LIBERTY FM 1008 (0952-01-062)

Items: 50

County: LIBERTY
Length: N/A
Highway: FM 1008
District: BEAUMONT
Control Number: 0952-01-062
DBE Goal: 400.0%
Project: F 2024(810)
Guaranty: N/A
Time: 62 WORKING DAYS
Engineer's Estimate: $3,092,053.52
Date: 03/06/2024 (2 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
ROBERTO M RODRIGUEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$3,092,053.52
$2,261,889.84
Over/Under Est: -26.85% -$830,163.68
Over/Under Est: -22.53% -$696,627.24
Amt Left: 5.9% $133,536.44
Over/Under Est: -20.64% -$638,103.57
Amt Left: 8.49% $192,060.11
Delta: -2.44% -$58,523.67
$2,943,676.21
Over/Under Est: -4.8% -$148,377.31
Amt Left: 30.14% $681,786.37
Delta: -19.96% -$489,726.26
Subcontractor Percentage Amount
SEMPER STRIPING LLC 3.38% $86,544.71
A.J.J.A . TRUCKING, INC. 3.00% $76,814.83
H J HENKE, LLC 2.32% $59,403.47
KINGZ INDUSTRIAL LLC 2.22% $56,842.98
WILLOW CITY SIGN & RAIL, INC. 1.01% $25,860.99
PROFESSIONAL TRAFFIC CONTROL LLC 0.27% $6,913.34
Total: 12.20% $312,380.32

Bid Items & Bid Tabulations

50 Total 0 of 50
LIBERTY  |  FM 1008  |  BEAUMONT  |  0952-01-062  |  03/06/2024  |  $3,092,053.52  |  F 2024(810)  |  SURF/ROADWAY RESTOR  |  62 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC
HAYDEN PAVING, INC.
PREPARING ROW
STA 100.000 $4,409.000 $643.000 $600.000 $614.000 $650.000
BACKFILL (TY A OR B)
STA 130.000 $300.000 $214.000 $230.000 $147.000 $50.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 4,387.000 $0.600 $1.080 $1.000 $1.050 $1.000
VEGETATIVE WATERING
MG 72.500 $110.000 $17.000 $25.000 $228.000 $165.000
ASPH (AC-20-5TR)
GAL 16,425.000 $6.080 $3.900 $4.500 $3.700 $5.000
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
CY 351.000 $135.000 $244.000 $175.000 $151.000 $275.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 5,491.000 $96.320 $87.750 $83.000 $93.200 $123.000
PLAN & TEXT ASPH CONC PAV(0" TO 3")
SY 2,535.000 $9.000 $5.150 $5.000 $5.650 $4.500
PLANE ASPH CONC PAV (1")
SY 5,850.000 $6.000 $4.350 $2.100 $2.800 $4.500
PLANE ASPH CONC PAV(1" TO 2")
SY 7,355.000 $3.510 $3.650 $3.000 $2.950 $4.500
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 320.000 $200.000 $100.000 $175.000 $122.000 $150.000
MANH (COMPL)(RISER ONLY)
EA 8.000 $2,395.000 $270.000 $4,000.000 $1,590.000 $3,200.000
MOBILIZATION
LS 1.000 $311,000.000 $175,000.000 $200,000.000 $80,457.000 $240,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $3,883.000 $1,380.000 $4,000.000 $26,721.000 $4,500.000
TEMP SDMT CONT FENCE (INLET PROTECTION)
LF 70.000 $9.580 $13.000 $15.000 $16.900 $1.500
DRIVEWAYS (CONC)
SY 214.000 $95.090 $114.000 $175.000 $205.000 $120.000
DRIVEWAYS (ACP)
SY 66.000 $52.710 $95.000 $180.000 $251.000 $65.000
TURNOUTS (ACP)
SY 39.000 $80.510 $40.000 $100.000 $171.000 $65.000
DRIVEWAYS (BASE)
SY 198.000 $75.000 $66.000 $85.000 $30.700 $50.000
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 12,500.000 $1.600 $0.230 $0.600 $0.200 $0.550
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 34.000 $625.000 $558.000 $640.000 $531.000 $665.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $625.000 $677.000 $745.000 $645.000 $756.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $625.000 $850.000 $880.000 $810.000 $888.000
REMOVE SM RD SN SUP&AM
EA 38.000 $83.700 $108.000 $135.000 $103.000 $101.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
EA 42.000 $23.550 $42.000 $20.000 $39.700 $21.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 2,956.000 $0.600 $0.320 $0.420 $0.250 $0.460
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 27,672.000 $0.600 $0.290 $0.420 $0.250 $0.460
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 211.000 $0.900 $1.620 $0.900 $0.300 $0.760
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 144.000 $5.400 $2.160 $6.000 $3.900 $5.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 29,541.000 $0.410 $0.290 $0.420 $0.250 $0.460
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
LF 110.000 $4.750 $2.160 $6.000 $3.900 $5.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 21.000 $0.770 $0.810 $1.000 $4.650 $3.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,477.000 $0.750 $0.810 $1.000 $1.600 $3.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 211.000 $2.110 $2.220 $1.000 $1.300 $2.000
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 3,000.000 $1.200 $0.820 $0.550 $0.850 $0.690
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 27,672.000 $2.030 $0.800 $0.550 $0.700 $0.690
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 29,541.000 $0.800 $0.800 $0.550 $0.700 $0.690
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 144.000 $15.000 $11.900 $12.000 $12.900 $20.110
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $278.000 $286.760 $250.000 $191.000 $309.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 4.000 $300.000 $330.050 $335.000 $286.000 $449.000
PREFAB PAV MRK TY C (W) (WORD)
EA 8.000 $347.380 $357.100 $285.000 $233.000 $412.000
PREFAB PAV MRK TY C (Y) (24") (SLD)
LF 110.000 $15.000 $12.120 $15.000 $12.900 $21.000
REFL PAV MRKR TY I-C
EA 15.000 $16.000 $4.980 $5.750 $6.450 $7.000
REFL PAV MRKR TY II-A-A
EA 1,463.000 $6.500 $4.980 $5.750 $6.450 $6.100
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 322.000 $220.000 $155.500 $300.000 $203.000 $200.000
SP MIXES SP-C SAC-A PG76-22
TON 7,325.000 $145.000 $135.500 $140.000 $151.000 $180.000
TACK COAT
GAL 2,737.000 $8.000 $3.000 $3.750 $7.400 $4.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $12,400.000 $10,000.000 $2,579.000 $2,500.000
TMA (STATIONARY)
DAY 54.000 $374.000 $260.000 $175.000 $551.000 $250.000
TMA (MOBILE OPERATION)
DAY 20.000 $351.380 $7.500 $175.000 $25.800 $250.000
Totals: $3,092,053.520 $2,261,889.840 $2,395,426.280 $2,453,949.950 $2,943,676.210