PREPARING ROW
|
STA
|
4.400
|
$41,500.000
|
$10,000.000
|
$10,500.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
213.000
|
$20.280
|
$17.570
|
$64.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
153.100
|
$2,000.000
|
$2,000.000
|
$1,500.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
3,155.000
|
$12.800
|
$25.000
|
$48.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
153.100
|
$390.000
|
$500.000
|
$228.000
|
|
|
BULLDOZER WORK
|
HR
|
38.000
|
$140.000
|
$91.870
|
$144.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
74,554.000
|
$0.500
|
$0.550
|
$0.370
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
74,554.000
|
$0.500
|
$0.490
|
$0.370
|
|
|
VEGETATIVE WATERING
|
MG
|
257.610
|
$15.000
|
$17.680
|
$54.000
|
|
|
CEMENT
|
TON
|
349.000
|
$266.000
|
$250.000
|
$310.000
|
|
|
CEMENT TREAT (SUBGRADE)(6")
|
SY
|
32,321.000
|
$5.000
|
$5.000
|
$9.500
|
|
|
CM TRT(PT MX)(CL M)(TYA)(GR1-2)(FN POS)
|
CY
|
5,528.000
|
$115.000
|
$150.000
|
$232.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
6,464.000
|
$10.000
|
$4.540
|
$5.000
|
|
|
ASPH (AC-10-2TR)
|
GAL
|
35,519.000
|
$4.500
|
$4.120
|
$4.850
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
|
CY
|
759.000
|
$155.000
|
$215.680
|
$224.000
|
|
|
CEM STABIL BKFL
|
CY
|
107.000
|
$95.000
|
$205.560
|
$243.000
|
|
|
CUT & RESTORING PAV
|
SY
|
767.000
|
$166.000
|
$43.300
|
$20.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
65.000
|
$150.000
|
$126.250
|
$60.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
390.000
|
$108.000
|
$26.990
|
$36.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
212.000
|
$26.000
|
$73.100
|
$171.000
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
6,116.000
|
$87.000
|
$150.000
|
$101.000
|
|
|
CL C CONC (ABUT)
|
CY
|
74.300
|
$1,500.000
|
$2,000.000
|
$3,600.000
|
|
|
CL C CONC (CAP)
|
CY
|
117.400
|
$1,300.000
|
$2,500.000
|
$2,575.000
|
|
|
CL E CONC (SEAL SLAB)
|
CY
|
26.000
|
$1,025.000
|
$500.000
|
$477.000
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
26,664.000
|
$35.000
|
$12.600
|
$19.000
|
|
|
APPROACH SLAB
|
CY
|
214.000
|
$500.000
|
$600.000
|
$605.000
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
6,525.000
|
$205.000
|
$210.040
|
$185.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
48.000
|
$275.000
|
$718.140
|
$1,100.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,547.000
|
$100.000
|
$152.390
|
$189.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
104.000
|
$540.000
|
$709.940
|
$828.000
|
|
|
RAIL (TY T223)
|
LF
|
928.000
|
$190.000
|
$93.710
|
$197.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
340.000
|
$200.000
|
$88.020
|
$198.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
46.000
|
$370.000
|
$884.810
|
$550.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
561.000
|
$100.000
|
$95.540
|
$102.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
922.000
|
$110.000
|
$121.480
|
$105.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
1,406.000
|
$100.000
|
$142.950
|
$134.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
200.000
|
$165.000
|
$184.890
|
$209.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
73.000
|
$300.000
|
$284.450
|
$286.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
1.000
|
$18,269.000
|
$30,960.590
|
$28,500.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
2.000
|
$10,134.000
|
$12,337.550
|
$11,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
28.000
|
$1,400.000
|
$1,420.760
|
$1,600.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
40.000
|
$1,989.000
|
$1,791.810
|
$2,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
78.000
|
$2,940.000
|
$4,260.880
|
$4,800.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$4,800.000
|
$5,959.510
|
$7,500.000
|
|
|
SET (TY II) (42 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$8,600.000
|
$8,083.260
|
$8,900.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,200.000
|
$2,591.530
|
$4,100.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
2.000
|
$35,000.000
|
$100,000.000
|
$146,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,240,000.000
|
$1,060,000.000
|
$967,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
28.000
|
$5,000.000
|
$10,000.000
|
