LIBERTY FM0787 (6344-05-001)

Items: 38

County: LIBERTY
Length: N/A
Highway: FM0787
District: BEAUMONT
Control Number: 6344-05-001
DBE Goal: N/A
Project: RMC - 634405001
Guaranty: N/A
Time: 138 W
Engineer's Estimate: $14,810,762.24
Date: 02/07/2020 (6 years ago)
Contract Number: N/A
Type: STABILIZE BANK OF TRINITY RIVER
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$14,810,762.24
$15,552,095.94
Over/Under Est: 5.01% $741,333.70
Over/Under Est: 7.12% $1,054,444.74
Amt Left: 2.01% $313,111.04
$16,288,625.84
Over/Under Est: 9.98% $1,477,863.60
Amt Left: 4.74% $736,529.90
Delta: -2.67% -$423,418.86
Over/Under Est: 21.32% $3,157,313.11
Amt Left: 15.53% $2,415,979.41
Delta: -10.31% -$1,679,449.51
Over/Under Est: 22.34% $3,308,555.16
Amt Left: 16.51% $2,567,221.46
Delta: -0.84% -$151,242.05
$21,402,990.10
Over/Under Est: 44.51% $6,592,227.86
Amt Left: 37.62% $5,850,894.16
Delta: -18.12% -$3,283,672.70

Bid Items & Bid Tabulations

38 Total 0 of 38
LIBERTY  |  FM0787  |  BEAUMONT  |  6344-05-001  |  02/07/2020  |  $14,810,762.24  |  RMC - 634405001  |  STABILIZE BANK OF TRINITY RIVER  |  138 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
TRIPLE B SERVICES LLP
TEXAS GULF CONSTRUCTION COMPANY, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
FNH CONSTRUCTION, LLC
REMOVING STAB BASE & ASPH PAV (8"-12")
SY 23.000 $5.000 $300.000 $11.000 $80.000 $41.250 $150.000 $100.000
EXCAVATION (SPECIAL)
CY 735.000 $10.000 $54.000 $35.000 $50.000 $22.000 $50.000 $100.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 735.000 $15.000 $73.000 $100.000 $60.000 $35.650 $50.000 $200.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 3,411.000 $0.250 $0.520 $0.300 $0.620 $0.750 $0.650 $1.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 3,411.000 $0.500 $0.520 $0.300 $0.620 $0.750 $0.650 $1.000
FL BS (CMP IN PLC)(TY A OR B GR 4)(8")
SY 41.000 $10.000 $81.000 $36.000 $85.000 $77.000 $130.000 $80.000
SHEET PILING (PZ - 40)
SF 182,437.000 $65.000 $54.000 $63.000 $60.000 $67.500 $64.000 $68.800
STL H - PILING (HP 12 X 84)
LF 280.000 $85.000 $230.000 $250.000 $165.000 $240.750 $200.000 $500.000
STL H PILING (HP 10 X 42)
LF 300.000 $85.000 $203.000 $250.000 $200.000 $294.500 $200.000 $300.000
SOIL NAIL ANCHORS
LF 16,268.000 $20.000 $71.000 $50.000 $75.000 $119.500 $120.000 $60.000
CL C CONC (COPING)
CY 337.300 $1,000.000 $2,000.000 $1,250.000 $1,210.000 $2,101.000 $1,500.000 $2,000.000
RIPRAP (STONE COMMON)(DRY)(36 IN)
CY 1,510.000 $200.000 $255.000 $150.000 $330.000 $185.000 $350.000 $500.000
STR STEEL (ROLLED BEAM)
LB 295,700.000 $2.000 $2.800 $2.500 $4.300 $2.370 $3.000 $10.000
REMOV STR (SMALL)
EA 1.000 $800.000 $26,900.000 $50,000.000 $30,000.000 $30,500.000 $10,000.000 $25,000.000
MOBILIZATION
LS 1.000 $1,014,670.990 $1,169,700.000 $1,446,293.380 $1,227,000.000 $1,224,075.000 $1,700,000.000 $2,300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $6,000.000 $2,500.000 $10,000.000 $1,000.000 $805.000 $7,000.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 100.000 $25.000 $34.750 $30.000 $50.000 $49.000 $50.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 100.000 $8.000 $8.100 $30.000 $17.000 $20.000 $10.000 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 448.000 $20.000 $32.750 $25.000 $40.000 $37.000 $45.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 448.000 $8.000 $8.100 $10.000 $12.000 $11.600 $10.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,220.000 $5.000 $2.900 $3.000 $3.000 $2.650 $5.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,220.000 $1.000 $1.050 $1.000 $1.000 $1.000 $1.500 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 4,374.000 $6.000 $4.750 $6.000 $7.000 $5.750 $6.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,374.000 $2.000 $1.100 $1.000 $0.800 $0.800 $3.650 $9.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 1.000 $2,000.000 $4,950.000 $7,500.000 $22,000.000 $5,135.000 $17,000.000 $6,500.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 1,968.000 $60.000 $96.000 $110.000 $90.000 $105.000 $100.000 $100.000
MTL W-BEAM GD FEN (TIM POST)
LF 62.500 $20.000 $31.000 $22.000 $50.000 $49.000 $50.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $2,000.000 $1,600.000 $1,800.000 $3,100.000 $3,005.000 $3,000.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 183.000 $4.000 $4.100 $3.000 $6.000 $5.850 $7.000 $4.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $300.000 $260.000 $225.000 $430.000 $410.000 $700.000 $1,000.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 1.000 $450.000 $260.000 $250.000 $600.000 $585.000 $1,050.000 $1,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $2,500.000 $2,550.000 $2,700.000 $4,000.000 $3,970.000 $3,000.000 $3,200.000
REMOVE AND INSTALL EXISTING GATE
EA 1.000 $2,000.000 $6,100.000 $1,200.000 $18,000.000 $2,235.000 $3,700.000 $10,000.000
WIRE FENCE (TY A)
LF 50.000 $10.000 $152.000 $13.000 $22.000 $30.000 $75.000 $30.000
TEMPORARY CONSTRUCTION MATTING
SY 1,000.000 $8.000 $600.000 $3.000 $60.000 $95.000 $25.000 $100.000
FLOATING TURBIDITY BARRIER(FUR & INST)
LF 2,084.000 $20.000 $100.000 $20.000 $35.000 $33.500 $85.000 $50.000
FLOATING TURBIDITY BARRIER (REMOVE)
LF 2,084.000 $5.000 $52.000 $5.000 $3.000 $5.750 $25.000 $10.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $12,600.000 $8,800.000 $21,000.000 $42,065.000 $20,000.000 $20,000.000
Totals: $14,810,762.240 $15,552,095.940 $15,865,206.980 $16,288,625.840 $17,968,075.350 $18,119,317.400 $21,402,990.100