Show Job Controls
Bid Cobra

LIBERTY SH 321 (0593-01-114)

Items: 33

County: LIBERTY
Length: N/A
Highway: SH 321
District: BEAUMONT
Control Number: 0593-01-114
DBE Goal: N/A
Project: STP 1702(277)
Guaranty: N/A
Time: 29 WORKING DAYS
Engineer's Estimate: $1,074,887.90
Date: 06/07/2017 (9 years ago)
Contract Number: N/A
Type: OVERLAY EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$1,074,887.90
Over/Under Est: -2.24% -$24,051.22
Over/Under Est: -1.99% -$21,431.35
Amt Left: 0.25% $2,619.87
Over/Under Est: 6.99% $75,109.33
Amt Left: 9.44% $99,160.55
Delta: -9.16% -$96,540.68
$1,199,373.73
Over/Under Est: 11.58% $124,485.83
Amt Left: 14.14% $148,537.05
Delta: -4.29% -$49,376.50

Bid Items & Bid Tabulations

33 Total 0 of 33
LIBERTY  |  SH 321  |  BEAUMONT  |  0593-01-114  |  06/07/2017  |  $1,074,887.90  |  STP 1702(277)  |  OVERLAY EXIST ROADWAY  |  29 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
OLDCASTLE MATERIALS TEXAS, INC.
ANGEL BROTHERS HOLDINGS CORP.
SMITH & COMPANY
SUPERPAVE MIXTURES SP-D SAC-A PG70-22
TON 8,389.000 $80.000 $82.000 $88.000 $81.500 $90.000
PLANE ASPH CONC PAV (1.5")
SY 95,796.000 $1.500 $0.900 $1.500 $1.500 $2.000
FULL - DEPTH REPAIR CPJR (10")
SY 200.000 $300.000 $480.000 $260.000 $660.000 $510.000
MOBILIZATION
LS 1.000 $100,000.000 $100,000.000 $43,000.000 $100,000.000 $77,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $5,000.000 $5,000.000 $3,000.000 $4,075.000 $975.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 200.000 $5.000 $0.001 $5.600 $6.500 $11.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $1.000 $2.000 $1.000 $2.000 $2.000
DRIVEWAYS (ACP)
SY 506.000 $50.000 $25.500 $26.000 $18.000 $25.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 15,960.000 $0.250 $0.250 $0.250 $0.850 $0.160
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 8,394.000 $0.250 $0.300 $0.310 $0.850 $0.220
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 2,570.000 $0.200 $0.140 $0.100 $0.150 $0.140
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
LF 85.000 $0.200 $0.500 $0.100 $0.550 $0.510
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 22,354.000 $0.200 $0.130 $0.100 $0.130 $0.130
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,681.000 $0.400 $0.300 $0.200 $0.300 $0.310
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 408.000 $2.000 $2.000 $0.750 $2.000 $2.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 2,180.000 $0.200 $0.140 $0.100 $0.140 $0.140
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 28,000.000 $0.200 $0.130 $0.100 $0.130 $0.140
WK ZN PAV MRK REMOV (W)(ARROW)
EA 30.000 $100.000 $30.000 $0.500 $30.000 $31.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 6.000 $160.000 $30.000 $0.750 $30.000 $31.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 997.000 $1.000 $1.000 $1.350 $1.000 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,054.000 $1.000 $1.000 $1.350 $1.000 $1.000
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 85.000 $2.000 $1.500 $1.050 $1.500 $1.550
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 2,681.000 $0.800 $0.900 $0.700 $0.900 $0.920
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 2,570.000 $0.350 $0.300 $0.360 $0.300 $0.310
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 22,354.000 $0.350 $0.290 $0.340 $0.290 $0.300
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 2,180.000 $0.350 $0.300 $0.360 $0.300 $0.310
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 28,000.000 $0.350 $0.290 $0.340 $0.290 $0.300
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 408.000 $10.000 $11.500 $14.400 $11.500 $11.750
PREFAB PAV MRK TY C (W) (ARROW)
EA 30.000 $200.000 $190.000 $205.000 $190.000 $194.000
PREFAB PAV MRK TY C (W) (WORD)
EA 6.000 $250.000 $265.000 $275.000 $265.000 $271.000
PREFAB PAV MRK TY C(EVAC SYM, BLUE/WHT)
EA 1.000 $500.000 $2,200.000 $560.000 $2,200.000 $2,250.000
REFL PAV MRKR TY I-C
EA 392.000 $3.000 $4.000 $3.050 $4.000 $4.000
REFL PAV MRKR TY II-A-A
EA 897.000 $3.000 $4.000 $3.050 $4.000 $4.000
Totals: $1,074,887.900 $1,050,836.680 $1,053,456.550 $1,149,997.230 $1,199,373.730