Show Job Controls
Bid Cobra

LIBERTY FM 160 (0787-02-022)

Items: 56

County: LIBERTY
Length: N/A
Highway: FM 160
District: BEAUMONT
Control Number: 0787-02-022
DBE Goal: 400.0%
Project: STP 2024(853)HES
Guaranty: N/A
Time: 150 WORKING DAYS
Engineer's Estimate: $5,039,688.36
Date: 04/05/2024 (2 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
ROBERTO M RODRIGUEZ
NYEMB NYEMB
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$5,039,688.36
$3,983,905.56
Over/Under Est: -20.95% -$1,055,782.80
Over/Under Est: -15.72% -$792,123.29
Amt Left: 6.62% $263,659.51
Over/Under Est: -12.34% -$622,061.20
Amt Left: 10.89% $433,721.60
Delta: -4.00% -$170,062.09
$5,270,000.00
Over/Under Est: 4.57% $230,311.64
Amt Left: 32.28% $1,286,094.44
Delta: -19.29% -$852,372.84
Subcontractor Percentage Amount
H J HENKE, LLC 4.29% $170,710.51
STRIPE LINES, INC. 2.10% $83,564.59
TRAFFIC SIGNS & LINES, LLC 1.97% $78,391.54
GREEN SAGE SERVICES LLC 1.19% $47,353.26
AMERICAN REMEDIATION OPTIONS, INC. 0.87% $34,619.61
Total: 10.42% $414,639.51

