REMOV CONC (RIPRAP)
|
SY
|
100.000
|
$38.000
|
$50.000
|
$49.000
|
$5.000
|
|
|
REMOV CONC (CURB)
|
LF
|
50.000
|
$6.500
|
$25.000
|
$18.000
|
$5.000
|
|
|
BACKFILL (TY A OR B)(VEH)
|
CY
|
500.000
|
$112.000
|
$20.000
|
$20.000
|
$15.000
|
|
|
BLADING
|
STA
|
100.000
|
$57.000
|
$150.000
|
$50.000
|
$126.000
|
|
|
SPOT SODDING
|
SY
|
300.000
|
$7.000
|
$15.000
|
$12.000
|
$50.000
|
|
|
BLOCK SODDING
|
SY
|
500.000
|
$8.000
|
$20.000
|
$24.000
|
$50.000
|
|
|
BROADCAST SEED (PERM_RURAL_SAND)
|
SY
|
1,000.000
|
$3.000
|
$10.000
|
$5.000
|
$4.660
|
|
|
FERTILIZER
|
AC
|
5.000
|
$1,011.000
|
$500.000
|
$1,000.000
|
$2,095.000
|
|
|
VEGETATIVE WATERING
|
TGL
|
30,000.000
|
$42.000
|
$0.250
|
$6.000
|
$10.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
100.000
|
$50.000
|
$250.000
|
$100.000
|
$141.000
|
|
|
FULL-DEPTH REPAIR CRCP (VAR DEPTH)
|
CY
|
78.000
|
$385.000
|
$250.000
|
$500.000
|
$613.000
|
|
|
FULL-DEPTH REP(BR APPR SLAB)(9"-13")
|
CY
|
27.000
|
$656.000
|
$500.000
|
$500.000
|
$613.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
100.000
|
$317.000
|
$150.000
|
$250.000
|
$396.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
150.000
|
$234.000
|
$150.000
|
$400.000
|
$14.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
75.000
|
$228.000
|
$200.000
|
$100.000
|
$8.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
75.000
|
$3,990.000
|
$300.000
|
$350.000
|
$609.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
60.000
|
$486.000
|
$750.000
|
$350.000
|
$609.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
30.000
|
$590.000
|
$700.000
|
$350.000
|
$254.000
|
|
|
RIPRAP (STONE TY R)(DRY)(18 IN)
|
CY
|
100.000
|
$152.000
|
$100.000
|
$250.000
|
$148.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
100.000
|
$273.000
|
$100.000
|
$250.000
|
$99.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
100.000
|
$200.000
|
$250.000
|
$250.000
|
$148.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
100.000
|
$200.000
|
$100.000
|
$250.000
|
$155.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
10.000
|
$44.000
|
$500.000
|
$100.000
|
$10.000
|
|
|
CLEANING AND SEALING EXIST JOINTS (CL3)
|
LF
|
1,000.000
|
$25.000
|
$25.000
|
$15.000
|
$19.000
|
|
|
CLEANING AND SEALING EXIST JOINTS (CL7)
|
LF
|
1,000.000
|
$30.000
|
$45.000
|
$15.000
|
$19.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
104.000
|
$840.000
|
$5.000
|
$1.000
|
$463.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
104.000
|
$637.000
|
$5.000
|
$1.000
|
$925.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
28.000
|
$84.000
|
$250.000
|
$1,500.000
|
$190.000
|
|
|
TMA (STATIONARY)
|
DAY
|
156.000
|
$282.000
|
$100.000
|
$4,000.000
|
$4,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
2,000.000
|
$86.000
|
$90.000
|
$400.000
|
$400.000
|
|
|
EMBANK (EROSN & SEDMT CONT, IN PLACE)
|
CY
|
500.000
|
$72.000
|
$40.000
|
$70.000
|
$40.000
|
|
|
EXCAV (EROSN & SEDMT CONT, IN VEH)
|
CY
|
500.000
|
$35.000
|
$40.000
|
$70.000
|
$40.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
60.000
|
$9.000
|
$50.000
|
$1,000.000
|
$10.910
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
510.000
|
$11.000
|
$10.000
|
$100.000
|
$9.900
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
560.000
|
$4.000
|
$10.000
|
$10.000
|
$9.900
|
|
|
LANDSCAPE PAVERS
|
SY
|
400.000
|
$31.000
|
$10.000
|
$1.000
|
$144.000
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
400.000
|
$33.000
|
$10.000
|
$1.000
|
$116.000
|
|
|
CONC CURB (TY II)
|
LF
|
500.000
|
$18.000
|
$25.000
|
$15.000
|
$3.200
|
|
|
CONC SIDEWALKS (4")
|
SY
|
100.000
|
$69.000
|
$150.000
|
$100.000
|
$90.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
