LIBERTY SH 321 (0593-01-120)

Items: 75

County: LIBERTY
Length: N/A
Highway: SH 321
District: BEAUMONT
Control Number: 0593-01-120
DBE Goal: N/A
Project: STP 2018(566)HES
Guaranty: N/A
Time: 208 WORKING DAYS
Engineer's Estimate: $6,053,523.77
Date: 02/01/2018 (8 years ago)
Contract Number: N/A
Type: INSTALL TURN LANE, PASSING LANES & RUMBLE STRIPS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$6,053,523.77
$5,234,742.15
Over/Under Est: -13.53% -$818,781.62
$5,236,355.83
Over/Under Est: -13.5% -$817,167.94
Amt Left: 0.03% $1,613.68
Over/Under Est: -4.4% -$266,287.16
Amt Left: 10.55% $552,494.46
Delta: -10.52% -$550,880.78
Over/Under Est: 0.48% $29,164.97
Amt Left: 16.2% $847,946.59
Delta: -5.11% -$295,452.13

Bid Items & Bid Tabulations

75 Total 0 of 75
LIBERTY  |  SH 321  |  BEAUMONT  |  0593-01-120  |  02/01/2018  |  $6,053,523.77  |  STP 2018(566)HES  |  INSTL TURN LANE, PASSING LANES & RUM...  |  208 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANGEL BROTHERS HOLDINGS CORP.
SMITH & COMPANY
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
OLDCASTLE MATERIALS TEXAS, INC.
REMOVING CONC (DRIVEWAYS)
SY 635.000 $41.000 $10.500 $10.000 $10.000 $14.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 1,771.000 $3.000 $3.800 $9.000 $4.000 $7.000
REMOVING STAB BASE & ASPH PAV (12")
SY 55,913.000 $7.000 $3.500 $5.000 $3.750 $3.300
SUBGRADE WIDENING (ORD COMP)
STA 236.840 $330.000 $300.000 $372.000 $950.000 $425.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 5,160.000 $10.200 $14.400 $20.250 $20.500 $19.000
BACKFILL (TY A OR B)
STA 236.840 $130.000 $175.000 $292.000 $275.000 $185.000
BLADING
HR 200.000 $100.000 $65.250 $150.000 $125.000 $130.000
BROADCAST SEED (TEMP) (WARM)
SY 64,771.000 $0.200 $0.100 $0.150 $0.090 $0.120
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 64,771.000 $0.250 $0.350 $0.340 $0.320 $0.300
VEGETATIVE WATERING
MG 1,635.000 $17.000 $19.500 $10.000 $5.000 $11.500
PROOF ROLLING
HR 815.000 $80.000 $68.000 $25.000 $30.000 $85.000
FL BS (CMP IN PLC)(TY D GR1-2)(8")
SY 81,540.000 $12.000 $12.550 $10.300 $19.500 $16.000
CEMENT
TON 2,419.000 $180.000 $136.500 $132.000 $125.000 $185.000
CEMENT TREAT (NEW BASE) (8")
SY 81,540.000 $5.000 $3.450 $2.650 $1.400 $2.950
CEMENT TREAT (SUBGRADE)(6")
SY 83,294.000 $3.000 $2.150 $2.100 $1.200 $2.950
PRIME COAT (AE-P)
GAL 14,904.000 $4.900 $2.350 $3.100 $3.000 $2.700
D-GR HMA TY-D PG 70-22 (LEVEL-UP)
TON 6,148.000 $79.000 $80.000 $73.000 $72.000 $80.000
SUPERPAVE MIXTURES SP-D SAC-A PG70-22
TON 16,033.000 $80.000 $80.000 $81.000 $76.150 $85.000
PLANE ASPH CONC PAV(0" TO 2")
SY 777.000 $2.500 $8.700 $15.000 $3.000 $6.200
FULL-DEPTH REPAIR CPJR (VAR DEPTH)
CY 100.000 $300.000 $735.000 $714.000 $350.000 $550.000
CEM STABIL BKFL
CY 41.000 $62.000 $105.000 $102.000 $175.000 $220.000
TEMPORARY SPL SHORING
SF 126.000 $13.000 $52.500 $51.000 $40.000 $80.000
RIPRAP (CONC)(4 IN)
CY 4.000 $380.000 $580.000 $561.000 $800.000 $745.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 153.000 $700.000 $420.000 $510.000 $300.000 $590.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 78.000 $550.000 $525.000 $612.000 $400.000 $692.000
RC PIPE (CL III)(24 IN)
LF 420.000 $65.000 $89.000 $87.000 $85.000 $100.000
WINGWALL (PW - 1) (HW=5 FT)
EA 2.000 $11,350.000 $16,800.000 $16,500.000 $13,500.000 $19,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 18.000 $7,100.000 $4,100.000 $3,600.000 $2,900.000 $4,300.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 32.000 $1,280.000 $945.000 $925.000 $1,100.000 $1,300.000
MOBILIZATION
LS 1.000 $282,357.770 $140,000.000 $357,000.000 $400,000.000 $341,600.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $7,500.000 $825.000 $900.000 $2,500.000 $2,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 730.000 $29.000 $29.400 $25.000 $28.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 730.000 $8.500 $9.450 $10.000 $9.000 $8.200
TEMP SEDMT CONT FENCE (INSTALL)
