LIBERTY SH 105 (0338-12-011)

Items: 47

County: LIBERTY
Length: 3.1430 MILES
Highway: SH 105
District: BEAUMONT
Control Number: 0338-12-011
DBE Goal: 0.0%
Project: STP 2026(337)MM
Guaranty: $69,000.00
Time: 70 WORKING DAYS
Engineer's Estimate: $3,429,351.50
Date: 02/05/2026 (4 months ago)
Contract Number: 2263216
Type: SURFACING/ROADWAY RESTORATION
Project ID: A00188002
Contract Type: Federal
Project Description: SH 105-(US 59, EAST TO SH 321) FULL DEPTH BASE REPAIR, AND OVERLAY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
ROBERTO RODRIGUEZ
ROBERTO M RODRIGUEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$3,429,351.50
Over/Under Est: -18.93% -$649,208.33
Over/Under Est: -18.34% -$629,088.20
Amt Left: 0.72% $20,120.13
Over/Under Est: -14.92% -$511,577.30
Amt Left: 4.95% $137,631.03
Delta: -4.20% -$117,510.90
Over/Under Est: -12.99% -$445,536.62
Amt Left: 7.33% $203,671.71
Delta: -2.26% -$66,040.68
Over/Under Est: 9.99% $342,606.54
Amt Left: 35.67% $991,814.87
Delta: -26.41% -$788,143.16