Bid Items & Bid Tabulations

56 Total 0 of 56
LIBERTY  |  FM 160  |  BEAUMONT  |  0787-02-022  |  04/05/2024  |  $5,039,688.36  |  STP 2024(853)HES  |  HAZARD ELIM & SAFETY  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
ICON GC, LLC
PREPARING ROW
STA 125.000 $1,600.000 $1,550.000 $1,398.390 $1,400.000 $2,850.000
SUBGRADE WIDENING (ORD COMP)
STA 295.000 $500.000 $480.000 $498.050 $300.000 $2,000.000
BACKFILL (TY A OR B)
STA 295.000 $260.000 $266.000 $457.080 $305.000 $475.000
BROADCAST SEED (TEMP) (WARM)
SY 72,121.000 $0.150 $0.200 $0.150 $0.190 $0.350
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 72,121.000 $0.350 $0.300 $0.430 $0.540 $0.720
VEGETATIVE WATERING
MG 606.000 $26.000 $32.000 $145.140 $10.000 $1.000
ASPH (AC-20-5TR)
GAL 3,926.000 $3.500 $4.000 $4.460 $7.000 $6.500
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
CY 93.000 $175.000 $480.000 $259.310 $200.000 $255.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 476.000 $105.000 $79.000 $72.020 $80.500 $80.000
PLANE CONC PAV(0" TO 2")
SY 1,301.000 $11.000 $11.000 $12.440 $7.000 $2.900
PLANE ASPH CONC PAV (1")
SY 13,113.000 $3.500 $1.500 $2.440 $1.000 $1.900
RC PIPE (CL III)(18 IN)
LF 289.000 $63.000 $114.500 $59.380 $58.000 $118.000
RC PIPE (CL III)(24 IN)
LF 142.000 $95.000 $151.000 $133.080 $130.000 $145.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 7.000 $4,200.000 $6,135.000 $5,118.570 $5,000.000 $4,000.000
INLET (COMPL)(PSL)(FG)(6FTX6FT-4FTX4FT)
EA 2.000 $7,500.000 $10,725.000 $11,260.850 $11,000.000 $8,300.000
HEADWALL (CH - PW - 0) (DIA= 18 IN)
EA 1.000 $4,000.000 $9,127.000 $6,654.140 $6,500.000 $9,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 18.000 $1,150.000 $1,007.000 $870.160 $850.000 $1,300.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 3.000 $1,100.000 $1,384.000 $1,535.570 $1,500.000 $1,900.000
MOBILIZATION
LS 1.000 $801,618.060 $250,000.000 $190,233.710 $300,000.000 $215,613.490
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $3,000.000 $1,700.000 $720.690 $4,000.000 $1,350.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 800.000 $31.000 $16.500 $43.000 $45.000 $107.000
ROCK FILTER DAMS (REMOVE)
LF 800.000 $9.000 $7.000 $15.360 $15.000 $44.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 200.000 $6.500 $6.300 $6.140 $6.000 $5.750
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $2.250 $3.150 $1.020 $1.000 $1.500
DRIVEWAYS (ACP)
SY 4,213.000 $45.000 $25.000 $22.190 $35.000 $20.000
DRIVEWAYS (BASE)
SY 2,371.000 $40.000 $36.000 $30.880 $35.000 $42.000
RUMBLE STRIPS (CENTERLINE)
LF 29,504.000 $0.200 $0.090 $0.090 $0.250 $0.550
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 67.000 $290.000 $211.000 $307.110 $295.000 $230.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 16.000 $200.000 $243.000 $373.660 $335.000 $275.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 7.000 $810.000 $626.000 $783.140 $685.000 $710.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 82.000 $520.000 $497.000 $445.320 $655.000 $560.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 12.000 $620.000 $737.000 $711.480 $745.000 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 3.000 $780.000 $842.000 $783.140 $935.000 $900.000
REMOVE SM RD SN SUP&AM
EA 102.000 $89.000 $58.000 $71.660 $95.000 $60.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 14.000 $40.000 $142.000 $76.780 $72.000 $140.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 57,703.000 $0.750 $0.400 $0.380 $0.370 $0.500
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 6,170.000 $0.600 $0.400 $0.380 $0.370 $0.520
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 10,791.000 $0.750 $0.400 $0.380 $0.370 $0.530
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,946.000 $1.000 $0.500 $1.360 $1.000 $0.750
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 282.000 $1.000 $0.800 $0.790 $0.770 $2.600
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 6,170.000 $1.000 $0.800 $0.790 $0.770 $1.350
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 10,791.000 $1.000 $0.800 $0.790 $0.770 $1.350
RE PROF PM (W)6"(SLD) RAISD PROF ONLY
LF 57,703.000 $1.000 $0.500 $0.490 $0.480 $1.020
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 160.000 $16.000 $14.000 $13.450 $13.140 $16.500
PREFAB PAV MRK TY C (W) (RR XING)
EA 1.000 $690.000 $395.000 $383.890 $375.000 $775.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 5.000 $50.000 $84.000 $81.900 $80.000 $65.000
REFL PAV MRKR TY II-A-A
EA 504.000 $4.000 $7.000 $6.920 $6.800 $5.500
FULL - WIDTH MOWING
AC 33.000 $1,500.000 $74.000 $699.470 $40.000 $450.000
LITTER REMOVAL
AC 33.000 $150.000 $72.000 $739.380 $35.000 $550.000
D-GR HMA TY-B PG64-22
TON 11,539.000 $130.000 $108.000 $120.260 $133.000 $130.000
D-GR HMA TY-D PG70-22
TON 8,654.000 $130.000 $133.000 $131.260 $139.000 $150.000
TACK COAT
GAL 14,424.000 $5.000 $3.550 $4.790 $3.500 $5.000
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 721.000 $180.000 $156.000 $175.850 $160.000 $145.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,800.000 $10,000.000 $2,887.430 $17,500.000 $9,250.000
TMA (STATIONARY)
DAY 120.000 $175.000 $10.000 $465.020 $175.000 $226.000
TMA (MOBILE OPERATION)
DAY 30.000 $360.000 $15.000 $36.090 $175.000 $850.000
Totals: $5,039,688.360 $3,983,905.560 $4,247,565.070 $4,417,627.160 $5,270,000.000