LIBERTY SH0099 (6463-15-001)

Items: 305

County: LIBERTY
Length: 0.0100 MILES
Highway: SH0099
District: BEAUMONT
Control Number: 6463-15-001
DBE Goal: N/A
Project: RMC - 646315001
Guaranty: $100,000.00
Time: 730 CALENDAR DAYS
Engineer's Estimate: $6,109,209.00
Date: 10/02/2024 (1 year ago)
Contract Number: 10244202
Type: BUNDLED BID
Project ID: A00207085
Project Description: BUNDLE BID ROADWAY MAINTENANCE ON SH 99 GRAND PARKWAY IN LIBERTY COUNTY (SEGMENTS H & I-1) AND CHAMBERS COUNTY (SEGMENT I-2A)
Mail/Deliver Bids To: N/A
ROBERTO RODRIGUEZ
DANIEL DUKE THOMPSON
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$6,109,209.00
$4,579,980.00
Over/Under Est: -25.03% -$1,529,229.00
$5,799,929.00
Over/Under Est: -5.06% -$309,280.00
Amt Left: 26.64% $1,219,949.00
$7,444,010.50
Over/Under Est: 21.85% $1,334,801.50
Amt Left: 62.53% $2,864,030.50
Delta: -28.35% -$1,644,081.50
Subcontractor Percentage Amount
BATTERSON, LLP 0.00% $0.00
CEDAR HILL SERVICES, LLC 0.00% $0.00
LIEUTENANT ENTERPRISES INC 0.00% $0.00
SWEEPING CORPORATION OF AMERICA, LLC 0.00% $0.00
WAYNE YANCEY, INC. 0.00% $0.00
XTREME PRO CLEANING LLC 0.00% $0.00
Total: 0.00% $0.00

Bid Items & Bid Tabulations

305 Total 0 of 305
LIBERTY  |  SH0099  |  BEAUMONT  |  6463-15-001  |  10/02/2024  |  $6,109,209.00  |  RMC - 646315001  |  BUNDLED BID  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROY JORGENSEN ASSOCIATES, INC.
DIGG COMMERCIAL, LLC
ISI CONTRACTING, INC.
REMOV CONC (RIPRAP)
SY 100.000 $38.000 $50.000 $49.000 $5.000
REMOV CONC (CURB)
LF 50.000 $6.500 $25.000 $18.000 $5.000
BACKFILL (TY A OR B)(VEH)
CY 500.000 $112.000 $20.000 $20.000 $15.000
BLADING
STA 100.000 $57.000 $150.000 $50.000 $126.000
SPOT SODDING
SY 300.000 $7.000 $15.000 $12.000 $50.000
BLOCK SODDING
SY 500.000 $8.000 $20.000 $24.000 $50.000
BROADCAST SEED (PERM_RURAL_SAND)
SY 1,000.000 $3.000 $10.000 $5.000 $4.660
FERTILIZER
AC 5.000 $1,011.000 $500.000 $1,000.000 $2,095.000
VEGETATIVE WATERING
TGL 30,000.000 $42.000 $0.250 $6.000 $10.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 100.000 $50.000 $250.000 $100.000 $141.000
FULL-DEPTH REPAIR CRCP (VAR DEPTH)
CY 78.000 $385.000 $250.000 $500.000 $613.000
FULL-DEPTH REP(BR APPR SLAB)(9"-13")
CY 27.000 $656.000 $500.000 $500.000 $613.000
FLOWABLE BACKFILL
CY 100.000 $317.000 $150.000 $250.000 $396.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 150.000 $234.000 $150.000 $400.000 $14.000
CONC STR REPAIR (STANDARD)
SF 75.000 $228.000 $200.000 $100.000 $8.000
RIPRAP (CONC)(6 IN)
CY 75.000 $3,990.000 $300.000 $350.000 $609.000
RIPRAP (CONC)(CL B)
CY 60.000 $486.000 $750.000 $350.000 $609.000
RIPRAP (MOW STRIP)(4 IN)
CY 30.000 $590.000 $700.000 $350.000 $254.000
RIPRAP (STONE TY R)(DRY)(18 IN)
CY 100.000 $152.000 $100.000 $250.000 $148.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 100.000 $273.000 $100.000 $250.000 $99.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 100.000 $200.000 $250.000 $250.000 $148.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 100.000 $200.000 $100.000 $250.000 $155.000
CLEANING AND SEALING EXISTING JOINTS
LF 10.000 $44.000 $500.000 $100.000 $10.000
