Show Job Controls
Bid Cobra

LIBERTY BS105T (6414-53-001)

Items: 61

County: LIBERTY
Length: N/A
Highway: BS105T
District: BEAUMONT
Control Number: 6414-53-001
DBE Goal: N/A
Project: RMC - 641453001
Guaranty: N/A
Time: 44 W
Engineer's Estimate: $3,253,031.51
Date: 06/28/2023 (2 years ago)
Contract Number: N/A
Type: MILL AND INLAY
Mail/Deliver Bids To: N/A
ROBERTO RODRIGUEZ
NYEMB NYEMB
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$3,253,031.51
Over/Under Est: -2.36% -$76,677.91
Over/Under Est: 13.22% $430,160.28
Amt Left: 15.96% $506,838.19
$3,830,000.00
Over/Under Est: 17.74% $576,968.49
Amt Left: 20.58% $653,646.40
Delta: -3.99% -$146,808.21
Over/Under Est: 19.32% $628,622.04
Amt Left: 22.2% $705,299.95
Delta: -1.35% -$51,653.55

Bid Items & Bid Tabulations

61 Total 0 of 61
LIBERTY  |  BS105T  |  BEAUMONT  |  6414-53-001  |  06/28/2023  |  $3,253,031.51  |  RMC - 641453001  |  MILL AND INLAY  |  44 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC
FORDE CONSTRUCTION COMPANY, INC.
ICON GC, LLC
TEXAS MATERIALS GROUP, INC.
EXCAVATION (CHANNEL)
CY 210.000 $27.000 $85.000 $75.000 $75.000 $74.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 190.000 $61.000 $57.200 $115.000 $60.000 $90.000
BACKFILL (TY A OR B)
STA 148.000 $264.000 $273.000 $585.000 $360.000 $766.000
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 40.000 $184.000 $301.000 $100.000 $458.000 $309.000
BROADCAST SEED (TEMP) (WARM)
SY 24,764.000 $1.500 $0.400 $0.840 $0.420 $0.150
VEGETATIVE WATERING
MG 35.000 $6.000 $263.000 $175.000 $180.000 $83.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 450.000 $75.000 $109.000 $206.000 $95.000 $129.000
PLANE ASPH CONC PAV(0" TO 2")
SY 16,712.000 $3.000 $3.500 $9.500 $3.000 $5.000
PLANE ASPH CONC PAV (1")
SY 13,154.000 $2.000 $3.100 $6.000 $3.000 $3.750
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 110.000 $219.000 $313.000 $256.000 $172.000 $290.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 200.000 $240.000 $210.000 $348.000 $172.000 $245.000
RIPRAP (STONE COMMON)(DRY)(24 IN)
CY 475.000 $250.000 $276.000 $348.000 $219.000 $236.000
RIPRAP (MOW STRIP)(4 IN)
CY 43.000 $43.000 $796.000 $1,100.000 $540.000 $890.000
RIPRAP (STONE TY R)(GROUT)(24 IN)
CY 240.000 $250.000 $355.000 $345.000 $283.000 $342.000
GABIONS (3' X 3')(GALV)
CY 127.000 $400.000 $398.000 $366.000 $475.000 $327.000
GABIONS (5'X 3')(GALV)
CY 324.000 $450.000 $364.000 $362.000 $368.000 $485.000
CLEAN EXIST CULVERTS
EA 3.000 $1,500.000 $4,598.000 $5,000.000 $3,000.000 $1,110.000
MOBILIZATION
LS 1.000 $200,000.000 $114,000.000 $93,000.000 $125,059.450 $206,600.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $3,500.000 $1,178.000 $24,000.000 $18,000.000 $1,425.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 10.000 $44.000 $42.300 $90.000 $131.000 $47.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 80.000 $53.000 $48.300 $90.000 $131.000 $47.000
ROCK FILTER DAMS (REMOVE)
LF 90.000 $18.000 $18.100 $27.000 $53.500 $13.000
SANDBAGS FOR EROSION CONTROL (12")
LF 480.000 $11.000 $19.200 $11.000 $18.500 $13.000
DRIVEWAYS (ACP)
SY 2,149.000 $45.000 $27.700 $63.000 $31.000 $36.000
RUMBLE STRIPS (CENTERLINE)
LF 10,849.000 $0.800 $0.300 $0.700 $1.500 $0.300
MTL W-BEAM GD FEN (TIM POST)
