Bid Cobra

LIMESTONE SH 14 (0093-04-046)

Items: 58

County: LIMESTONE
Length: N/A
Highway: SH 14
District: WACO
Control Number: 0093-04-046
DBE Goal: N/A
Project: STP 2020(468)
Guaranty: N/A
Time: 75 WORKING DAYS
Engineer's Estimate: $3,629,126.10
Date: 01/10/2020 (6 years ago)
Contract Number: N/A
Type: OT IN-PLACE RECYCLE AND OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$3,629,126.10
$3,408,710.76
Over/Under Est: -6.07% -$220,415.34
Over/Under Est: 1.83% $66,266.17
Amt Left: 8.41% $286,681.51
Over/Under Est: 5.91% $214,638.88
Amt Left: 12.76% $435,054.22
Delta: -4.02% -$148,372.71

Bid Items & Bid Tabulations

58 Total 0 of 58
LIMESTONE  |  SH 14  |  WACO  |  0093-04-046  |  01/10/2020  |  $3,629,126.10  |  STP 2020(468)  |  OT IN-PLACE RECYCLE AND OVERLAY  |  75 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
TEXAS MATERIALS GROUP, INC.
TOM (ASPHALT) PG 70-22
TON 757.000 $115.000 $87.000 $102.000 $122.000
TOM-F (AGGREGATE) SAC-B
TON 10,356.000 $103.000 $87.000 $102.000 $122.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 5,000.000 $40.000 $50.000 $58.000 $50.000
PLAN & TEXT CONC PAV(0" TO 4")
SY 538.000 $1.900 $6.000 $7.000 $8.150
PAV JT UNDERSEAL (24")
LF 88.000 $33.000 $55.000 $33.350 $34.000
CL C CONC (RAIL FOUNDATION)
CY 3.000 $433.000 $1,500.000 $3,989.000 $2,725.000
CL C CONC (RAC-R)
CY 1.500 $950.000 $3,500.000 $1,490.000 $7,700.000
RIPRAP (CONC)(5 IN)
CY 2.000 $422.000 $750.000 $920.000 $1,610.000
RIPRAP (MOW STRIP)(4 IN)
CY 67.600 $425.000 $525.000 $498.000 $450.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 88.000 $32.000 $55.000 $45.800 $46.000
CLEANING AND SEALING JOINTS (CL 3)
LF 88.000 $26.000 $55.000 $45.800 $46.000
RAIL (TY T1W)
LF 46.000 $140.000 $325.000 $285.000 $502.000
MOBILIZATION
LS 1.000 $274,293.030 $65,000.000 $232,070.000 $222,135.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $5,000.000 $3,500.000 $4,025.000 $1,465.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,525.000 $26.000 $28.000 $24.150 $23.200
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,750.000 $1,800.000 $1,552.000 $1,490.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $912.000 $1,000.000 $1,042.000 $1,000.000
MTL BM GD FEN TRANS (NON - SYM)
EA 1.000 $502.000 $600.000 $590.000 $565.000
REMOVE METAL BEAM GUARD FENCE
LF 1,125.000 $2.220 $3.000 $2.000 $2.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $187.000 $200.000 $1,745.000 $175.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $2,650.000 $2,600.000 $2,685.000 $2,575.000
GUARDRAIL END TREATMENT (REMOVE)
EA 10.000 $250.000 $250.000 $235.000 $225.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $12,000.000 $7,000.000 $6,770.000 $9,140.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 1.000 $350.000 $500.000 $391.000 $400.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 7.000 $70.000 $100.000 $94.000 $90.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 21.000 $28.000 $40.000 $37.500 $36.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 7,340.000 $0.260 $0.140 $0.230 $0.140
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 4,420.000 $0.250 $0.160 $0.230 $0.160
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 31,426.000 $0.230 $0.160 $0.170 $0.160
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,202.000 $1.040 $1.000 $0.890 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,131.000 $1.250 $1.000 $0.890 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 700.000 $0.960 $1.000 $1.200 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 324.000 $6.000 $8.000 $5.210 $7.900
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 7,340.000 $0.370 $0.360 $0.400 $0.360
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 14,699.000 $0.290 $0.400 $0.360 $0.370
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 300.000 $0.420 $0.500 $0.780 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 11,007.000 $0.390 $0.400 $0.360 $0.370
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 51,466.000 $0.550 $0.700 $0.700 $0.700
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 20,419.000 $0.570 $0.700 $0.700 $0.700
PREFAB PAV MRK TY C (W) (ARROW)
EA 7.000 $205.000 $250.000 $248.000 $235.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 2.000 $370.000 $700.000 $467.000 $700.000
PREFAB PAV MRK TY C (W) (WORD)
EA 7.000 $260.000 $325.000 $301.000 $325.000
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 45.000 $35.000 $30.000 $50.000 $30.000
REFL PAV MRKR TY I-C
EA 91.000 $2.850 $6.000 $4.530 $6.000
REFL PAV MRKR TY II-A-A
EA 564.000 $3.820 $5.000 $4.550 $5.000
MEMBRANE UNDERSEAL
GAL 53,595.000 $2.900 $2.500 $2.710 $2.600
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 14.000 $130.000 $125.000 $260.000 $109.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $9,500.000 $5,500.000 $2,500.000 $6,500.000
TMA (STATIONARY)
DAY 60.000 $210.000 $225.000 $420.000 $220.000
TMA (MOBILE OPERATION)
HR 320.000 $46.000 $25.000 $65.000 $45.000
1
D-GR HMA(SQ) TY-C PG64-22
TON 1,471.000 $88.400 $0.000 $81.750 $87.000
1
TACK COAT
GAL 1,604.000 $2.350 $0.000 $3.750 $2.900
1
PLANE ASPH CONC PAV (2")
SY 13,369.000 $1.720 $0.000 $2.300 $1.600
1
HIR (SURFACE) (2")
SY 195,796.000 $5.430 $0.000 $5.500 $5.600
1
HIR (RECYCLING AGENT)
GAL 97,898.000 $3.150 $0.000 $3.250 $3.000
1A
D-GR HMA TY-C PG64-22
TON 23,518.000 $53.350 $60.000 $0.000 $0.000
1A
TACK COAT
GAL 25,656.000 $2.000 $1.500 $0.000 $0.000
1A
PLANE ASPH CONC PAV (2")(ALT)
SY 213,802.000 $1.040 $1.000 $0.000 $0.000
Totals: $5,157,477.480 $3,408,710.760 $3,695,392.270 $3,843,764.980