CLEANING AND SEALING EXIST JOINTS (CL3)
LF 1,000.000 $25.000 $25.000 $15.000 $19.000
CLEANING AND SEALING EXIST JOINTS (CL7)
LF 1,000.000 $30.000 $45.000 $15.000 $19.000
MOBILIZATION (CALLOUT)
EA 104.000 $840.000 $5.000 $1.000 $463.000
MOBILIZATION (EMERGENCY)
EA 104.000 $637.000 $5.000 $1.000 $925.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $84.000 $250.000 $1,500.000 $190.000
TMA (STATIONARY)
DAY 156.000 $282.000 $100.000 $4,000.000 $4,000.000
TMA (MOBILE OPERATION)
HR 2,000.000 $86.000 $90.000 $400.000 $400.000
EMBANK (EROSN & SEDMT CONT, IN PLACE)
CY 500.000 $72.000 $40.000 $70.000 $40.000
EXCAV (EROSN & SEDMT CONT, IN VEH)
CY 500.000 $35.000 $40.000 $70.000 $40.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 60.000 $9.000 $50.000 $1,000.000 $10.910
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 510.000 $11.000 $10.000 $100.000 $9.900
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 560.000 $4.000 $10.000 $10.000 $9.900
LANDSCAPE PAVERS
SY 400.000 $31.000 $10.000 $1.000 $144.000
REMOVE AND RELAY PAVERS
SY 400.000 $33.000 $10.000 $1.000 $116.000
CONC CURB (TY II)
LF 500.000 $18.000 $25.000 $15.000 $3.200
CONC SIDEWALKS (4")
SY 100.000 $69.000 $150.000 $100.000 $90.000
MTL W-BEAM GD FEN (STEEL POST)
LF 300.000 $32.000 $30.000 $100.000 $32.800
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 24.000 $1,575.000 $900.000 $1,000.000 $1,071.000
REMOVE METAL BEAM GUARD FENCE
LF 300.000 $7.000 $20.000 $1.000 $1.000
CABLE BARRIER SYSTEM (INSTALL)(TL-3)
LF 500.000 $22.000 $10.000 $14.000 $57.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,166.000 $2,500.000 $3,000.000 $3,109.000
GDRAIL END TRT(INSTALL)(HBA POST)
EA 3.000 $3.000 $2,000.000 $3,500.000 $4,349.000
CRASH CUSH ATTEN (DES SOURCE)
EA 2.000 $2,677.000 $3,500.000 $1,000.000 $990.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $1,511.000 $1,000.000 $500.000 $990.000
CRASH CUSH ATTEN (STKPL)
EA 6.000 $1,092.000 $2,000.000 $500.000 $366.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $4,434.000 $2,000.000 $500.000 $366.000
CHAIN LINK FENCE (REPAIR) (6')
LF 1,000.000 $11.000 $5.000 $5.000 $15.000
GATE (INSTALL) (DOUBLE) (6' X 14')
EA 1.000 $1,219.000 $1,000.000 $500.000 $825.000
GATE (REPAIR) (DOUBLE) (6' X 14')
EA 2.000 $335.000 $1,000.000 $250.000 $468.000
REPLACE LUMINAIRE W/(150W EQ) LED
EA 12.000 $424.000 $750.000 $200.000 $364.000
REMOVE GROUND BOX
EA 5.000 $224.000 $500.000 $200.000 $338.000
ALUMINUM SIGNS (TY A)
SF 100.000 $23.000 $75.000 $30.000 $14.000
ALUMINUM SIGNS (TY G)
SF 100.000 $29.000 $75.000 $30.000 $17.000
ALUMINUM SIGNS (TY O)
SF 100.000 $32.000 $75.000 $30.000 $17.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 300.000 $27.000 $15.000 $30.000 $14.000
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 750.000 $36.000 $20.000 $30.000 $17.000
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 200.000 $27.000 $30.000 $30.000 $17.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 50.000 $323.000 $350.000 $400.000 $113.000
REMOVE SM RD SN SUP&AM
EA 6.000 $103.000 $1,500.000 $500.000 $56.000
REPLACE SRS & S TY10BWG(1) (P)
EA 100.000 $340.000 $100.000 $500.000 $337.000
REPLACE SRS & S TY10BWG(1) (T)