LF 955.000 $2.300 $3.700 $2.000 $3.500 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 955.000 $0.850 $1.050 $1.000 $1.000 $1.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 120.000 $56.000 $20.000 $35.000 $85.000 $62.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 120.000 $5.000 $15.000 $15.000 $25.000 $50.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 120.000 $6.500 $15.000 $35.000 $40.000 $47.000
INTRSCT, DRVWAYS, & TURNOUT (CONC)
SY 639.000 $87.000 $73.500 $72.000 $92.000 $120.000
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 977.000 $23.000 $63.800 $62.000 $40.000 $48.000
DRIVEWAYS (BASE)
SY 1,794.000 $20.000 $36.300 $16.000 $38.000 $60.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 52,780.000 $0.200 $0.150 $0.130 $0.130 $0.100
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 22,239.000 $0.200 $0.150 $0.130 $0.130 $0.200
CRASH CUSH ATTEN (INSTL)
EA 2.000 $12,600.000 $17,640.000 $16,000.000 $16,000.000 $14,500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,700.000 $5,355.000 $3,900.000 $4,000.000 $1,200.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $990.000 $1,050.000 $1,000.000 $1,000.000 $925.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 61.000 $240.000 $385.000 $184.000 $365.000 $189.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 8.000 $240.000 $475.000 $234.000 $455.000 $200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 47.000 $470.000 $380.000 $357.000 $360.000 $380.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $590.000 $430.000 $393.000 $410.000 $450.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 2.000 $660.000 $550.000 $521.000 $525.000 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $610.000 $565.000 $545.000 $540.000 $630.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $745.000 $815.000 $735.000 $775.000 $870.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 24.000 $350.000 $360.000 $316.000 $340.000 $300.000
RELOCATE LRSA
EA 1.000 $3,410.000 $4,000.000 $3,900.000 $3,800.000 $3,200.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 12.000 $62.000 $50.400 $51.000 $48.000 $55.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 47,736.000 $0.300 $0.150 $0.270 $0.140 $0.270
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 48,181.000 $0.300 $0.150 $0.280 $0.150 $0.280
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 47,736.000 $0.600 $0.500 $0.360 $0.580 $0.360
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 48,181.000 $0.650 $0.500 $0.360 $0.620 $0.360
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,398.000 $1.600 $0.550 $1.500 $1.000 $1.600
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 6,470.000 $1.100 $0.550 $1.500 $1.000 $1.600
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 36.000 $1.100 $1.050 $2.000 $1.800 $2.050
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,271.000 $0.800 $0.650 $0.710 $0.800 $0.720
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 3,470.000 $0.400 $0.400 $0.310 $0.300 $0.310
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 48,394.000 $0.350 $0.350 $0.310 $0.280 $0.310
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 2,100.000 $0.280 $0.400 $0.680 $0.300 $0.310
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 50,934.000 $0.300 $0.350 $0.310 $0.280 $0.310
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 218.000 $12.000 $15.000 $12.250 $9.850 $12.250
PREFAB PAV MRK TY C (W) (ARROW)
EA 17.000 $203.000 $240.000 $189.000 $235.000 $190.000
PREFAB PAV MRK TY C (W) (WORD)
EA 13.000 $285.000 $335.000 $230.000 $300.000 $230.000
REFL PAV MRKR TY I-C
EA 231.000 $3.350 $4.850 $3.000 $3.000 $3.050
REFL PAV MRKR TY II-A-A
EA 1,067.000 $6.000 $4.850 $3.000 $3.000 $3.050
REMOVE CENTERLINE TEXTURING
LF 24,288.000 $8.000 $4.100 $3.150 $3.000 $1.350
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $1,300.000 $3,000.000 $15,000.000 $16,000.000
Totals: $6,053,523.770 $5,234,742.150 $5,236,355.830 $5,787,236.610 $6,082,688.740