300.000
|
$32.000
|
$30.000
|
$100.000
|
$32.800
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
24.000
|
$1,575.000
|
$900.000
|
$1,000.000
|
$1,071.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
300.000
|
$7.000
|
$20.000
|
$1.000
|
$1.000
|
|
|
CABLE BARRIER SYSTEM (INSTALL)(TL-3)
|
LF
|
500.000
|
$22.000
|
$10.000
|
$14.000
|
$57.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$3,166.000
|
$2,500.000
|
$3,000.000
|
$3,109.000
|
|
|
GDRAIL END TRT(INSTALL)(HBA POST)
|
EA
|
3.000
|
$3.000
|
$2,000.000
|
$3,500.000
|
$4,349.000
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
2.000
|
$2,677.000
|
$3,500.000
|
$1,000.000
|
$990.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
6.000
|
$1,511.000
|
$1,000.000
|
$500.000
|
$990.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
6.000
|
$1,092.000
|
$2,000.000
|
$500.000
|
$366.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$4,434.000
|
$2,000.000
|
$500.000
|
$366.000
|
|
|
CHAIN LINK FENCE (REPAIR) (6')
|
LF
|
1,000.000
|
$11.000
|
$5.000
|
$5.000
|
$15.000
|
|
|
GATE (INSTALL) (DOUBLE) (6' X 14')
|
EA
|
1.000
|
$1,219.000
|
$1,000.000
|
$500.000
|
$825.000
|
|
|
GATE (REPAIR) (DOUBLE) (6' X 14')
|
EA
|
2.000
|
$335.000
|
$1,000.000
|
$250.000
|
$468.000
|
|
|
REPLACE LUMINAIRE W/(150W EQ) LED
|
EA
|
12.000
|
$424.000
|
$750.000
|
$200.000
|
$364.000
|
|
|
REMOVE GROUND BOX
|
EA
|
5.000
|
$224.000
|
$500.000
|
$200.000
|
$338.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
100.000
|
$23.000
|
$75.000
|
$30.000
|
$14.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
100.000
|
$29.000
|
$75.000
|
$30.000
|
$17.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
100.000
|
$32.000
|
$75.000
|
$30.000
|
$17.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
300.000
|
$27.000
|
$15.000
|
$30.000
|
$14.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
750.000
|
$36.000
|
$20.000
|
$30.000
|
$17.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
200.000
|
$27.000
|
$30.000
|
$30.000
|
$17.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
50.000
|
$323.000
|
$350.000
|
$400.000
|
$113.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
6.000
|
$103.000
|
$1,500.000
|
$500.000
|
$56.000
|
|
|
REPLACE SRS & S TY10BWG(1) (P)
|
EA
|
100.000
|
$340.000
|
$100.000
|
$500.000
|
$337.000
|
|
|
REPLACE SRS & S TY10BWG(1) (T)
|
EA
|
100.000
|
$340.000
|
$250.000
|
$500.000
|
$123.000
|
|
|
REPLACE SRS & S TY10BWG(1) (U)
|
EA
|
100.000
|
$340.000
|
$200.000
|
$500.000
|
$337.000
|
|
|
REMOVE SM RD SN (FOUNDATION ONLY)
|
EA
|
25.000
|
$100.000
|
$500.000
|
$250.000
|
$282.000
|
|
|
RELOCATE LRSA
|
EA
|
50.000
|
$2,248.000
|
$500.000
|
$500.000
|
$563.000
|
|
|
REMOVE LRSA
|
EA
|
50.000
|
$1,433.000
|
$250.000
|
$250.000
|
$1,499.000
|
|
|
REPLACE LRSA
|
EA
|
100.000
|
$1,070.000
|
$500.000
|
$1,000.000
|
$1,688.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
90.000
|
$33.000
|
$100.000
|
$25.000
|
$40.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
|
EA
|
65.000
|
$6.000
|
$25.000
|
$25.000
|
$28.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
65.000
|
$50.000
|
$50.000
|
$25.000
|
$28.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
|
EA
|
65.000
|
$6.000
|
$25.000
|
$25.000
|
$28.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
65.000
|
$20.000
|
$50.000
|
$25.000
|
$28.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
35.000
|
$4.000
|
$100.000
|
$50.000
|
$28.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
60.000
|
$33.000
|
$200.000
|
$40.000
|
$27.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
|
LF
|
1,500.000
|
$3.000
|
$0.500
|
$10.000
|
$1.810