EA 100.000 $340.000 $250.000 $500.000 $123.000
REPLACE SRS & S TY10BWG(1) (U)
EA 100.000 $340.000 $200.000 $500.000 $337.000
REMOVE SM RD SN (FOUNDATION ONLY)
EA 25.000 $100.000 $500.000 $250.000 $282.000
RELOCATE LRSA
EA 50.000 $2,248.000 $500.000 $500.000 $563.000
REMOVE LRSA
EA 50.000 $1,433.000 $250.000 $250.000 $1,499.000
REPLACE LRSA
EA 100.000 $1,070.000 $500.000 $1,000.000 $1,688.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 90.000 $33.000 $100.000 $25.000 $40.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 65.000 $6.000 $25.000 $25.000 $28.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 65.000 $50.000 $50.000 $25.000 $28.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 65.000 $6.000 $25.000 $25.000 $28.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 65.000 $20.000 $50.000 $25.000 $28.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 35.000 $4.000 $100.000 $50.000 $28.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 60.000 $33.000 $200.000 $40.000 $27.000
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
LF 1,500.000 $3.000 $0.500 $10.000 $1.810
REFL PAV MRK TY I (W)8"(LNDP)(090MIL)
LF 1,000.000 $3.000 $1.000 $10.000 $3.360
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 9,000.000 $2.000 $0.250 $10.000 $2.120
REFL PAV MRK TY I (W)12"(LNDP)(090MIL)
LF 1,000.000 $5.000 $1.000 $3.000 $4.650
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 9,000.000 $4.000 $1.000 $3.000 $4.130
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 3,000.000 $6.000 $6.000 $11.000 $9.040
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 48.000 $108.000 $155.000 $206.000 $336.000
REFL PAV MRK TY I(W)(DBL ARROW)(090MIL)
EA 32.000 $142.000 $205.000 $262.000 $439.000
REFL PAV MRK TY I(W)(UTURN ARW)(090MIL)
EA 26.000 $178.000 $205.000 $266.000 $439.000
REFL PAV MRK TY I(W)(LNDP ARW)(090MIL)
EA 8.000 $255.000 $255.000 $308.000 $413.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 48.000 $10.000 $205.000 $254.000 $465.000
REFL PAV MRK TY I(W)(ENTR GORE)(090MIL)
EA 7.000 $629.000 $680.000 $1,251.000 $801.000
REFL PAV MRK TY I(W)(EXIT GORE)(090MIL)
EA 7.000 $669.000 $730.000 $1,266.000 $801.000
REFL PAV MRK TY I (Y)8"(SLD)(090MIL)
LF 1,000.000 $3.000 $1.000 $10.000 $2.330
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
LF 1,000.000 $4.000 $2.000 $10.000 $4.390
REFL PAV MRK TY I (Y)24"(SLD)(090MIL)
LF 200.000 $7.000 $8.000 $11.000 $10.340
RE PV MRK TY I(BLACK)6"(SHADOW)(090MIL)
LF 2,000.000 $2.000 $0.500 $10.000 $1.810
RE PM TY II (W) 12" (SLD)
LF 100.000 $3.000 $4.000 $10.000 $4.130
RE PM TY II (Y) 12" (SLD)
LF 200.000 $3.000 $4.000 $5.000 $4.130
RE PROFILE PM TY I(W)4"(SLD)(090MIL)
LF 200.000 $2.000 $2.000 $10.000 $3.620
TY I HIGH PERF PM (W)6"(BRK)(090MIL)
LF 3,000.000 $2.000 $0.500 $12.000 $1.910
TY I HIGH PERF PM (W)6"(SLD)(090MIL)
LF 3,000.000 $2.000 $0.500 $12.000 $1.910
TY I HIGH PERF PM (Y)4"(SLD)(090MIL)
LF 200.000 $2.000 $2.000 $10.000 $1.550
TY I HIGH PERF PM (Y)6"(SLD)(090MIL)
LF 4,000.000 $2.000 $0.500 $12.000 $1.910
PAVEMENT SLER (ARROW)
EA 48.000 $25.000 $50.000 $55.000 $26.000
PAVEMENT SLER (WORD)
EA 48.000 $29.000 $50.000 $62.000 $26.000
