Show Job Controls
Bid Cobra

LIVE OAK CR (0916-29-013)

Items: 47

County: LIVE OAK
Length: N/A
Highway: CR
District: CORPUS CHRISTI
Control Number: 0916-29-013
DBE Goal: N/A
Project: BR 2017(421)
Guaranty: N/A
Time: 243 WORKING DAYS
Engineer's Estimate: $2,264,694.30
Date: 06/01/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$2,264,694.30
1
$2,976,567.67
Over/Under Est: 31.43% $711,873.37
$4,444,772.75
Over/Under Est: 96.26% $2,180,078.45
Amt Left: 49.33% $1,468,205.08
Subcontractor Percentage Amount
TEXAS STERLING CONSTRUCTION CO. 18.52% $551,260.33
LONE STAR EROSION CONTROL 1.33% $39,588.35
TORO BRAVO CONSTRUCTION, LLC 1.26% $37,504.75
HIGHWAY BARRICADES AND SERVICES, LLC 0.60% $17,859.41
FLASHER EQUIPMENT COMPANY 0.25% $7,441.42
TORO BRAVO CONSTRUCTION, LLC 0.00% $0.00
Total: 21.96% $653,654.26

Bid Items & Bid Tabulations

47 Total 0 of 47
LIVE OAK  |  CR  |  CORPUS CHRISTI  |  0916-29-013  |  06/01/2022  |  $2,264,694.30  |  BR 2017(421)  |  BRIDGE REPL  |  243 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RELMCO, INC.
IOC COMPANY, LLC
PREPARING ROW
STA 8.500 $2,621.990 $5,000.000 $20,000.000
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 13.000 $886.620 $1,500.000 $1,200.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 585.000 $3.120 $10.000 $20.000
EXCAVATION (ROADWAY)
CY 60.000 $9.890 $50.000 $10.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 254.000 $20.800 $50.000 $50.000
COMPOST MANUF TOPSOIL (4")
SY 1,226.000 $1.660 $8.000 $15.000
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
SY 1,226.000 $0.220 $2.060 $6.500
STRAW/HAY MLCH SEED(TEMP)(WARM)
SY 613.000 $0.370 $3.300 $1.500
STRAW/HAY MLCH SEED(TEMP)(COOL)
SY 613.000 $0.360 $3.300 $2.000
VEGETATIVE WATERING
MG 53.000 $25.420 $50.000 $100.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 173.000 $64.190 $150.000 $250.000
PRIME COAT (MULTI OPTION)
GAL 173.000 $4.210 $10.000 $15.000
ASPH (MULTI OPTION)
GAL 287.000 $3.130 $10.000 $15.000
ASPH(AC-15P, HFRS-2P OR CRS-2P)
GAL 236.000 $3.440 $10.000 $20.000
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 7.000 $108.760 $500.000 $750.000
AGGR(TY-PB GR-3 OR TY-PB GR-3S)(SAC-B)
CY 9.000 $112.040 $500.000 $750.000
CEM STABIL BKFL
CY 118.000 $80.400 $200.000 $425.000
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
EA 1.000 $16,117.800 $75,000.000 $70,000.000
DRILL SHAFT (18 IN)
LF 214.000 $150.000 $250.000 $200.000
DRILL SHAFT (36 IN)
LF 1,245.000 $250.000 $750.000 $600.000
CL C CONC (ABUT)
CY 49.400 $1,200.000 $1,118.600 $2,000.000
CL C CONC (CAP)
CY 55.900 $1,600.000 $1,276.800 $3,000.000
CL C CONC (COLUMN)
CY 33.700 $1,860.000 $1,428.000 $3,000.000
REINF CONC SLAB
SF 14,690.000 $20.000 $22.990 $45.500
PRESTR CONC GIRDER (TX46)
LF 2,248.730 $170.000 $195.000 $375.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 215.000 $117.940 $185.000 $550.000
RIPRAP (MOW STRIP)(4 IN)
CY 13.600 $465.760 $550.000 $2,000.000
RAIL (TY T223)
LF 1,194.000 $150.000 $85.000 $250.000
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 102.000 $148.470 $180.000 $450.000
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
EA 1.000 $280,000.000 $175,000.000 $200,000.000
MOBILIZATION
LS 1.000 $204,563.000 $250,000.000 $425,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $7,250.200 $3,500.000 $3,250.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 120.000 $30.950 $58.190 $65.000
ROCK FILTER DAMS (REMOVE)
LF 120.000 $9.440 $9.020 $25.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,430.000 $2.910 $4.060 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,430.000 $1.060 $0.830 $1.350
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,133.900 $763.400 $1,750.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,666.130 $2,367.200 $4,450.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 10.000 $552.590 $739.200 $900.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 12.000 $19.010 $44.000 $22.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 4.000 $27.400 $44.000 $22.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,700.000 $0.390 $3.300 $1.850
REFL PAV MRKR TY II-A-A
EA 22.000 $3.140 $110.000 $15.000
PAV SURF PREP FOR MRK (4")
LF 1,130.000 $0.120 $2.200 $0.400
TIP TESTING(DRILL SHAFT)
EA 7.000 $6,377.730 $3,750.000 $3,250.000
TEMP CONSTRUCTION ACCESS
LS 1.000 $50,000.000 $75,000.000 $100,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 14.000 $69.640 $300.000 $100.000
Totals: $2,264,694.301 $2,976,567.670 $4,444,772.750