Show Job Controls
Bid Cobra

LIBERTY SH 105 (0593-01-135)

Items: 97

County: LIBERTY
Length: N/A
Highway: SH 105
District: BEAUMONT
Control Number: 0593-01-135
DBE Goal: N/A
Project: CM 2023(346)
Guaranty: N/A
Time: 401 WORKING DAYS
Engineer's Estimate: $10,873,052.39
Date: 01/06/2023 (3 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
ROBERTO M RODRIGUEZ
TOMMY BRIDWELL
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$10,873,052.39
$10,561,319.69
Over/Under Est: -2.87% -$311,732.70
Over/Under Est: 4.38% $476,778.42
Amt Left: 7.47% $788,511.12
Subcontractor Percentage Amount
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC 12.11% $1,557,958.59
TEX-BRASKA, LLC 4.53% $582,787.15
WEBER-BALKE FOUNDATION COMPANY, INC 3.94% $506,883.31
TRAFFIC SIGNS & LINES, LLC 2.23% $286,890.81
SOUTHWEST ENVIRONMENT SERVICES LLC 0.39% $50,173.73
DURWOOD GREENE CONSTRUCTION CO. 0.27% $34,735.66
ASPHALT MAINTENANCE, INC. 0.25% $32,162.65
HIGHWAY 1 LLC 0.21% $27,016.62
KLP COMMERCIAL, L.L.C. 0.15% $19,297.59
CEN TEX HYDROSEED, INC. 0.13% $16,724.58
CEN-TEX SEEDING, INC. 0.13% $16,724.58
PRIMATE CONSTRUCTION, LP 0.12% $15,438.07
J.KRU LAND SERVICES, LLC 0.08% $10,292.05
WEST TEXAS ROCK RESOURCES, LLC 0.06% $7,719.04
S&S BRIDGE PAINTING 0.06% $7,719.04
AIMS COMPANIES 0.04% $5,146.02
Total: 24.70% $3,177,669.49