PAVEMENT SLER (DBL ARROW)
EA 32.000 $29.000 $50.000 $66.000 $57.000
PAVEMENT SLER (UTURN ARROW)
EA 26.000 $27.000 $50.000 $67.000 $57.000
PAVEMENT SLER (LN REDUCT ARROW)
EA 8.000 $30.000 $50.000 $80.000 $57.000
PAVEMENT SLER (ENTR GORE)
EA 7.000 $89.000 $420.000 $253.000 $129.000
PAVEMENT SLER (EXIT GORE)
EA 7.000 $96.000 $420.000 $253.000 $129.000
PREFAB PM TY C (W)(6")(BRK)
LF 1,000.000 $11.000 $5.500 $10.000 $15.500
PREFAB PM TY C (MULTI)(SHIELD)
EA 6.000 $1,073.000 $3,000.000 $3,000.000 $2,274.000
REFL PAV MRKR TY I-A
EA 40.000 $5.000 $10.000 $25.000 $8.270
REFL PAV MRKR TY I-C
EA 40.000 $5.000 $10.000 $25.000 $8.270
REFL PAV MRKR TY II-A-A
EA 100.000 $5.000 $10.000 $25.000 $7.750
REFL PAV MRKR TY II-C-R
EA 350.000 $5.000 $10.000 $25.000 $7.750
ELIM EXT PM & MRKS (4")
LF 50.000 $2.000 $2.500 $25.000 $1.550
ELIM EXT PM & MRKS (6")
LF 50.000 $2.000 $2.600 $25.000 $2.070
ELIM EXT PM & MRKS (8")
LF 50.000 $2.000 $2.800 $25.000 $3.100
ELIM EXT PM & MRKS (12")
LF 50.000 $2.000 $4.000 $25.000 $5.170
ELIM EXT PM & MRKS (ARROW)
EA 48.000 $39.000 $60.000 $95.000 $67.000
ELIM EXT PM & MRKS (DBL ARROW)
EA 32.000 $51.000 $60.000 $114.000 $109.000
ELIM EXT PM & MRKS (UTURN ARROW)
EA 26.000 $50.000 $60.000 $92.000 $109.000
ELIM EXT PM & MRKS (WORD)
EA 48.000 $46.000 $60.000 $104.000 $109.000
ELIM EXT PM & MRKS (ENTR GORE)
EA 7.000 $140.000 $205.000 $557.000 $517.000
ELIM EXT PM & MRKS (EXIT GORE)
EA 7.000 $148.000 $205.000 $600.000 $517.000
ELIM EXT PM & MRKS (SHIELD)
EA 6.000 $126.000 $205.000 $250.000 $517.000
PAV SURF PREP FOR MRK (4")
LF 50.000 $2.000 $3.000 $25.000 $1.000
PAV SURF PREP FOR MRK (6")
LF 50.000 $2.000 $3.100 $25.000 $1.000
PAV SURF PREP FOR MRK (8")
LF 50.000 $2.000 $3.200 $25.000 $1.000
PAV SURF PREP FOR MRK (12")
LF 50.000 $2.000 $4.000 $25.000 $1.000
PAV SURF PREP FOR MRK (ARROW)
EA 48.000 $10.000 $50.000 $41.000 $36.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 32.000 $13.000 $50.000 $34.000 $47.000
PAV SURF PREP FOR MRK (UTURN ARR)
EA 26.000 $12.000 $50.000 $31.000 $47.000
PAV SURF PREP FOR MRK (WORD)
EA 48.000 $10.000 $75.000 $47.000 $47.000
PAV SURF PREP FOR MRK (ENTR GORE)
EA 7.000 $24.000 $200.000 $123.000 $78.000
PAV SURF PREP FOR MRK (EXIT GORE)
EA 7.000 $29.000 $200.000 $135.000 $78.000
PAV SURF PREP FOR MRK (SHIELD)
EA 6.000 $170.000 $200.000 $92.000 $103.000
PAV SURF PREP FOR MRK (RPM)
EA 530.000 $2.000 $5.000 $3.000 $0.260
REMOVAL OF CONDUIT
LF 200.000 $5.500 $10.000 $5.000 $8.090
INSTALL OF CONDUIT BY TRENCHING
LF 300.000 $9.500 $10.000 $50.000 $9.000
INSTALL OF CONDUIT BY JACKING
LF 300.000 $9.500 $20.000 $1.000 $13.000
INSTALL OF CONDUIT BY BORING
LF 300.000 $9.500 $20.000 $100.000 $16.000
REMOVAL OF CABLES
LF 1,000.000 $1.000 $3.000 $1.000 $0.730
REPLACE OF CABLES
LF 10,000.000 $2.000 $0.500 $3.000 $2.250
REPLACE OF ELECTRICAL SERVICE
EA 10.000 $2,774.000 $1,000.000 $2,000.000 $7,696.000
INSTALL OF ELECTRICAL SERVICE
EA 50.000 $78.000 $100.000 $2,000.000 $7,085.000
REPLACE OF LUMINAIRE MAST ARMS
EA 10.000 $392.000 $1,000.000 $1,159.000 $1,568.000
REPLACE LUMINAIRE POLE
EA 30.000 $486.000 $1,500.000 $1,500.000 $3,136.000
REPLACE ABOVE-GROUND CONDUIT
