY 107.000 $30.000 $30.000 $24.600 $20.000 $25.000 $27.130 $25.000 $150.000 $53.000
REMOVING CONC (CURB AND GUTTER)
LF 871.000 $20.000 $7.000 $7.000 $10.000 $11.000 $14.280 $15.000 $22.000 $12.000
REMOVING CONC (MISC)
SY 5.000 $40.000 $120.000 $64.000 $100.000 $12.000 $239.110 $25.000 $178.000 $300.000
REMOVING STAB BASE AND ASPH PAV (3")
SY 305.000 $5.000 $15.000 $13.100 $20.000 $20.000 $34.320 $27.000 $62.000 $8.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 3,533.000 $5.000 $1.000 $1.360 $2.000 $1.000 $1.070 $1.500 $1.500 $1.000
FERTILIZER
AC 0.090 $8,000.000 $1.000 $2,380.000 $10,000.000 $2,500.000 $3,626.550 $1,000.000 $17,000.000 $2,200.000
VEGETATIVE WATERING
MG 40.000 $75.000 $1.000 $71.000 $10.000 $70.000 $77.860 $20.000 $110.000 $85.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(11")
SY 254.000 $225.000 $55.000 $130.000 $200.000 $80.000 $128.680 $100.000 $130.000 $175.000
CAST-IN-PLACE TRENCH DRAIN
LF 54.000 $400.000 $450.000 $340.000 $200.000 $300.000 $352.040 $300.000 $190.000 $500.000
MOBILIZATION
LS 1.000 $70,000.000 $25,000.000 $18,400.000 $100,000.000 $60,000.000 $86,858.200 $120,000.000 $22,000.000 $80,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $4,000.000 $1,000.000 $5,260.000 $3,000.000 $4,500.000 $2,660.240 $6,000.000 $1,300.000 $2,500.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 60.000 $15.000 $5.000 $17.000 $5.000 $15.000 $11.330 $4.000 $8.000 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 60.000 $15.000 $5.000 $5.200 $1.000 $10.500 $4.760 $2.000 $4.000 $6.000
CONC CURB & GUTTER (TY II)
LF 593.000 $30.000 $30.000 $53.000 $35.000 $30.000 $47.980 $25.000 $48.000 $40.000
CONC CURB (TY F)
LF 652.000 $90.000 $190.000 $128.000 $100.000 $85.000 $95.280 $130.000 $65.000 $60.000
DRIVEWAYS (CONC)
SY 361.000 $70.000 $100.000 $114.000 $80.000 $85.000 $95.650 $110.000 $132.000 $100.000
CONC SIDEWALKS (4")
SY 2,518.000 $70.000 $85.000 $66.000 $80.000 $70.000 $70.710 $70.000 $112.000 $116.000
CONC SIDEWALKS (6")
SY 205.000 $85.000 $85.000 $99.000 $80.000 $85.000 $81.690 $80.000 $128.000 $121.000
CURB RAMPS (TY 1)
SY 48.000 $160.000 $90.000 $156.000 $100.000 $195.000 $111.370 $250.000 $372.000 $300.000
CURB RAMPS (TY 2)
SY 21.000 $170.000 $90.000 $201.000 $100.000 $250.000 $114.550 $250.000 $192.000 $275.000
CURB RAMPS (TY 5)
SY 29.000 $175.000 $90.000 $251.000 $100.000 $275.000 $246.090 $300.000 $162.000 $317.000
CURB RAMPS (TY 7)
SY 139.000 $190.000 $90.000 $185.000 $100.000 $150.000 $244.810 $250.000 $312.000 $302.000
CURB RAMPS (TY 10)
SY 22.000 $190.000 $90.000 $320.000 $100.000 $550.000 $357.390 $250.000 $187.000 $307.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 6.000 $600.000 $500.000 $514.000 $500.000 $750.000 $597.360 $550.000 $900.000 $400.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 179.000 $7.000 $5.000 $21.100 $30.000 $20.000 $17.160 $40.000 $28.000 $22.000
REFL PAV MRK TY II (W) 18" (YLD TRI)
EA 24.000 $18.000 $165.000 $24.500 $30.000 $25.000 $169.940 $500.000 $34.000 $110.000
TREE REMOVAL (4" - 12" DIA)
EA 2.000 $1,800.000 $454.000 $493.000 $100.000 $1,250.000 $2,138.760 $200.000 $250.000 $500.000
TREE REMOVAL (12" - 18" DIA)
EA 3.000 $1,800.000 $1,060.000 $1,150.000 $500.000 $1,500.000 $2,364.570 $400.000 $400.000 $550.000
TREE REMOVAL (24" - 30" DIA)
EA 1.000 $1,800.000 $1,820.000 $1,980.000 $1,000.000 $2,000.000 $2,937.050 $500.000 $800.000 $1,100.000
TREE REMOVAL (30" - 36" DIA)
EA 2.000 $1,800.000 $2,275.000 $2,470.000 $2,000.000 $2,500.000 $5,009.320 $600.000 $2,350.000 $1,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,500.000 $1,500.000 $7,030.000 $1,000.000 $17,450.000 $13,911.870 $8,000.000 $28,000.000 $19,000.000
TMA (STATIONARY)
DAY 60.000 $175.000 $55.000 $346.000 $200.000 $265.000 $195.580 $100.000 $150.000 $855.000
Totals: $734,945.000 $587,838.090 $614,956.980 $635,561.000 $652,520.000 $734,615.270 $771,439.500 $778,654.500 $850,705.000