|
|
REFL PAV MRK TY I (W)8"(LNDP)(090MIL)
|
LF
|
1,000.000
|
$3.000
|
$1.000
|
$10.000
|
$3.360
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
9,000.000
|
$2.000
|
$0.250
|
$10.000
|
$2.120
|
|
REFL PAV MRK TY I (W)12"(LNDP)(090MIL)
|
LF
|
1,000.000
|
$5.000
|
$1.000
|
$3.000
|
$4.650
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
9,000.000
|
$4.000
|
$1.000
|
$3.000
|
$4.130
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
3,000.000
|
$6.000
|
$6.000
|
$11.000
|
$9.040
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
48.000
|
$108.000
|
$155.000
|
$206.000
|
$336.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(090MIL)
|
EA
|
32.000
|
$142.000
|
$205.000
|
$262.000
|
$439.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(090MIL)
|
EA
|
26.000
|
$178.000
|
$205.000
|
$266.000
|
$439.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(090MIL)
|
EA
|
8.000
|
$255.000
|
$255.000
|
$308.000
|
$413.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
48.000
|
$10.000
|
$205.000
|
$254.000
|
$465.000
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(090MIL)
|
EA
|
7.000
|
$629.000
|
$680.000
|
$1,251.000
|
$801.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(090MIL)
|
EA
|
7.000
|
$669.000
|
$730.000
|
$1,266.000
|
$801.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(090MIL)
|
LF
|
1,000.000
|
$3.000
|
$1.000
|
$10.000
|
$2.330
|
|
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
|
LF
|
1,000.000
|
$4.000
|
$2.000
|
$10.000
|
$4.390
|
|
REFL PAV MRK TY I (Y)24"(SLD)(090MIL)
|
LF
|
200.000
|
$7.000
|
$8.000
|
$11.000
|
$10.340
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(090MIL)
|
LF
|
2,000.000
|
$2.000
|
$0.500
|
$10.000
|
$1.810
|
|
RE PM TY II (W) 12" (SLD)
|
LF
|
100.000
|
$3.000
|
$4.000
|
$10.000
|
$4.130
|
|
RE PM TY II (Y) 12" (SLD)
|
LF
|
200.000
|
$3.000
|
$4.000
|
$5.000
|
$4.130
|
|
RE PROFILE PM TY I(W)4"(SLD)(090MIL)
|
LF
|
200.000
|
$2.000
|
$2.000
|
$10.000
|
$3.620
|
|
TY I HIGH PERF PM (W)6"(BRK)(090MIL)
|
LF
|
3,000.000
|
$2.000
|
$0.500
|
$12.000
|
$1.910
|
|
TY I HIGH PERF PM (W)6"(SLD)(090MIL)
|
LF
|
3,000.000
|
$2.000
|
$0.500
|
$12.000
|
$1.910
|
|
TY I HIGH PERF PM (Y)4"(SLD)(090MIL)
|
LF
|
200.000
|
$2.000
|
$2.000
|
$10.000
|
$1.550
|
|
TY I HIGH PERF PM (Y)6"(SLD)(090MIL)
|
LF
|
4,000.000
|
$2.000
|
$0.500
|
$12.000
|
$1.910
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
48.000
|
$25.000
|
$50.000
|
$55.000
|
$26.000
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
48.000
|
$29.000
|
$50.000
|
$62.000
|
$26.000
|
|
|
PAVEMENT SLER (DBL ARROW)
|
EA
|
32.000
|
$29.000
|
$50.000
|
$66.000
|
$57.000
|
|
|
PAVEMENT SLER (UTURN ARROW)
|
EA
|
26.000
|
$27.000
|
$50.000
|
$67.000
|
$57.000
|
|
|
PAVEMENT SLER (LN REDUCT ARROW)
|
EA
|
8.000
|
$30.000
|
$50.000
|
$80.000
|
$57.000
|
|
|
PAVEMENT SLER (ENTR GORE)
|
EA
|
7.000
|
$89.000
|
$420.000
|
$253.000
|
$129.000
|
|
|
PAVEMENT SLER (EXIT GORE)
|
EA
|
7.000
|
$96.000
|
$420.000
|
$253.000
|
$129.000
|
|
PREFAB PM TY C (W)(6")(BRK)
|
LF
|
1,000.000
|
$11.000
|
$5.500
|
$10.000
|
$15.500
|
|
PREFAB PM TY C (MULTI)(SHIELD)
|
EA
|
6.000
|
$1,073.000
|
$3,000.000
|
$3,000.000
|
$2,274.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
40.000
|
$5.000
|
$10.000
|
$25.000
|
$8.270
|
|
REFL PAV MRKR TY I-C
|
EA
|
40.000
|
$5.000
|
$10.000
|
$25.000
|
$8.270
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
100.000
|
$5.000
|
$10.000
|
$25.000
|
$7.750
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
350.000
|
$5.000
|
$10.000
|
$25.000
|
$7.750
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
50.000
|
$2.000
|
$2.500
|
$25.000
|
$1.550