LF 100.000 $15.000 $30.000 $5.000 $58.540
INSTALL UNDERGROUND CONDUIT
LF 1,000.000 $8.500 $10.000 $5.000 $9.360
REPLACE UNDERGROUND CONDUIT
LF 1,000.000 $11.000 $20.000 $5.000 $12.760
INSTALL CONDUCTOR
LF 15,000.000 $2.000 $1.750 $3.000 $1.260
REMOVE CONDUCTOR
LF 1,000.000 $1.000 $3.000 $3.000 $0.410
REPLACE CONDUCTOR
LF 10,000.000 $2.000 $2.500 $2.000 $1.510
ROAD BORE
LF 1,000.000 $22.000 $20.000 $15.000 $15.580
INSTALL ROADWAY ILLUM ASSEMBLY (LED)
EA 75.000 $973.000 $100.000 $500.000 $4,129.000
REMOVE UNDERPASS LUMINAIRE (HPS)
EA 16.000 $220.000 $10.000 $200.000 $220.000
INSTALL UNDERPASS LUMINAIRE (LED)
EA 44.000 $808.000 $100.000 $175.000 $863.000
REPLACE LUMINAIRE FIXTURE (LED)
EA 35.000 $458.000 $500.000 $500.000 $559.000
REPLACE STEEL SERVICE POLE
EA 3.000 $2,887.000 $3,000.000 $1,000.000 $3,889.000
INSTALL GROUND BOX W/APRON
EA 10.000 $963.000 $500.000 $500.000 $826.000
INSTALL FOUNDATION
EA 15.000 $2,132.000 $1,000.000 $500.000 $1,306.000
REMOVE FOUNDATION
EA 10.000 $500.000 $1,500.000 $500.000 $661.000
REPLACE TRANSFORMER BASE
EA 20.000 $585.000 $200.000 $200.000 $1,708.000
REPLACE TRANSFORMER BASE COVER
EA 10.000 $6.500 $250.000 $250.000 $208.000
REPLACE HAND HOLE COVER
EA 20.000 $6.500 $400.000 $250.000 $104.000
INSTALL GROUND ROD
EA 10.000 $12.000 $200.000 $50.000 $129.000
REPLACE BALLAST
EA 10.000 $104.000 $100.000 $175.000 $472.000
REPLACE FUSED DISCONNECT
EA 25.000 $273.000 $100.000 $200.000 $606.000
REPLACE LAMP (POLE MOUNT FIXTURE)
EA 100.000 $100.000 $50.000 $25.000 $531.000
REPLACE LAMP (UNDERPASS FIXTURE)
EA 25.000 $86.000 $70.000 $25.000 $899.000
REPLACE LAMP (WALL PACK FIXTURE)
EA 10.000 $145.000 $10.000 $25.000 $779.000
REPLACE WALL PACK LUMINAIRE
EA 10.000 $145.000 $10.000 $20.000 $827.000
REPLACE LENS (POLE MOUNTED FIXTURE)
EA 5.000 $110.000 $100.000 $50.000 $375.000
REPLACE LENS (UNDERPASS FIXTURE)
EA 5.000 $110.000 $100.000 $50.000 $369.000
REPLACE LENS (WALL PACK FIXTURE)
EA 5.000 $82.000 $10.000 $50.000 $353.000
REPLACE WALL PACK GUARD
EA 2.000 $82.000 $100.000 $50.000 $381.000
REPLACE FUSE
EA 100.000 $39.000 $75.000 $30.000 $96.000
REPLACE FUSE HOLDER
EA 5.000 $35.000 $500.000 $100.000 $151.000
REPLACE BREAKAWAY FUSE HOLDER
EA 150.000 $74.000 $75.000 $50.000 $151.000
REPLACE STARTING AID
EA 10.000 $82.000 $75.000 $200.000 $472.000
REPLACE PHOTOCELL AND BRACKET
EA 50.000 $60.000 $150.000 $250.000 $321.000
REPLACE CONTROL TRANS (ELECT SERVICE)
EA 1.000 $62.000 $3,500.000 $500.000 $209.000
REPLACE CONTROL CIRCUIT (ELECT SERVICE)
EA 1.000 $86.000 $3,500.000 $500.000 $401.000
REPLACE AVIATION WARNING FIXTURE
EA 5.000 $268.000 $100.000 $50.000 $492.000
REPLACE AVIATION WARNING LAMP
EA 5.000 $11.000 $100.000 $50.000 $492.000
REPLACE HAND-OFF-AUTO SWITCH
EA 20.000 $83.000 $100.000 $120.000 $205.000
REPLACE CONTACTOR
EA 25.000 $150.000 $300.000 $100.000 $135.000
REPLACE METER BASE
EA 25.000 $94.000 $100.000 $100.000 $613.000
REPLACE TIME CLOCK
EA 10.000 $137.000 $250.000 $120.000 $466.000
REPLACE BREAKER PANEL
EA 15.000 $751.000 $250.000 $350.000 $2,184.000
REPLACE CIRCUIT BREAKER
EA 50.000 $277.000 $100.000 $175.000 $362.000
REPLACE TWIST LOCK CONNECTOR