LF 725.000 $32.000 $30.200 $32.000 $29.700 $31.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $766.000 $1,994.000 $1,400.000 $1,723.000 $1,550.000
TL-3 31" SHORT RADIUS (END ANCHOR)
EA 2.000 $14,500.000 $18,127.000 $13,000.000 $23,765.000 $20,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,313.000 $3,686.000 $3,700.000 $4,159.000 $3,200.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 44.000 $1,027.000 $556.000 $703.000 $1,010.000 $715.000
IN SM RD SN SUP&AM TYS80(1)SB(P)
EA 4.000 $889.000 $906.000 $874.000 $1,010.000 $1,050.000
IN SM RD SN SUP&AM TYS80(1)SB(U)
EA 7.000 $1,202.000 $1,142.000 $1,200.000 $1,010.000 $1,200.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 20.000 $42.000 $42.300 $25.000 $1,010.000 $42.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 5,510.000 $0.480 $0.500 $0.600 $0.600 $0.550
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 4.000 $101.000 $60.400 $133.000 $148.500 $100.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 4,863.000 $0.480 $0.500 $0.600 $0.750 $0.550
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 22,220.000 $0.400 $0.500 $0.600 $0.650 $0.550
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
LF 48.000 $5.520 $2.400 $6.250 $4.650 $4.500
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,810.000 $0.700 $1.200 $2.100 $1.500 $2.500
PAVEMENT SEALER 6"
LF 12,008.000 $0.360 $0.400 $0.110 $0.500 $0.350
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
LF 43,034.000 $0.990 $0.950 $1.000 $1.250 $1.350
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 1,359.000 $0.790 $0.950 $0.950 $0.900 $0.850
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 40,043.000 $0.760 $0.850 $0.950 $0.790 $0.850
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 104.000 $12.000 $21.800 $21.300 $20.800 $15.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 7.000 $180.000 $302.000 $345.000 $386.000 $255.000
PREFAB PAV MRK TY C (W) (WORD)
EA 10.000 $325.000 $302.000 $425.000 $469.400 $360.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 10.000 $22.000 $30.200 $42.000 $77.250 $89.000
PREFAB PAV MRK TY C (Y) (12") (SLD)
LF 115.000 $11.000 $10.900 $11.000 $9.500 $8.000
PREFAB PAV MRK TY C (Y) (24") (SLD)
LF 104.000 $11.000 $21.800 $22.000 $18.400 $16.000
REFL PAV MRKR TY I-C
EA 122.000 $3.200 $7.700 $6.350 $7.700 $5.000
REFL PAV MRKR TY II-A-A
EA 771.000 $3.200 $7.700 $6.350 $7.700 $5.500
ELIM EXT PAV MRK & MRKS (4")
LF 12,008.000 $1.330 $0.500 $0.550 $0.750 $0.400
DITCH CLEANING AND RESHAPING (FOOT)
LF 10,796.000 $2.000 $8.600 $7.000 $30.000 $16.000
FILTER FABRIC (TY 2)
SY 850.000 $8.500 $16.100 $2.000 $1.800 $1.650
D-GR HMA TY-D PG64-22
TON 738.000 $110.000 $156.000 $219.000 $132.000 $169.000
TACK COAT
GAL 546.000 $15.940 $8.900 $6.000 $4.750 $4.000
SP MIXES SP-C SAC-A PG76-22
TON 13,584.000 $130.000 $123.500 $126.000 $150.000 $149.000
TACK COAT
GAL 8,415.000 $4.000 $4.000 $6.000 $4.750 $4.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 200.000 $300.000 $98.900 $150.000 $107.000 $207.000
TMA (STATIONARY)
DAY 100.000 $350.000 $311.000 $250.000 $186.000 $385.000
TMA (MOBILE OPERATION)
DAY 11.000 $376.000 $30.200 $300.000 $654.000 $720.000
Totals: $3,253,031.510 $3,176,353.600 $3,683,191.790 $3,830,000.000 $3,881,653.550