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
50.000
|
$2.000
|
$2.600
|
$25.000
|
$2.070
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
50.000
|
$2.000
|
$2.800
|
$25.000
|
$3.100
|
|
|
ELIM EXT PM & MRKS (12")
|
LF
|
50.000
|
$2.000
|
$4.000
|
$25.000
|
$5.170
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
48.000
|
$39.000
|
$60.000
|
$95.000
|
$67.000
|
|
|
ELIM EXT PM & MRKS (DBL ARROW)
|
EA
|
32.000
|
$51.000
|
$60.000
|
$114.000
|
$109.000
|
|
|
ELIM EXT PM & MRKS (UTURN ARROW)
|
EA
|
26.000
|
$50.000
|
$60.000
|
$92.000
|
$109.000
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
48.000
|
$46.000
|
$60.000
|
$104.000
|
$109.000
|
|
|
ELIM EXT PM & MRKS (ENTR GORE)
|
EA
|
7.000
|
$140.000
|
$205.000
|
$557.000
|
$517.000
|
|
|
ELIM EXT PM & MRKS (EXIT GORE)
|
EA
|
7.000
|
$148.000
|
$205.000
|
$600.000
|
$517.000
|
|
|
ELIM EXT PM & MRKS (SHIELD)
|
EA
|
6.000
|
$126.000
|
$205.000
|
$250.000
|
$517.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
50.000
|
$2.000
|
$3.000
|
$25.000
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
50.000
|
$2.000
|
$3.100
|
$25.000
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
50.000
|
$2.000
|
$3.200
|
$25.000
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
50.000
|
$2.000
|
$4.000
|
$25.000
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
48.000
|
$10.000
|
$50.000
|
$41.000
|
$36.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
32.000
|
$13.000
|
$50.000
|
$34.000
|
$47.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
26.000
|
$12.000
|
$50.000
|
$31.000
|
$47.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
48.000
|
$10.000
|
$75.000
|
$47.000
|
$47.000
|
|
|
PAV SURF PREP FOR MRK (ENTR GORE)
|
EA
|
7.000
|
$24.000
|
$200.000
|
$123.000
|
$78.000
|
|
|
PAV SURF PREP FOR MRK (EXIT GORE)
|
EA
|
7.000
|
$29.000
|
$200.000
|
$135.000
|
$78.000
|
|
|
PAV SURF PREP FOR MRK (SHIELD)
|
EA
|
6.000
|
$170.000
|
$200.000
|
$92.000
|
$103.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
530.000
|
$2.000
|
$5.000
|
$3.000
|
$0.260
|
|
|
REMOVAL OF CONDUIT
|
LF
|
200.000
|
$5.500
|
$10.000
|
$5.000
|
$8.090
|
|
|
INSTALL OF CONDUIT BY TRENCHING
|
LF
|
300.000
|
$9.500
|
$10.000
|
$50.000
|
$9.000
|
|
|
INSTALL OF CONDUIT BY JACKING
|
LF
|
300.000
|
$9.500
|
$20.000
|
$1.000
|
$13.000
|
|
|
INSTALL OF CONDUIT BY BORING
|
LF
|
300.000
|
$9.500
|
$20.000
|
$100.000
|
$16.000
|
|
|
REMOVAL OF CABLES
|
LF
|
1,000.000
|
$1.000
|
$3.000
|
$1.000
|
$0.730
|
|
|
REPLACE OF CABLES
|
LF
|
10,000.000
|
$2.000
|
$0.500
|
$3.000
|
$2.250
|
|
|
REPLACE OF ELECTRICAL SERVICE
|
EA
|
10.000
|
$2,774.000
|
$1,000.000
|
$2,000.000
|
$7,696.000
|
|
|
INSTALL OF ELECTRICAL SERVICE
|
EA
|
50.000
|
$78.000
|
$100.000
|
$2,000.000
|
$7,085.000
|
|
|
REPLACE OF LUMINAIRE MAST ARMS
|
EA
|
10.000
|
$392.000
|
$1,000.000
|
$1,159.000
|
$1,568.000
|
|
|
REPLACE LUMINAIRE POLE
|
EA
|
30.000
|
$486.000
|
$1,500.000
|
$1,500.000
|
$3,136.000
|
|
|
REPLACE ABOVE-GROUND CONDUIT
|
LF
|
100.000
|
$15.000
|
$30.000
|
$5.000
|
$58.540
|
|
|
INSTALL UNDERGROUND CONDUIT
|
LF
|
1,000.000
|
$8.500
|
$10.000
|
$5.000
|
$9.360
|
|
|
REPLACE UNDERGROUND CONDUIT
|
LF
|
1,000.000
|
$11.000
|
$20.000
|
$5.000
|
$12.760
|
|
|
INSTALL CONDUCTOR
|
LF
|
15,000.000
|
$2.000
|
$1.750
|
$3.000
|
$1.260
|
|
|
REMOVE CONDUCTOR
|
LF
|
1,000.000
|
$1.000
|
$3.000
|
$3.000
|
$0.410
|
|
|
REPLACE CONDUCTOR
|
LF
|
10,000.000
|
$2.000
|
$2.500
|
$2.000
|
$1.510
|
|
|
ROAD BORE
|
LF
|
1,000.000
|
$22.000
|
$20.000
|
$15.000
|
$15.580
|
|
|
INSTALL ROADWAY ILLUM ASSEMBLY (LED)
|
EA
|
75.000
|
$973.000
|
$100.000
|
$500.000
|
$4,129.000
|
|
|
REMOVE UNDERPASS LUMINAIRE (HPS)
|
EA
|
16.000
|