Bid Items & Bid Tabulations

97 Total 0 of 97
LIBERTY  |  SH 105  |  BEAUMONT  |  0593-01-135  |  01/06/2023  |  $10,873,052.39  |  CM 2023(346)  |  SURF/ROADWAY RESTOR  |  401 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES CONSTRUCTION GROUP, LLC
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 4.400 $41,500.000 $10,000.000 $10,500.000
REMOVING CONC (DRIVEWAYS)
SY 213.000 $20.280 $17.570 $64.000
SUBGRADE WIDENING (ORD COMP)
STA 153.100 $2,000.000 $2,000.000 $1,500.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 3,155.000 $12.800 $25.000 $48.000
BACKFILL (TY A OR B)
STA 153.100 $390.000 $500.000 $228.000
BULLDOZER WORK
HR 38.000 $140.000 $91.870 $144.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 74,554.000 $0.500 $0.550 $0.370
CELL FBR MLCH SEED(TEMP)(WARM)
SY 74,554.000 $0.500 $0.490 $0.370
VEGETATIVE WATERING
MG 257.610 $15.000 $17.680 $54.000
CEMENT
TON 349.000 $266.000 $250.000 $310.000
CEMENT TREAT (SUBGRADE)(6")
SY 32,321.000 $5.000 $5.000 $9.500
CM TRT(PT MX)(CL M)(TYA)(GR1-2)(FN POS)
CY 5,528.000 $115.000 $150.000 $232.000
PRIME COAT (AE-P)
GAL 6,464.000 $10.000 $4.540 $5.000
ASPH (AC-10-2TR)
GAL 35,519.000 $4.500 $4.120 $4.850
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
CY 759.000 $155.000 $215.680 $224.000
CEM STABIL BKFL
CY 107.000 $95.000 $205.560 $243.000
CUT & RESTORING PAV
SY 767.000 $166.000 $43.300 $20.000
CUT & RESTORE CONC PAVING
SY 65.000 $150.000 $126.250 $60.000
CUT & RESTORE ASPH PAVING
SY 390.000 $108.000 $26.990 $36.000
TEMPORARY SPL SHORING
SF 212.000 $26.000 $73.100 $171.000
PRESTR CONC PIL (18 IN SQ)
LF 6,116.000 $87.000 $150.000 $101.000
CL C CONC (ABUT)
CY 74.300 $1,500.000 $2,000.000 $3,600.000
CL C CONC (CAP)
CY 117.400 $1,300.000 $2,500.000 $2,575.000
CL E CONC (SEAL SLAB)
CY 26.000 $1,025.000 $500.000 $477.000
REINF CONC SLAB (SLAB BEAM)
SF 26,664.000 $35.000 $12.600 $19.000
APPROACH SLAB
CY 214.000 $500.000 $600.000 $605.000
PRESTR CONC SLAB BEAM (4SB15)
LF 6,525.000 $205.000 $210.040 $185.000
RIPRAP (CONC)(CL B)
CY 48.000 $275.000 $718.140 $1,100.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,547.000 $100.000 $152.390 $189.000
RIPRAP (MOW STRIP)(4 IN)
CY 104.000 $540.000 $709.940 $828.000
RAIL (TY T223)
LF 928.000 $190.000 $93.710 $197.000
ARMOR JOINT (SEALED)
LF 340.000 $200.000 $88.020 $198.000
CONC BOX CULV (4 FT X 4 FT)
LF 46.000 $370.000 $884.810 $550.000
RC PIPE (CL III)(18 IN)
LF 561.000 $100.000 $95.540 $102.000
RC PIPE (CL III)(24 IN)
LF 922.000 $110.000 $121.480 $105.000
RC PIPE (CL III)(30 IN)
LF 1,406.000 $100.000 $142.950 $134.000
RC PIPE (CL III)(36 IN)
LF 200.000 $165.000 $184.890 $209.000
RC PIPE (CL III)(42 IN)
LF 73.000 $300.000 $284.450 $286.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $18,269.000 $30,960.590 $28,500.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $10,134.000 $12,337.550 $11,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 28.000 $1,400.000 $1,420.760 $1,600.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 40.000 $1,989.000 $1,791.810 $2,000.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 78.000 $2,940.000 $4,260.880 $4,800.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 12.000 $4,800.000 $5,959.510 $7,500.000
SET (TY II) (42 IN) (RCP) (6: 1) (P)
EA 4.000 $8,600.000 $8,083.260 $8,900.000
REMOV STR (HEADWALL)
EA 2.000 $1,200.000 $2,591.530 $4,100.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 2.000 $35,000.000 $100,000.000 $146,000.000
MOBILIZATION
LS 1.000 $2,240,000.000 $1,060,000.000 $967,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 28.000 $5,000.000 $10,000.000 $825.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 160.000 $52.500 $45.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 160.000 $15.000 $15.000 $10.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,010.000 $11.000 $5.500 $5.850
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,010.000 $3.000 $1.000 $1.150
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 1,110.000 $16.000 $46.900 $47.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 3,330.000 $6.000 $9.890 $12.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 1,110.000 $5.000 $14.970 $15.000
DRIVEWAYS (CONC)
SY 548.000 $100.000 $86.660 $172.000
DRIVEWAYS (ACP)
SY 1,930.000 $72.000 $44.550 $39.000
DRIVEWAYS (SURF TREAT)
SY 1,553.000 $115.000 $58.370 $40.750
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 44,732.000 $0.750 $0.140 $0.080
MTL W-BEAM GD FEN (TIM POST)
LF 1,200.000 $33.000 $20.470 $29.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,500.000 $1,892.000 $2,220.000
REMOVE METAL BEAM GUARD FENCE
LF 1,200.000 $3.500 $2.280 $4.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $265.000 $315.000 $292.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,500.000 $2,996.000 $3,300.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $280.000 $315.000 $322.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $1,900.000 $2,974.000 $1,750.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,005.000 $1,428.000 $1,055.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $2,250.000 $29,529.900 $29,800.000
RELOCATE EXISTING MAILBOX
EA 16.000 $484.000 $367.000 $462.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 24.000 $575.000 $581.000 $771.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 6.000 $925.000 $665.000 $1,093.000
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
EA 2.000 $1,019.000 $749.000 $1,256.000
IN SM RD SN SUP&AM TYS80(1)SB(P)
EA 2.000 $652.000 $889.000 $1,023.000
IN SM RD SN SUP&AM TYS80(1)SB(U-1EXT)
EA 1.000 $1,615.000 $1,010.000 $1,403.000
REMOVE SM RD SN SUP&AM
EA 35.000 $93.000 $59.000 $129.000
RELOCATE LRSA
EA 1.000 $5,797.000 $6,574.000 $5,300.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 42.000 $40.000 $30.000 $42.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 4.000 $160.000 $175.000 $105.000
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 284.000 $4.200 $3.500 $4.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 284.000 $4.680 $3.500 $4.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 852.000 $3.850 $3.000 $3.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,472.000 $1.440 $3.000 $0.850
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 44,732.000 $0.600 $0.600 $0.700
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 11,240.000 $0.600 $0.650 $0.750
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 44,732.000 $0.600 $0.600 $0.700
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 231.000 $21.000 $16.500 $19.250
PREFAB PAV MRK TY C (W) (ARROW)
EA 10.000 $250.000 $293.550 $343.000
PREFAB PAV MRK TY C (W) (WORD)
EA 10.000 $267.000 $392.280 $459.000
PREFAB PAV MRK TY C(EVAC SYM, BLUE/WHT)
EA 5.000 $350.000 $330.000 $386.000
REFL PAV MRKR TY II-A-A
EA 1,124.000 $8.100 $5.000 $5.850
D-GR HMA TY-B PG64-22
TON 9,731.000 $77.000 $131.410 $180.500
TACK COAT
GAL 1,939.000 $4.500 $3.240 $4.500
ASBESTOS ABATEMENT (OTHER)
SF 70.000 $60.000 $115.000 $315.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,615.000 $8,328.960 $20,500.000
TMA (STATIONARY)
DAY 676.000 $300.000 $173.070 $10.000
TMA (MOBILE OPERATION)
DAY 174.000 $445.000 $666.670 $10.000
Totals: $10,873,052.390 $10,561,319.695 $11,349,830.810