|
|
PREPARING ROW
|
STA
|
74.400
|
$7,200.000
|
$3,200.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
74.400
|
$750.000
|
$1,300.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
2,295.000
|
$21.420
|
$31.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
76.780
|
$211.000
|
$380.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
25,064.000
|
$0.410
|
$0.450
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
25,064.000
|
$0.460
|
$0.450
|
|
|
VEGETATIVE WATERING
|
MG
|
211.000
|
$128.000
|
$31.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
3,474.000
|
$156.000
|
$143.000
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
1.000
|
$485.000
|
$370.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
2,084.000
|
$4.300
|
$11.750
|
|
|
CEMENT
|
TON
|
6.000
|
$300.000
|
$300.000
|
|
|
CEMENT TREAT (SUBGRADE)(6")
|
SY
|
11,812.000
|
$5.000
|
$5.750
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
25,438.000
|
$6.000
|
$3.600
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
|
CY
|
505.000
|
$380.000
|
$362.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
350.000
|
$120.000
|
$110.000
|
|
|
PLANE ASPH CONC PAV(2" TO 4")
|
SY
|
1,212.000
|
$6.000
|
$12.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
17,062.000
|
$2.600
|
$3.000
|
|
|
FULL - DEPTH REPAIR CPJR (11")
|
SY
|
24.000
|
$625.000
|
$1,000.000
|
|
|
CEM STABIL BKFL
|
CY
|
114.000
|
$380.000
|
$72.000
|
|
|
CUT & RESTORING PAV
|
SY
|
575.000
|
$216.000
|
$50.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,500.000
|
$50.000
|
$63.000
|
|
|
CL E CONC (SEAL SLAB)
|
CY
|
18.000
|
$460.000
|
$275.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
14.000
|
$1,080.000
|
$3,300.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
88.000
|
$1,050.000
|
$545.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
54,256.000
|
$2.800
|
$2.900
|
|
|
RAIL (TY T223)
|
LF
|
112.000
|
$230.000
|
$178.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)
|
LF
|
122.000
|
$555.000
|
$630.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
37.000
|
$650.000
|
$850.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
8.000
|
$350.000
|
$1,300.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
16.000
|
$400.000
|
$1,400.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
33.000
|
$570.000
|
$1,700.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,191.000
|
$150.000
|
$175.000
|
|
|
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$7,000.000
|
$9,200.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
1.000
|
$7,000.000
|
$15,250.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
3.000
|
$40,500.000
|
$23,250.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
2.000
|
$5,000.000
|
$5,500.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
4.000
|
$5,000.000
|
$6,300.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,850.000
|
$1,150.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
67.000
|
$2,500.000
|
$1,575.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
10.000
|
$600.000
|
$600.000
|
|
|
ADJUSTING INLETS
|
EA
|
11.000
|
$850.000
|
$1,350.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
10.000
|
$2,500.000
|
$5,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$660,000.000
|
$357,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$6,000.000
|
$1,100.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
80.000
|
$50.000
|
$57.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
80.000
|
$15.000
|
$13.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
720.000
|
$5.250
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
720.000
|
$1.750
|
$2.250
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
420.000
|
$80.000
|
$150.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
360.000
|
$50.000
|
$39.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$51.300
|
$26.500
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
420.000
|
$52.000
|
$31.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
360.000
|
$53.000
|
$39.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$53.000
|
$26.500
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,194.000
|
$250.000
|
$124.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,346.000
|
$85.000
|
$67.500
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
30,236.000
|
$0.400
|
$0.050
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
7,678.000
|
$0.400
|
$0.100
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
225.000
|
$42.000
|
$26.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,250.000
|
$2,300.000
|
|
|
SHORT RADIUS
|
LF
|
300.000
|
$450.000
|
$525.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,075.000
|
$16.000
|
$3.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$3,400.000
|
$3,300.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
6.000
|
$446.000
|
$165.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
1.000
|
$7,000.000
|
$34,000.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
17.000
|
$315.000
|
$300.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
5.000
|
$350.000
|
$375.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
9.000
|
$875.000
|
$530.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
33.000
|
$605.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$755.000
|
$670.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$905.000
|
$750.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
1.000
|
$605.000
|
$445.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
2.000
|
$1,200.000
|
$630.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
$1,100.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
15.000
|
$900.000
|
$970.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$1,250.000
|
$1,050.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$35.000
|
$28.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
11.000
|
$38.000
|
$39.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
2.000
|
$120.000
|
$85.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
770.000
|
$0.500
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(BRK)
|
LF
|
29,628.000
|
$0.500
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
2,500.000
|
$0.500
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
18,231.000
|
$0.500
|
$0.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
231.000
|
$1.000
|
$0.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,663.000
|
$1.000
|
$0.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
2,159.000
|
$2.500
|
$2.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
770.000
|
$1.050
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
29,628.000
|
$1.050
|
$0.850
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
2,500.000
|
$1.050
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
18,231.000
|
$1.050
|
$0.850
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
427.000
|
$20.000
|
$13.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
14.000
|
$200.000
|
$270.000
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
2.000
|
$450.000
|
$650.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
5.000
|
$52.000
|
$83.000
|
|
PREFAB PAV MRK TY C (Y) (24") (SLD)
|
LF
|
128.000
|
$18.000
|
$13.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
44.000
|
$6.050
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
374.000
|
$6.250
|
$5.000
|
|
|
SPALLING REPAIR (HYDRAULIC CEMENT)
|
CF
|
200.000
|
$245.000
|
$295.000
|
|
|
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
|
GAL
|
500.000
|
$95.000
|
$165.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
4,847.000
|
$160.000
|
$133.500
|
|
|
TACK COAT
|
GAL
|
1,858.000
|
$13.000
|
$3.500
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
9,665.000
|
$190.000
|
$156.000
|
|
|
TACK COAT
|
GAL
|
5,271.000
|
$5.000
|
$3.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$1,000.000
|
$31,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
214.000
|
$360.000
|
$275.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
19.000
|
$250.000
|
$1,300.000
|
|
Totals: |
$7,558,961.110
|
$6,277,671.950
|