$220.000
|
$10.000
|
$200.000
|
$220.000
|
|
|
INSTALL UNDERPASS LUMINAIRE (LED)
|
EA
|
44.000
|
$808.000
|
$100.000
|
$175.000
|
$863.000
|
|
|
REPLACE LUMINAIRE FIXTURE (LED)
|
EA
|
35.000
|
$458.000
|
$500.000
|
$500.000
|
$559.000
|
|
|
REPLACE STEEL SERVICE POLE
|
EA
|
3.000
|
$2,887.000
|
$3,000.000
|
$1,000.000
|
$3,889.000
|
|
|
INSTALL GROUND BOX W/APRON
|
EA
|
10.000
|
$963.000
|
$500.000
|
$500.000
|
$826.000
|
|
|
INSTALL FOUNDATION
|
EA
|
15.000
|
$2,132.000
|
$1,000.000
|
$500.000
|
$1,306.000
|
|
|
REMOVE FOUNDATION
|
EA
|
10.000
|
$500.000
|
$1,500.000
|
$500.000
|
$661.000
|
|
|
REPLACE TRANSFORMER BASE
|
EA
|
20.000
|
$585.000
|
$200.000
|
$200.000
|
$1,708.000
|
|
|
REPLACE TRANSFORMER BASE COVER
|
EA
|
10.000
|
$6.500
|
$250.000
|
$250.000
|
$208.000
|
|
|
REPLACE HAND HOLE COVER
|
EA
|
20.000
|
$6.500
|
$400.000
|
$250.000
|
$104.000
|
|
|
INSTALL GROUND ROD
|
EA
|
10.000
|
$12.000
|
$200.000
|
$50.000
|
$129.000
|
|
|
REPLACE BALLAST
|
EA
|
10.000
|
$104.000
|
$100.000
|
$175.000
|
$472.000
|
|
|
REPLACE FUSED DISCONNECT
|
EA
|
25.000
|
$273.000
|
$100.000
|
$200.000
|
$606.000
|
|
|
REPLACE LAMP (POLE MOUNT FIXTURE)
|
EA
|
100.000
|
$100.000
|
$50.000
|
$25.000
|
$531.000
|
|
|
REPLACE LAMP (UNDERPASS FIXTURE)
|
EA
|
25.000
|
$86.000
|
$70.000
|
$25.000
|
$899.000
|
|
|
REPLACE LAMP (WALL PACK FIXTURE)
|
EA
|
10.000
|
$145.000
|
$10.000
|
$25.000
|
$779.000
|
|
|
REPLACE WALL PACK LUMINAIRE
|
EA
|
10.000
|
$145.000
|
$10.000
|
$20.000
|
$827.000
|
|
|
REPLACE LENS (POLE MOUNTED FIXTURE)
|
EA
|
5.000
|
$110.000
|
$100.000
|
$50.000
|
$375.000
|
|
|
REPLACE LENS (UNDERPASS FIXTURE)
|
EA
|
5.000
|
$110.000
|
$100.000
|
$50.000
|
$369.000
|
|
|
REPLACE LENS (WALL PACK FIXTURE)
|
EA
|
5.000
|
$82.000
|
$10.000
|
$50.000
|
$353.000
|
|
|
REPLACE WALL PACK GUARD
|
EA
|
2.000
|
$82.000
|
$100.000
|
$50.000
|
$381.000
|
|
|
REPLACE FUSE
|
EA
|
100.000
|
$39.000
|
$75.000
|
$30.000
|
$96.000
|
|
|
REPLACE FUSE HOLDER
|
EA
|
5.000
|
$35.000
|
$500.000
|
$100.000
|
$151.000
|
|
|
REPLACE BREAKAWAY FUSE HOLDER
|
EA
|
150.000
|
$74.000
|
$75.000
|
$50.000
|
$151.000
|
|
|
REPLACE STARTING AID
|
EA
|
10.000
|
$82.000
|
$75.000
|
$200.000
|
$472.000
|
|
|
REPLACE PHOTOCELL AND BRACKET
|
EA
|
50.000
|
$60.000
|
$150.000
|
$250.000
|
$321.000
|
|
|
REPLACE CONTROL TRANS (ELECT SERVICE)
|
EA
|
1.000
|
$62.000
|
$3,500.000
|
$500.000
|
$209.000
|
|
|
REPLACE CONTROL CIRCUIT (ELECT SERVICE)
|
EA
|
1.000
|
$86.000
|
$3,500.000
|
$500.000
|
$401.000
|
|
|
REPLACE AVIATION WARNING FIXTURE
|
EA
|
5.000
|
$268.000
|
$100.000
|
$50.000
|
$492.000
|
|
|
REPLACE AVIATION WARNING LAMP
|
EA
|
5.000
|
$11.000
|
$100.000
|
$50.000
|
$492.000
|
|
|
REPLACE HAND-OFF-AUTO SWITCH
|
EA
|
20.000
|
$83.000
|
$100.000
|
$120.000
|
$205.000
|
|
|
REPLACE CONTACTOR
|
EA
|
25.000
|
$150.000
|
$300.000
|
$100.000
|
$135.000
|
|
|
REPLACE METER BASE
|
EA
|
25.000
|
$94.000
|
$100.000
|
$100.000
|
$613.000
|
|
|
REPLACE TIME CLOCK
|
EA
|
10.000
|
$137.000
|
$250.000
|
$120.000
|
$466.000
|
|
|
REPLACE BREAKER PANEL
|
EA
|
15.000
|
$751.000
|
$250.000
|
$350.000
|
$2,184.000
|
|
|
REPLACE CIRCUIT BREAKER
|
EA
|
50.000
|
$277.000
|
$100.000
|
$175.000
|
$362.000
|
|
|
REPLACE TWIST LOCK CONNECTOR
|
EA
|
10.000
|
$221.000
|
$100.000
|
$175.000
|
$148.000
|
|
|
REPLACE SAFETY LANYARD
|
LF
|
5.000
|
$2.000
|
$100.000
|
$50.000
|
$274.000
|
|
|
RE-STRAP EXISTING CONDUIT
|
EA
|
100.000
|
$40.000
|
$50.000
|
$50.000
|
$32.000
|
|
|
REPLACE NUTS, WASHERS & OTHER HARDWARE
|
EA
|
10.000
|
$275.000
|
$500.000
|
$10.000
|
$216.000
|
|
|
TROUBLESHOOT FOR REPAIRS
|
HR
|
300.000
|
$69.000
|
$325.000
|
$100.000
|
$134.000
|
|
|
REPLACE LUMINAIRES
|