EA 10.000 $221.000 $100.000 $175.000 $148.000
REPLACE SAFETY LANYARD
LF 5.000 $2.000 $100.000 $50.000 $274.000
RE-STRAP EXISTING CONDUIT
EA 100.000 $40.000 $50.000 $50.000 $32.000
REPLACE NUTS, WASHERS & OTHER HARDWARE
EA 10.000 $275.000 $500.000 $10.000 $216.000
TROUBLESHOOT FOR REPAIRS
HR 300.000 $69.000 $325.000 $100.000 $134.000
REPLACE LUMINAIRES
EA 10.000 $104.000 $750.000 $200.000 $585.000
REPLACE LAMP FOR UNDERPASS FIXTRE 150W
EA 10.000 $110.000 $100.000 $20.000 $833.000
POTHOLE REPAIR (STANDARD)
CY 8.000 $92.000 $1,000.000 $200.000 $480.000
JT CLEANING AND SEALING(TRANS CNTR JTS)
LF 500.000 $15.000 $35.000 $15.000 $27.000
JT CLEANING AND SEALING (EXPANSION JTS)
LF 500.000 $15.000 $77.000 $15.000 $27.000
SPALLING REPAIR (HYDRAULIC CEMENT)
CF 60.000 $66.000 $410.000 $200.000 $82.000
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
GAL 5.000 $33.000 $500.000 $300.000 $301.000
FULL - WIDTH MOWING - TRACT (1)
AC 5,112.000 $44.000 $35.000 $47.000 $52.000
FULL - WIDTH MOWING - TRACT (2)
AC 3,660.000 $44.000 $35.000 $51.000 $52.000
FULL - WIDTH MOWING - TRACT (3)
AC 2,064.000 $39.000 $35.000 $50.000 $52.000
SPOT MOWING
AC 6.000 $50.000 $500.000 $500.000 $3,198.000
PAVEMENT EDGES, STRUCTURES & FIXTURES
MI 218.000 $357.000 $400.000 $275.000 $200.000
BROADCAST APPLICATION
AC 100.000 $84.000 $120.000 $100.000 $55.000
WICK APPLICATION OF HERBICIDE
AC 75.000 $29.000 $20.000 $100.000 $263.000
LITTER REMOVAL (SPOT)
AC 20.000 $18.000 $1,000.000 $500.000 $155.000
LITTER REMOVAL - TRACT (1)
CYC 48.000 $1,207.000 $6,000.000 $1,500.000 $2,178.000
LITTER REMOVAL - TRACT (2)
CYC 48.000 $852.000 $4,300.000 $1,500.000 $2,178.000
LITTER REMOVAL - TRACT (3)
CYC 48.000 $1,566.000 $3,000.000 $1,500.000 $2,178.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (1)
CYC 72.000 $1,149.000 $1,800.000 $25.000 $1,578.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (2)
CYC 72.000 $1,261.000 $1,800.000 $29.000 $789.000
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (3)
CYC 72.000 $654.000 $1,800.000 $28.000 $789.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(1)
CYC 24.000 $3,516.000 $1,800.000 $30.000 $1,487.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(2)
CYC 24.000 $1,137.000 $1,900.000 $26.000 $1,559.000
CLEAN / SWEEP - CENTER MEDIAN - AREA(3)
CYC 24.000 $1,050.000 $1,400.000 $28.000 $958.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(1)
CYC 24.000 $3,449.000 $1,800.000 $31.000 $1,487.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(2)
CYC 24.000 $1,137.000 $1,900.000 $26.000 $1,559.000
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(3)
CYC 24.000 $1,050.000 $1,400.000 $25.000 $958.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(1)
CYC 12.000 $1,815.000 $1,600.000 $27.000 $1,202.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(2)
CYC 12.000 $1,068.000 $1,600.000 $30.000 $1,260.000
CLEAN / SWEEP - FRONTAGE ROAD - AREA(3)
CYC 12.000 $1,006.000 $1,300.000 $33.000 $774.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 1)
CYC 12.000 $1,261.000 $1,600.000 $31.000 $1,202.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 2)
CYC 12.000 $1,168.000 $1,600.000 $32.000 $1,260.000
