Show Job Controls
Bid Cobra

LIBERTY SH 146 (0388-02-069)

Items: 38

County: LIBERTY
Length: N/A
Highway: SH 146
District: BEAUMONT
Control Number: 0388-02-069
DBE Goal: N/A
Project: F 2023(748)
Guaranty: N/A
Time: 69 WORKING DAYS
Engineer's Estimate: $4,406,503.00
Date: 05/05/2023 (3 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
ROBERTO M RODRIGUEZ
NYEMB NYEMB
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$4,406,503.00
Over/Under Est: -20.63% -$909,228.75
Over/Under Est: -18.23% -$803,339.43
Amt Left: 3.03% $105,889.32
Over/Under Est: -17.79% -$783,981.13
Amt Left: 3.58% $125,247.62
Delta: -0.54% -$19,358.30
Subcontractor Percentage Amount
WILLOW CITY SIGN & RAIL, INC. 2.60% $92,763.27
SEMPER STRIPING LLC 1.34% $47,808.76
PROTECTIVE RESOLUTION, LLC 0.56% $19,979.78
PROFESSIONAL TRAFFIC CONTROL LLC 0.42% $14,984.84
CEN TEX HYDROSEED, INC. 0.38% $13,557.71
Total: 5.30% $189,094.36

Bid Items & Bid Tabulations

38 Total 0 of 38
LIBERTY  |  SH 146  |  BEAUMONT  |  0388-02-069  |  05/05/2023  |  $4,406,503.00  |  F 2023(748)  |  SURF/ROADWAY RESTOR  |  69 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC
TEXAS MATERIALS GROUP, INC.
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
BACKFILL (TY A OR B)
STA 322.000 $350.000 $255.600 $397.000 $335.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 35,769.000 $1.000 $0.200 $0.180 $0.180
VEGETATIVE WATERING
MG 301.000 $15.000 $25.000 $28.000 $10.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,762.000 $120.000 $70.800 $79.000 $64.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 1,956.000 $4.000 $5.900 $8.350 $6.500
PLANE ASPH CONC PAV (1")
SY 14,308.000 $3.000 $1.800 $2.000 $2.000
RIPRAP (MOW STRIP)(4 IN)
CY 82.000 $600.000 $722.600 $918.000 $1,200.000
MOBILIZATION
LS 1.000 $575,000.000 $206,436.000 $115,000.000 $140,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $6,000.000 $5,151.000 $2,400.000 $4,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,000.000 $5.000 $5.800 $5.500 $5.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,000.000 $1.000 $1.600 $1.500 $1.500
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 1,772.000 $50.000 $29.100 $40.500 $32.350
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 63,919.000 $1.000 $0.050 $0.070 $0.150
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 31,727.000 $1.000 $0.100 $0.080 $0.150
MTL W-BEAM GD FEN (TIM POST)
LF 1,500.000 $30.000 $23.800 $20.010 $20.010
REMOVE METAL BEAM GUARD FENCE
LF 1,150.000 $3.000 $2.700 $2.260 $2.260
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,000.000 $2,987.000 $2,825.000 $2,825.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $300.000 $211.500 $311.000 $311.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 36.000 $600.000 $460.000 $492.000 $492.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $1,000.000 $777.200 $713.000 $713.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,200.000 $956.900 $984.000 $984.000
REMOVE SM RD SN SUP&AM
EA 40.000 $100.000 $100.500 $75.000 $75.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 31.000 $40.000 $37.000 $30.000 $30.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,166.000 $1.500 $1.700 $0.800 $1.000
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 63,919.000 $0.750 $0.400 $0.390 $0.550
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 5,800.000 $0.750 $0.400 $0.400 $0.550
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 20,365.000 $0.750 $0.400 $0.390 $0.550
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 36.000 $12.000 $13.200 $12.500 $22.360
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $300.000 $264.300 $250.000 $405.000
REFL PAV MRKR TY II-A-A
EA 558.000 $5.000 $4.300 $4.000 $5.000
D-GR HMA TY-D PG64-22 (LEVEL-UP)
TON 4,829.000 $120.000 $117.700 $127.000 $127.250
TACK COAT
GAL 3,219.000 $7.000 $4.900 $3.500 $4.000
SP MIXES SP-D SAC-A PG76-22
TON 17,313.000 $130.000 $120.700 $125.000 $126.380
TACK COAT
GAL 9,444.000 $7.000 $4.200 $3.500 $4.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $5,287.000 $8,000.000 $6,000.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 160.000 $20.000 $20.600 $19.500 $19.500
TMA (STATIONARY)
DAY 51.000 $350.000 $410.300 $270.000 $100.000
TMA (MOBILE OPERATION)
DAY 18.000 $350.000 $26.500 $600.000 $100.000
Totals: $4,406,503.000 $3,497,274.250 $3,603,163.570 $3,622,521.870