EA
|
10.000
|
$104.000
|
$750.000
|
$200.000
|
$585.000
|
|
|
REPLACE LAMP FOR UNDERPASS FIXTRE 150W
|
EA
|
10.000
|
$110.000
|
$100.000
|
$20.000
|
$833.000
|
|
|
POTHOLE REPAIR (STANDARD)
|
CY
|
8.000
|
$92.000
|
$1,000.000
|
$200.000
|
$480.000
|
|
|
JT CLEANING AND SEALING(TRANS CNTR JTS)
|
LF
|
500.000
|
$15.000
|
$35.000
|
$15.000
|
$27.000
|
|
|
JT CLEANING AND SEALING (EXPANSION JTS)
|
LF
|
500.000
|
$15.000
|
$77.000
|
$15.000
|
$27.000
|
|
|
SPALLING REPAIR (HYDRAULIC CEMENT)
|
CF
|
60.000
|
$66.000
|
$410.000
|
$200.000
|
$82.000
|
|
|
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
|
GAL
|
5.000
|
$33.000
|
$500.000
|
$300.000
|
$301.000
|
|
|
FULL - WIDTH MOWING - TRACT (1)
|
AC
|
5,112.000
|
$44.000
|
$35.000
|
$47.000
|
$52.000
|
|
|
FULL - WIDTH MOWING - TRACT (2)
|
AC
|
3,660.000
|
$44.000
|
$35.000
|
$51.000
|
$52.000
|
|
|
FULL - WIDTH MOWING - TRACT (3)
|
AC
|
2,064.000
|
$39.000
|
$35.000
|
$50.000
|
$52.000
|
|
|
SPOT MOWING
|
AC
|
6.000
|
$50.000
|
$500.000
|
$500.000
|
$3,198.000
|
|
|
PAVEMENT EDGES, STRUCTURES & FIXTURES
|
MI
|
218.000
|
$357.000
|
$400.000
|
$275.000
|
$200.000
|
|
|
BROADCAST APPLICATION
|
AC
|
100.000
|
$84.000
|
$120.000
|
$100.000
|
$55.000
|
|
|
WICK APPLICATION OF HERBICIDE
|
AC
|
75.000
|
$29.000
|
$20.000
|
$100.000
|
$263.000
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
20.000
|
$18.000
|
$1,000.000
|
$500.000
|
$155.000
|
|
|
LITTER REMOVAL - TRACT (1)
|
CYC
|
48.000
|
$1,207.000
|
$6,000.000
|
$1,500.000
|
$2,178.000
|
|
|
LITTER REMOVAL - TRACT (2)
|
CYC
|
48.000
|
$852.000
|
$4,300.000
|
$1,500.000
|
$2,178.000
|
|
|
LITTER REMOVAL - TRACT (3)
|
CYC
|
48.000
|
$1,566.000
|
$3,000.000
|
$1,500.000
|
$2,178.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (1)
|
CYC
|
72.000
|
$1,149.000
|
$1,800.000
|
$25.000
|
$1,578.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (2)
|
CYC
|
72.000
|
$1,261.000
|
$1,800.000
|
$29.000
|
$789.000
|
|
|
DEBRIS-CNTR MEDIANS/MAINLANES-AREA (3)
|
CYC
|
72.000
|
$654.000
|
$1,800.000
|
$28.000
|
$789.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(1)
|
CYC
|
24.000
|
$3,516.000
|
$1,800.000
|
$30.000
|
$1,487.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(2)
|
CYC
|
24.000
|
$1,137.000
|
$1,900.000
|
$26.000
|
$1,559.000
|
|
|
CLEAN / SWEEP - CENTER MEDIAN - AREA(3)
|
CYC
|
24.000
|
$1,050.000
|
$1,400.000
|
$28.000
|
$958.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(1)
|
CYC
|
24.000
|
$3,449.000
|
$1,800.000
|
$31.000
|
$1,487.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(2)
|
CYC
|
24.000
|
$1,137.000
|
$1,900.000
|
$26.000
|
$1,559.000
|
|
|
CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(3)
|
CYC
|
24.000
|
$1,050.000
|
$1,400.000
|
$25.000
|
$958.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(1)
|
CYC
|
12.000
|
$1,815.000
|
$1,600.000
|
$27.000
|
$1,202.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(2)
|
CYC
|
12.000
|
$1,068.000
|
$1,600.000
|
$30.000
|
$1,260.000
|
|
|
CLEAN / SWEEP - FRONTAGE ROAD - AREA(3)
|
CYC
|
12.000
|
$1,006.000
|
$1,300.000
|
$33.000
|
$774.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 1)
|
CYC
|
12.000
|
$1,261.000
|
$1,600.000
|
$31.000
|
$1,202.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 2)
|
CYC
|
12.000
|
$1,168.000
|
$1,600.000
|
$32.000
|
$1,260.000
|
|
|
CLEAN / SWEEP - (ENTR /EXT RMP)(AREA 3)
|
CYC
|
12.000
|
$1,267.000
|
$1,300.000
|
$30.000
|
$774.000
|
|
|
CLEANING / SWEEPING (HANDWORK)
|
SY
|
35,000.000
|
$2.000
|
$1.000
|
$0.100
|
$0.790
|
|
|
GRAFFITI REMOVAL (WATER BLAST CLEAN)
|
SF
|
1,500.000
|
$3.000
|
$3.000
|
$2.000
|
$1.090
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