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 3)
CYC 12.000 $1,267.000 $1,300.000 $30.000 $774.000
CLEANING / SWEEPING (HANDWORK)
SY 35,000.000 $2.000 $1.000 $0.100 $0.790
GRAFFITI REMOVAL (WATER BLAST CLEAN)
SF 1,500.000 $3.000 $3.000 $2.000 $1.090
GRAFFITI REMOVAL (PAINTING)
SF 1,500.000 $3.000 $6.000 $5.000 $4.380
GRAFFITI REMOVAL (CHEMICAL CLEANING)
SF 300.000 $4.000 $10.000 $5.000 $8.730
ANTI-GRAFFITI COATING (PERMNENT-TY II)
SF 1,500.000 $2.000 $5.000 $1.000 $4.380
ANTI-GRAFFITI COATNG (PERMNENT-TY III)
SF 1,500.000 $5.000 $5.000 $1.000 $4.620
TREE TRIMMING / BRUSH REMOVAL
MI 24.000 $1,917.000 $500.000 $100.000 $2,615.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 20.000 $1,320.000 $500.000 $1,000.000 $2,140.000
STUMP REMOVAL
EA 6.000 $31.000 $500.000 $1,000.000 $428.000
TREE REMOVAL (4" - 12" DIA)
EA 15.000 $108.000 $350.000 $300.000 $209.000
TREE REMOVAL (12" - 18" DIA)
EA 15.000 $214.000 $350.000 $300.000 $503.000
TREE REMOVAL (18" - 24" DIA)
EA 15.000 $317.000 $250.000 $300.000 $503.000
TREE REMOVAL (24" - 30" DIA)
EA 15.000 $369.000 $250.000 $300.000 $797.000
TREE REMOVAL (30" - 36" DIA)
EA 6.000 $478.000 $500.000 $300.000 $993.000
TREE REMOVAL (36" - 42" DIA)
EA 6.000 $1,368.000 $500.000 $300.000 $1,319.000
TREE REMOVAL (42" - 48" DIA)
EA 6.000 $3,286.000 $500.000 $300.000 $1,319.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 1,000.000 $3.000 $15.000 $10.000 $1.280
DITCH CLEAN/RESHAPING(CU YD IN VEHICLE)
CY 1,000.000 $18.000 $30.000 $25.000 $23.000
DRAIN INLET CLEANING
EA 50.000 $90.000 $100.000 $50.000 $52.000
STORM SEWER CLEANING (PIPE) (<12" DIA)
LF 100.000 $3.000 $4.000 $6.000 $3.100
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
LF 900.000 $6.000 $5.500 $9.000 $4.650
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
LF 1,400.000 $7.000 $6.000 $12.000 $4.910
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
LF 950.000 $8.000 $7.000 $14.000 $5.170
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
LF 900.000 $11.000 $7.500 $15.000 $5.430
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
LF 400.000 $15.000 $8.500 $19.000 $6.720
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
LF 200.000 $16.500 $10.000 $22.000 $8.270
STORM SEWER CLEAN (BOX CULV) (6-<12 SF)
LF 110.000 $15.000 $12.000 $7.000 $10.300
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
LF 100.000 $20.000 $15.000 $11.000 $13.400
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
LF 90.000 $27.000 $18.000 $16.000 $16.500
STORM SEWER CLEAN (BOX CULV)(48-<96 SF)
LF 50.000 $28.000 $20.000 $20.000 $18.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 5,000.000 $25.000 $9.000 $20.000 $14.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 300.000 $26.000 $30.000 $15.000 $20.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 30.000 $36.000 $200.000 $165.000 $12.000
REPLACE STEEL POST W/O CONC FND
EA 30.000 $73.000 $100.000 $200.000 $21.000
REPLACE STEEL POST W/ CONC FND
EA 450.000 $61.000 $65.000 $56.000 $31.000
REALIGN POSTS