Bid Items & Bid Tabulations

47 Total 0 of 47
LIBERTY  |  SH 105  |  BEAUMONT  |  0338-12-011  |  02/05/2026  |  $3,429,351.50  |  STP 2026(337)MM  |  SURF/ROADWAY RESTOR  |  70 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
ELITE KINGS CONSTRUCTION, LLC
DURWOOD GREENE CONSTRUCTION CO.
TEXAS MATERIALS GROUP, INC.
PROFESSIONAL TRAFFIC CONTROL LLC
REMOV CONC (MOWSTRIP)
LF 1,411.000 $16.000 $15.000 $1.000 $30.000 $18.750 $19.860
BACKFILL (TY A OR B)
STA 282.000 $30.000 $235.000 $50.000 $130.000 $304.500 $367.500
HYDRO MULCH SEED (PERM_RURAL_SANDY)
SY 31,382.000 $0.500 $0.410 $0.500 $0.500 $0.400 $0.500
HYDRO MULCH SEED (TEMP_WARM)
SY 31,382.000 $0.500 $0.350 $0.500 $0.150 $0.350 $0.410
VEGETATIVE WATERING
TGL 294.000 $30.000 $10.000 $0.100 $20.000 $45.500 $35.380
ASPH (AC-20-5TR OR AC-20XP)
GAL 42,278.000 $4.000 $3.050 $4.000 $2.550 $2.850 $7.000
AGGR (TY-PD OR PL, GR-4)
CY 904.000 $180.000 $171.300 $130.000 $165.000 $228.000 $165.000
SP MIXES SP-C SAC-A PG76-22
TON 12,918.000 $145.000 $128.800 $135.000 $140.000 $130.000 $162.000
TACK COAT
GAL 7,046.000 $3.500 $3.250 $4.000 $1.000 $3.500 $5.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 2,349.000 $150.000 $78.250 $80.000 $78.000 $105.000 $114.500
PLANE ASPH CONC PAV(0" TO 2")
SY 9,966.000 $1.500 $3.150 $5.500 $6.000 $4.250 $5.500
RIPRAP (MOW STRIP)(4 IN)
CY 80.000 $450.000 $675.000 $5.000 $1,100.000 $640.760 $700.000
MOBILIZATION
LS 1.000 $311,760.000 $115,000.000 $300,000.000 $70,000.000 $169,200.000 $30,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $7,000.000 $2,500.000 $1,000.000 $3,200.000 $1,012.390 $4,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $6,000.000 $10,000.000 $100.000 $5,500.000 $5,873.590 $1,000.000
TMA (STATIONARY)
DAY 70.000 $600.000 $75.000 $200.000 $300.000 $320.380 $300.000
TMA (MOBILE OPERATION)
DAY 32.000 $400.000 $75.000 $200.000 $250.000 $1.000 $500.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 31,640.000 $0.500 $0.100 $1.000 $0.240 $0.270 $4.610
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 15,820.000 $1.000 $0.100 $1.000 $0.240 $0.300 $5.040
MTL W-BEAM GD FEN (TIM POST)
LF 350.000 $28.000 $27.000 $6.000 $27.000 $27.750 $28.300
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 16.000 $2,100.000 $2,150.000 $5.000 $2,500.000 $1,762.000 $2,249.500
REMOVE METAL BEAM GUARD FENCE
LF 301.000 $4.000 $3.500 $1.000 $5.000 $3.500 $5.500
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 16.000 $260.000 $225.000 $3.000 $250.000 $267.000 $255.000
GUARDRAIL END TREATMENT (INSTALL)
EA 16.000 $3,200.000 $2,950.000 $100.000 $3,250.000 $3,043.500 $3,331.540
GUARDRAIL END TREATMENT (REMOVE)
EA 16.000 $300.000 $250.000 $1.000 $300.000 $267.000 $275.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 26.000 $710.000 $825.000 $4.000 $570.000 $614.000 $722.870
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 8.000 $810.000 $715.000 $4.000 $700.000 $694.000 $823.500
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 5.000 $1,005.000 $1,000.000 $4.000 $1,050.000 $1,137.000 $1,047.500
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $1,100.000 $1,350.000 $4.000 $1,150.000 $1,185.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 1.000 $1,200.000 $2,590.000 $4.000 $1,290.000 $1,228.000 $1,365.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 5.000 $1,350.000 $1,300.000 $4.000 $1,250.000 $1,206.750 $1,150.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2
EA 16.000 $3.000 $50.000 $4.000 $35.000 $37.500 $49.500
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2(BI)
EA 48.000 $40.000 $30.000 $4.000 $35.000 $37.500 $53.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,595.000 $0.500 $1.000 $1.000 $2.500 $3.750 $1.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 3,308.000 $1.750 $0.900 $2.000 $1.000 $1.000 $1.200
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 43,848.000 $0.750 $0.500 $0.650 $0.550 $0.550 $1.200
REFL PAV MRK TY I (Y)6"(BRK)(090MIL)
LF 760.000 $0.750 $0.500 $1.000 $0.680 $0.650 $2.020
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 43,198.000 $0.750 $0.500 $0.650 $0.550 $0.600 $1.210
PREFAB PM TY C (W)(12")(SLD)
LF 3,200.000 $7.000 $10.000 $1.000 $10.000 $3.470 $11.050
PREFAB PM TY C (W)(24")(SLD)
LF 72.000 $14.000 $15.000 $1.000 $15.000 $19.500 $28.130
PREFAB PM TY C (W)(ARROW)
EA 2.000 $220.000 $230.000 $200.000 $245.000 $304.000 $248.320
PREFAB PM TY C (W)(DBL ARROW)
EA 2.000 $300.000 $425.000 $200.000 $275.000 $320.000 $425.000
PREFAB PM TY C (W)(WORD)
EA 4.000 $275.000 $300.000 $350.000 $250.000 $374.000 $300.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 28.000 $55.000 $55.000 $1.000 $45.000 $43.000 $45.000
PREFAB PM TY C (Y)(24")(SLD)
LF 1,818.000 $17.000 $17.000 $1.000 $14.000 $14.500 $12.850
REFL PAV MRKR TY II-A-A
EA 798.000 $4.000 $5.500 $1.000 $6.000 $5.350 $6.000
REFL PAV MRKR TY II-C-R
EA 150.000 $4.250 $5.500 $1.000 $6.000 $5.350 $7.240
Totals: $3,429,351.500 $2,780,143.170 $2,800,263.300 $2,917,774.200 $2,983,814.880 $3,771,958.040
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
Total: $10,000.00