1,500.000
|
$3.000
|
$6.000
|
$5.000
|
$4.380
|
|
|
GRAFFITI REMOVAL (CHEMICAL CLEANING)
|
SF
|
300.000
|
$4.000
|
$10.000
|
$5.000
|
$8.730
|
|
|
ANTI-GRAFFITI COATING (PERMNENT-TY II)
|
SF
|
1,500.000
|
$2.000
|
$5.000
|
$1.000
|
$4.380
|
|
|
ANTI-GRAFFITI COATNG (PERMNENT-TY III)
|
SF
|
1,500.000
|
$5.000
|
$5.000
|
$1.000
|
$4.620
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
24.000
|
$1,917.000
|
$500.000
|
$100.000
|
$2,615.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
|
AC
|
20.000
|
$1,320.000
|
$500.000
|
$1,000.000
|
$2,140.000
|
|
|
STUMP REMOVAL
|
EA
|
6.000
|
$31.000
|
$500.000
|
$1,000.000
|
$428.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
15.000
|
$108.000
|
$350.000
|
$300.000
|
$209.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
15.000
|
$214.000
|
$350.000
|
$300.000
|
$503.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
15.000
|
$317.000
|
$250.000
|
$300.000
|
$503.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
15.000
|
$369.000
|
$250.000
|
$300.000
|
$797.000
|
|
|
TREE REMOVAL (30" - 36" DIA)
|
EA
|
6.000
|
$478.000
|
$500.000
|
$300.000
|
$993.000
|
|
|
TREE REMOVAL (36" - 42" DIA)
|
EA
|
6.000
|
$1,368.000
|
$500.000
|
$300.000
|
$1,319.000
|
|
|
TREE REMOVAL (42" - 48" DIA)
|
EA
|
6.000
|
$3,286.000
|
$500.000
|
$300.000
|
$1,319.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
1,000.000
|
$3.000
|
$15.000
|
$10.000
|
$1.280
|
|
|
DITCH CLEAN/RESHAPING(CU YD IN VEHICLE)
|
CY
|
1,000.000
|
$18.000
|
$30.000
|
$25.000
|
$23.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
50.000
|
$90.000
|
$100.000
|
$50.000
|
$52.000
|
|
|
STORM SEWER CLEANING (PIPE) (<12" DIA)
|
LF
|
100.000
|
$3.000
|
$4.000
|
$6.000
|
$3.100
|
|
|
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
|
LF
|
900.000
|
$6.000
|
$5.500
|
$9.000
|
$4.650
|
|
|
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
|
LF
|
1,400.000
|
$7.000
|
$6.000
|
$12.000
|
$4.910
|
|
|
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
|
LF
|
950.000
|
$8.000
|
$7.000
|
$14.000
|
$5.170
|
|
|
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
|
LF
|
900.000
|
$11.000
|
$7.500
|
$15.000
|
$5.430
|
|
|
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
|
LF
|
400.000
|
$15.000
|
$8.500
|
$19.000
|
$6.720
|
|
|
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
|
LF
|
200.000
|
$16.500
|
$10.000
|
$22.000
|
$8.270
|
|
|
STORM SEWER CLEAN (BOX CULV) (6-<12 SF)
|
LF
|
110.000
|
$15.000
|
$12.000
|
$7.000
|
$10.300
|
|
|
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
|
LF
|
100.000
|
$20.000
|
$15.000
|
$11.000
|
$13.400
|
|
|
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
|
LF
|
90.000
|
$27.000
|
$18.000
|
$16.000
|
$16.500
|
|
|
STORM SEWER CLEAN (BOX CULV)(48-<96 SF)
|
LF
|
50.000
|
$28.000
|
$20.000
|
$20.000
|
$18.000
|
|
|
REPLACE RAIL ELEMENT (W-BEAM)
|
LF
|
5,000.000
|
$25.000
|
$9.000
|
$20.000
|
$14.000
|
|
|
REPLACE RAIL ELEMENT (THRIE-BEAM)
|
LF
|
300.000
|
$26.000
|
$30.000
|
$15.000
|
$20.000
|
|
|
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
|
EA
|
30.000
|
$36.000
|
$200.000
|
$165.000
|
$12.000
|
|
|
REPLACE STEEL POST W/O CONC FND
|
EA
|
30.000
|
$73.000
|
$100.000
|
$200.000
|
$21.000
|
|
|
REPLACE STEEL POST W/ CONC FND
|
EA
|
450.000
|
$61.000
|
$65.000
|
$56.000
|
$31.000
|
|
|
REALIGN POSTS
|
EA
|
120.000
|
$24.000
|
$25.000
|
$100.000
|
$1.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
30.000
|
$1,268.000
|
$1,000.000
|
$1,000.000
|
$590.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
1,500.000
|
$34.000
|
$30.000
|
$22.000
|
$7.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
300.000
|
$67.000
|
$65.000
|