$825.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
160.000
|
$52.500
|
$45.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
160.000
|
$15.000
|
$15.000
|
$10.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,010.000
|
$11.000
|
$5.500
|
$5.850
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,010.000
|
$3.000
|
$1.000
|
$1.150
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,110.000
|
$16.000
|
$46.900
|
$47.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
3,330.000
|
$6.000
|
$9.890
|
$12.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
1,110.000
|
$5.000
|
$14.970
|
$15.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
548.000
|
$100.000
|
$86.660
|
$172.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,930.000
|
$72.000
|
$44.550
|
$39.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
1,553.000
|
$115.000
|
$58.370
|
$40.750
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
44,732.000
|
$0.750
|
$0.140
|
$0.080
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,200.000
|
$33.000
|
$20.470
|
$29.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,500.000
|
$1,892.000
|
$2,220.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,200.000
|
$3.500
|
$2.280
|
$4.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$265.000
|
$315.000
|
$292.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$3,500.000
|
$2,996.000
|
$3,300.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$280.000
|
$315.000
|
$322.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
6.000
|
$1,900.000
|
$2,974.000
|
$1,750.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,005.000
|
$1,428.000
|
$1,055.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$2,250.000
|
$29,529.900
|
$29,800.000
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
16.000
|
$484.000
|
$367.000
|
$462.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
24.000
|
$575.000
|
$581.000
|
$771.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
6.000
|
$925.000
|
$665.000
|
$1,093.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
|
EA
|
2.000
|
$1,019.000
|
$749.000
|
$1,256.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(P)
|
EA
|
2.000
|
$652.000
|
$889.000
|
$1,023.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U-1EXT)
|
EA
|
1.000
|
$1,615.000
|
$1,010.000
|
$1,403.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
35.000
|
$93.000
|
$59.000
|
$129.000
|
|
|
RELOCATE LRSA
|
EA
|
1.000
|
$5,797.000
|
$6,574.000
|
$5,300.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
42.000
|
$40.000
|
$30.000
|
$42.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
4.000
|
$160.000
|
$175.000
|
$105.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
284.000
|
$4.200
|
$3.500
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
284.000
|
$4.680
|
$3.500
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
852.000
|
$3.850
|
$3.000
|
$3.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,472.000
|
$1.440
|
$3.000
|
$0.850
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
44,732.000
|
$0.600
|
$0.600
|
$0.700
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
11,240.000
|
$0.600
|
$0.650
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
44,732.000
|
$0.600
|
$0.600
|
$0.700
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
231.000
|
$21.000
|
$16.500
|
$19.250
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
10.000
|
$250.000
|
$293.550
|
$343.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
10.000
|
$267.000
|
$392.280
|
$459.000
|
|
PREFAB PAV MRK TY C(EVAC SYM, BLUE/WHT)
|
EA
|
5.000
|
$350.000
|
$330.000
|
$386.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,124.000
|
$8.100
|
$5.000
|
$5.850
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
9,731.000
|
$77.000
|
$131.410
|
$180.500
|
|
|
TACK COAT
|
GAL
|
1,939.000
|
$4.500
|
$3.240
|
$4.500
|
|
|
ASBESTOS ABATEMENT (OTHER)
|
SF
|
70.000
|
$60.000
|
$115.000
|
$315.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,615.000
|
$8,328.960
|
$20,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
676.000
|
$300.000
|
$173.070
|
$10.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
174.000
|
$445.000
|
$666.670
|
$10.000
|
|
Totals: |
$10,873,052.390
|
$10,561,319.695
|
$11,349,830.810
|