Show Job Controls
Bid Cobra

LIBERTY SH 146 (0389-01-044)

Items: 32

County: LIBERTY
Length: N/A
Highway: SH 146
District: BEAUMONT
Control Number: 0389-01-044
DBE Goal: N/A
Project: F 2023(345)
Guaranty: N/A
Time: 142 WORKING DAYS
Engineer's Estimate: $11,413,207.48
Date: 01/06/2023 (3 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
ROBERTO RODRIGUEZ
TOMMY BRIDWELL
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$11,413,207.48
$9,934,425.44
Over/Under Est: -12.96% -$1,478,782.04
Over/Under Est: -1.87% -$213,207.49
Amt Left: 12.74% $1,265,574.55

Bid Items & Bid Tabulations

32 Total 0 of 32
LIBERTY  |  SH 146  |  BEAUMONT  |  0389-01-044  |  01/06/2023  |  $11,413,207.48  |  F 2023(345)  |  SURF/ROADWAY RESTOR  |  142 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC
BACKFILL (TY B)
STA 606.910 $400.000 $249.500 $256.700
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 267.000 $80.000 $132.750 $156.690
PLANE ASPH CONC PAV (1")
SY 223,384.000 $2.500 $1.550 $1.870
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 5,422.000 $3.000 $10.000 $12.830
MOBILIZATION
LS 1.000 $1,540,000.000 $200,000.000 $387,507.860
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $5,000.000 $2,900.000 $860.040
RUMBLE STRIPS (SHOULDER)
LF 121,382.000 $1.650 $0.060 $0.300
RUMBLE STRIPS (CENTERLINE)
LF 55,194.000 $1.650 $0.060 $0.300
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 122,214.000 $0.500 $0.250 $0.340
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 116,386.000 $0.470 $0.250 $0.034
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 8,736.000 $1.170 $0.830 $1.140
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 13,452.000 $1.130 $0.830 $1.280
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,625.000 $1.000 $1.150 $1.550
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 122,214.000 $0.600 $0.490 $0.660
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 116,386.000 $0.600 $0.490 $0.660
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 106,850.000 $0.600 $0.490 $0.660
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 119,090.000 $0.600 $0.490 $0.660
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 106.000 $13.770 $14.000 $18.810
PREFAB PAV MRK TY C (W) (ARROW)
EA 12.000 $237.000 $230.000 $309.080
PREFAB PAV MRK TY C (W) (WORD)
EA 12.000 $290.000 $280.000 $376.270
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 16.000 $36.000 $36.000 $48.380
REFL PAV MRKR TY I-C
EA 1,370.000 $5.300 $5.000 $6.720
REFL PAV MRKR TY II-A-A
EA 2,672.000 $5.130 $5.000 $6.720
REFL PAV MRKR TY II-C-R
EA 156.000 $6.000 $5.000 $6.720
CAM (ASPHALT) PG(76-22)
TON 743.000 $170.000 $184.000 $0.010
CAM (AGGREGATE)
TON 9,879.000 $170.000 $184.000 $195.940
TACK COAT
GAL 4,568.000 $11.450 $3.750 $8.010
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 1,663.000 $200.000 $225.000 $190.850
SP MIXES SP-D SAC-A PG76-22
TON 43,906.000 $130.000 $140.000 $159.140
TACK COAT
GAL 53,220.000 $5.410 $3.750 $5.980
TMA (STATIONARY)
DAY 110.000 $350.000 $475.000 $346.270
TMA (MOBILE OPERATION)
DAY 34.000 $480.000 $775.000 $346.270
Totals: $11,413,207.480 $9,934,425.445 $11,200,000.001