$56.000
|
$20.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
6.000
|
$297.000
|
$1,000.000
|
$315.000
|
$124.000
|
|
|
RESET SGT IMPACT HEAD
|
EA
|
30.000
|
$124.000
|
$100.000
|
$25.000
|
$12.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
20.000
|
$33.000
|
$150.000
|
$20.000
|
$20.000
|
|
|
REPLACE SGT CABLE ANCHOR
|
EA
|
24.000
|
$105.000
|
$100.000
|
$70.000
|
$7.000
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
18.000
|
$130.000
|
$100.000
|
$78.000
|
$60.000
|
|
|
REPLACE SGT STRUT
|
EA
|
12.000
|
$93.000
|
$250.000
|
$80.000
|
$41.000
|
|
|
REPLACE POSTS (TL-3)(GIBRALTAR)
|
EA
|
350.000
|
$81.000
|
$115.000
|
$150.000
|
$155.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-3)
|
EA
|
16.000
|
$422.000
|
$300.000
|
$302.000
|
$610.000
|
|
|
REPAIR CONCRETE FOUNDATION (TL-3)
|
EA
|
18.000
|
$173.000
|
$250.000
|
$100.000
|
$41.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
|
EA
|
13.000
|
$1,806.000
|
$1,500.000
|
$1,700.000
|
$3,101.000
|
|
|
REPLACE CABLE (TL-3)
|
LF
|
9,500.000
|
$4.200
|
$0.500
|
$3.000
|
$2.100
|
|
|
CHECK / RE-TENSION CABLE (TL-3)
|
EA
|
25.000
|
$249.000
|
$750.000
|
$500.000
|
$36.000
|
|
|
POST AND CABLE FENCE (NEW INSTALLATION)
|
LF
|
300.000
|
$12.000
|
$25.000
|
$15.000
|
$2.100
|
|
|
REPLACE (SMTC) NARROW
|
EA
|
1.000
|
$1,000.000
|
$26,000.000
|
$10,000.000
|
$30,749.000
|
|
|
REPAIR (SMTC) NARROW
|
LF
|
21.000
|
$300.000
|
$400.000
|
$200.000
|
$73.000
|
|
|
REPLACE (SMTC) WIDE
|
EA
|
1.000
|
$600.000
|
$30,000.000
|
$10,000.000
|
$36,950.000
|
|
|
REPAIR (SMTC) WIDE
|
LF
|
50.000
|
$200.000
|
$300.000
|
$200.000
|
$73.000
|
|
|
REPLACE (QUAD - ELITE) NARROW
|
EA
|
1.000
|
$2,000.000
|
$26,000.000
|
$10,000.000
|
$12,920.000
|
|
|
REPAIR (QUAD - ELITE) NARROW
|
LF
|
27.000
|
$300.000
|
$400.000
|
$200.000
|
$63.000
|
|
|
REPLACE (QUAD - ELITE) WIDE
|
EA
|
1.000
|
$1,000.000
|
$36,000.000
|
$10,000.000
|
$20,814.000
|
|
|
REPAIR (QUAD - ELITE) WIDE
|
LF
|
27.000
|
$500.000
|
$400.000
|
$200.000
|
$63.000
|
|
|
REPAIR (NARROW QUAD NOSE)
|
EA
|
1.000
|
$200.000
|
$10,000.000
|
$2,000.000
|
$150.000
|
|
|
REPAIR (STEEL RAIL)
|
LF
|
150.000
|
$16.500
|
$50.000
|
$200.000
|
$8.300
|
|
|
CNC CRACK REPAIR (FLOOD)(GRAVITY)
|
SF
|
8,000.000
|
$16.000
|
$5.000
|
$15.000
|
$10.000
|
|
|
SNOW AND ICE CONTROL (TRUCK)
|
HR
|
72.000
|
$47.000
|
$150.000
|
$50.000
|
$118.000
|
|
|
SNOW AND ICE CONTROL (SHADOW VEHICLE)
|
HR
|
216.000
|
$41.000
|
$120.000
|
$50.000
|
$10.000
|
|
|
SNOW AND ICE CONTROL (LOADER)
|
HR
|
72.000
|
$73.000
|
$50.000
|
$50.000
|
$124.000
|
|
|
SNOW AND ICE CONTROL (SEASON)
|
MO
|
6.000
|
$24,877.000
|
$12,500.000
|
$50,000.000
|
$83,333.000
|
|
|
SNOW AND ICE CONTROL (SPRAY RIG)
|
HR
|
144.000
|
$63.000
|
$100.000
|
$250.000
|
$216.000
|
|
|
INCIDENT MANAGEMENT (TYPE A)
|
HR
|
8.000
|
$53.000
|
$250.000
|
$300.000
|
$217.000
|
|
|
INCIDENT MANAGEMENT (TYPE B)
|
HR
|
8.000
|
$58.000
|
$250.000
|
$300.000
|
$264.000
|
|
|
INCIDENT MANAGEMENT (TYPE E)
|
HR
|
8.000
|
$81.000
|
$250.000
|
$300.000
|
$264.000
|
|
|
INCIDENT MANAGEMENT (TYPE F)
|
HR
|
8.000
|
$89.000
|
$250.000
|
$300.000
|
$217.000
|
|
|
INCIDENT MANAGEMENT (TYPE G)
|
HR
|
8.000
|
$44.000
|
$250.000
|
$300.000
|
$217.000
|
|
|
INCIDENT MANAGEMENT (TYPE H)
|
HR
|
8.000
|
$47.000
|
$250.000
|
$300.000
|
$264.000
|
|
|
INCIDENT MANAGEMENT (TYPE I)
|
HR
|
8.000
|
$67.000
|
$250.000
|
$300.000
|
$217.000
|
|
|
INCIDENT MANAGMENT (TYPE J)
|
HR
|
8.000
|
$36.000
|
$300.000
|
$300.000
|
$21.000
|
|
|
VACUUM CLEANING OF BRIDGE JOINTS
|
CYC
|
2.000
|
$14,437.000
|
$10,000.000
|
$10,000.000
|
$2,736.000
|
|
Totals: |
$6,109,209.000
|
$4,579,980.000
|
$5,799,929.000
|
$7,444,010.500
|