LIBERTY FM 2830 (2887-01-013)

Items: 38

County: LIBERTY
Length: 0.5000 MILES
Highway: FM 2830
District: BEAUMONT
Control Number: 2887-01-013
DBE Goal: 2.0%
Project: STP 2025(729)HRR
Guaranty: $11,000.00
Time: 24 WORKING DAYS
Engineer's Estimate: $573,353.55
Date: 05/01/2025 (1 year ago)
Contract Number: 5253034
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00184102
Contract Type: Federal
Project Description: BMT_FM2830_1(2021 HSIP) INCREASE SUPERELEVATION
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
ROBERTO RODRIGUEZ
ROBERTO M RODRIGUEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$573,353.55
Over/Under Est: -15.43% -$88,445.12
Over/Under Est: -7.58% -$43,448.85
Amt Left: 9.28% $44,996.27
Over/Under Est: -4.86% -$27,844.74
Amt Left: 12.5% $60,600.38
Delta: -2.94% -$15,604.11
Over/Under Est: 8.73% $50,073.85
Amt Left: 28.57% $138,518.97
Delta: -14.28% -$77,918.59
Subcontractor Percentage Amount
A1 EROSION CONTROL 0.00% $0.00
AWP SAFETY 0.00% $0.00
J & M CONTRACTING, COMPANY 0.00% $0.00
LONESTAR TRAFFIC SAFETY, LLC 0.00% $0.00
PROFESSIONAL TRAFFIC CONTROL LLC 0.00% $0.00
TRP CONSTRUCTION GROUP, LLC 0.00% $0.00
Total: 0.00% $0.00

Bid Items & Bid Tabulations

38 Total 0 of 38
LIBERTY  |  FM 2830  |  BEAUMONT  |  2887-01-013  |  05/01/2025  |  $573,353.55  |  STP 2025(729)HRR  |  HAZARD ELIM & SAFETY  |  24 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
TEXAS MATERIALS GROUP, INC.
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC
FORDE CONSTRUCTION COMPANY, INC.
SUBGR WIDEN (OC)
STA 26.420 $500.000 $1,230.000 $850.000 $752.870 $1,600.000
BACKFILL (TY A OR B)
STA 26.420 $255.000 $473.000 $440.000 $759.970 $450.000
HYDRO MULCH SEED (PERM_RURAL_SANDY)
SY 2,936.000 $0.750 $0.750 $1.100 $1.000 $0.750
HYDRO MULCH SEED (TEMP_WARM)
SY 2,936.000 $0.500 $0.650 $1.100 $1.000 $0.650
VEGETATIVE WATERING
TGL 25.000 $65.000 $150.000 $51.000 $302.260 $95.000
FL BS (CMP IN PLC)(TY A GR 1-2) (8")
SY 2,348.000 $65.000 $37.690 $37.000 $32.730 $30.000
PRIME COAT (AE-P)
GAL 470.000 $6.180 $5.500 $8.000 $5.610 $4.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 2,959.000 $4.530 $4.550 $4.200 $4.190 $4.000
AGGR (TY-PB OR PL, GR-4)(SAC-B)
CY 64.000 $250.000 $298.000 $320.000 $315.600 $645.000
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 1,051.000 $130.000 $144.000 $162.000 $150.000 $225.000
TACK COAT
GAL 635.000 $7.200 $3.250 $4.000 $5.440 $4.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 71.000 $185.000 $170.000 $129.000 $209.820 $375.000
PLANE ASPH CONC PAV(0" TO 2")
SY 622.000 $7.490 $2.000 $8.000 $23.070 $14.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 12.000 $3,223.000 $3,000.000 $4,000.000 $2,500.000 $2,100.000
MOBILIZATION
LS 1.000 $50,000.000 $48,000.000 $51,000.000 $54,000.000 $62,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $5,000.000 $1,500.000 $1,300.000 $20,484.260 $3,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $4,707.000 $1,500.000 $3,300.000 $3,000.000 $3,000.000
TMA (STATIONARY)
DAY 25.000 $150.000 $50.000 $328.000 $270.560 $170.000
TMA (MOBILE OPERATION)
DAY 5.000 $218.000 $150.000 $715.000 $540.680 $200.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 160.000 $7.800 $5.000 $9.000 $8.000 $11.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 160.000 $5.000 $3.000 $3.250 $3.000 $5.000
INTERSECTIONS (ACP)
SY 128.000 $135.000 $75.000 $28.000 $50.870 $83.000
DRIVEWAYS (BASE)
SY 74.000 $280.000 $65.000 $28.000 $87.670 $76.000
TURNOUTS (ACP)
SY 45.000 $81.000 $75.000 $58.000 $136.610 $205.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 5,284.000 $3.100 $1.000 $1.000 $0.290 $0.600
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 2,642.000 $6.000 $0.500 $1.000 $0.430 $0.900
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 2.000 $294.000 $385.000 $353.000 $450.000 $342.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $660.000 $725.000 $423.000 $550.000 $410.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $715.000 $740.000 $750.000 $715.000 $728.000
REMOVE SM RD SN SUP&AM
EA 3.000 $113.000 $150.000 $150.000 $165.000 $155.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 1,470.000 $0.750 $0.550 $2.100 $0.600 $0.650
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 3,815.000 $0.750 $1.250 $2.100 $0.600 $0.250
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 623.000 $1.500 $1.000 $1.500 $0.880 $0.500
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 5,284.000 $0.550 $1.300 $2.100 $1.550 $1.650
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 1,470.000 $0.550 $0.550 $2.100 $1.550 $1.650
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 3,815.000 $0.550 $1.300 $2.100 $1.550 $1.650
PREFAB PM TY C (W)(24")(SLD)
LF 20.000 $15.000 $25.000 $27.000 $50.000 $53.000
REFL PAV MRKR TY II-A-A
EA 68.000 $8.650 $8.000 $13.000 $6.980 $7.400
Totals: $573,353.550 $484,908.430 $529,904.700 $545,508.803 $623,427.400
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $3,000.00
Total: $13,000.00