EA 120.000 $24.000 $25.000 $100.000 $1.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 30.000 $1,268.000 $1,000.000 $1,000.000 $590.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,500.000 $34.000 $30.000 $22.000 $7.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 300.000 $67.000 $65.000 $56.000 $20.000
REPAIR STEEL POST WITH BASE PLATE
EA 6.000 $297.000 $1,000.000 $315.000 $124.000
RESET SGT IMPACT HEAD
EA 30.000 $124.000 $100.000 $25.000 $12.000
REPLACE SGT OBJECT MARKER
EA 20.000 $33.000 $150.000 $20.000 $20.000
REPLACE SGT CABLE ANCHOR
EA 24.000 $105.000 $100.000 $70.000 $7.000
REPLACE SGT CABLE ASSEMBLY
EA 18.000 $130.000 $100.000 $78.000 $60.000
REPLACE SGT STRUT
EA 12.000 $93.000 $250.000 $80.000 $41.000
REPLACE POSTS (TL-3)(GIBRALTAR)
EA 350.000 $81.000 $115.000 $150.000 $155.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 16.000 $422.000 $300.000 $302.000 $610.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 18.000 $173.000 $250.000 $100.000 $41.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 13.000 $1,806.000 $1,500.000 $1,700.000 $3,101.000
REPLACE CABLE (TL-3)
LF 9,500.000 $4.200 $0.500 $3.000 $2.100
CHECK / RE-TENSION CABLE (TL-3)
EA 25.000 $249.000 $750.000 $500.000 $36.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 300.000 $12.000 $25.000 $15.000 $2.100
REPLACE (SMTC) NARROW
EA 1.000 $1,000.000 $26,000.000 $10,000.000 $30,749.000
REPAIR (SMTC) NARROW
LF 21.000 $300.000 $400.000 $200.000 $73.000
REPLACE (SMTC) WIDE
EA 1.000 $600.000 $30,000.000 $10,000.000 $36,950.000
REPAIR (SMTC) WIDE
LF 50.000 $200.000 $300.000 $200.000 $73.000
REPLACE (QUAD - ELITE) NARROW
EA 1.000 $2,000.000 $26,000.000 $10,000.000 $12,920.000
REPAIR (QUAD - ELITE) NARROW
LF 27.000 $300.000 $400.000 $200.000 $63.000
REPLACE (QUAD - ELITE) WIDE
EA 1.000 $1,000.000 $36,000.000 $10,000.000 $20,814.000
REPAIR (QUAD - ELITE) WIDE
LF 27.000 $500.000 $400.000 $200.000 $63.000
REPAIR (NARROW QUAD NOSE)
EA 1.000 $200.000 $10,000.000 $2,000.000 $150.000
REPAIR (STEEL RAIL)
LF 150.000 $16.500 $50.000 $200.000 $8.300
CNC CRACK REPAIR (FLOOD)(GRAVITY)
SF 8,000.000 $16.000 $5.000 $15.000 $10.000
SNOW AND ICE CONTROL (TRUCK)
HR 72.000 $47.000 $150.000 $50.000 $118.000
SNOW AND ICE CONTROL (SHADOW VEHICLE)
HR 216.000 $41.000 $120.000 $50.000 $10.000
SNOW AND ICE CONTROL (LOADER)
HR 72.000 $73.000 $50.000 $50.000 $124.000
SNOW AND ICE CONTROL (SEASON)
MO 6.000 $24,877.000 $12,500.000 $50,000.000 $83,333.000
SNOW AND ICE CONTROL (SPRAY RIG)
HR 144.000 $63.000 $100.000 $250.000 $216.000
INCIDENT MANAGEMENT (TYPE A)
HR 8.000 $53.000 $250.000 $300.000 $217.000
INCIDENT MANAGEMENT (TYPE B)
HR 8.000 $58.000 $250.000 $300.000 $264.000
INCIDENT MANAGEMENT (TYPE E)
HR 8.000 $81.000 $250.000 $300.000 $264.000
INCIDENT MANAGEMENT (TYPE F)
HR 8.000 $89.000 $250.000 $300.000 $217.000
INCIDENT MANAGEMENT (TYPE G)
HR 8.000 $44.000 $250.000 $300.000 $217.000
INCIDENT MANAGEMENT (TYPE H)
HR 8.000 $47.000 $250.000 $300.000 $264.000
INCIDENT MANAGEMENT (TYPE I)
HR 8.000 $67.000 $250.000 $300.000 $217.000
INCIDENT MANAGMENT (TYPE J)
HR 8.000 $36.000 $300.000 $300.000 $21.000
VACUUM CLEANING OF BRIDGE JOINTS
CYC 2.000 $14,437.000 $10,000.000 $10,000.000 $2,736.000
Totals: $6,109,209.000 $4,579,980.000 $5,799,929.000 $7,444,010.500