Show Job Controls
Bid Cobra

LEON FM 811 (1145-02-022)

Items: 88

County: LEON
Length: N/A
Highway: FM 811
District: BRYAN
Control Number: 1145-02-022
DBE Goal: N/A
Project: C 1145-2-22
Guaranty: N/A
Time: 278 WORKING DAYS
Engineer's Estimate: $10,021,113.85
Date: 11/05/2019 (6 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$10,021,113.85
$9,543,192.09
Over/Under Est: -4.77% -$477,921.76
Over/Under Est: 1.6% $160,824.63
Amt Left: 6.69% $638,746.39
$10,936,801.82
Over/Under Est: 9.14% $915,687.97
Amt Left: 14.6% $1,393,609.73
Delta: -7.41% -$754,863.34
Over/Under Est: 15.52% $1,555,044.73
Amt Left: 21.3% $2,032,966.49
Delta: -5.85% -$639,356.76
$13,202,571.60
Over/Under Est: 31.75% $3,181,457.75
Amt Left: 38.35% $3,659,379.51
Delta: -14.05% -$1,626,413.02

Bid Items & Bid Tabulations

88 Total 0 of 88
LEON  |  FM 811  |  BRYAN  |  1145-02-022  |  11/05/2019  |  $10,021,113.85  |  C 1145-2-22  |  REHAB EXIST ROADWAY  |  278 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
LARRY YOUNG PAVING, INC.
A. L. HELMCAMP, INC.
BIG CREEK CONSTRUCTION, LTD.
TRIPLE B SERVICES LLP
PREPARING ROW
STA 665.000 $500.000 $383.000 $273.890 $1,010.000 $800.000 $1,100.000
EXCAVATION (ROADWAY)
CY 50,892.000 $11.000 $8.230 $12.540 $8.000 $10.000 $13.500
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 13,971.000 $10.000 $7.000 $12.320 $5.000 $10.000 $36.000
FURNISHING AND PLACING TOPSOIL (4")
SY 215,709.000 $0.750 $0.660 $0.850 $0.600 $0.600 $0.600
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 215,709.000 $0.270 $0.340 $0.320 $0.330 $0.320 $0.300
CELL FBR MLCH SEED(TEMP)(WARM)
SY 107,855.000 $0.250 $0.320 $0.300 $0.310 $0.280 $0.300
CELL FBR MLCH SEED(TEMP)(COOL)
SY 107,855.000 $0.250 $0.320 $0.300 $0.310 $0.280 $0.300
VEGETATIVE WATERING
MG 4,329.000 $10.000 $12.000 $17.390 $5.000 $5.000 $7.000
SOIL RETENTION BLANKETS (CL 2) (TY F)
SY 2,288.000 $2.150 $2.940 $2.750 $3.000 $2.250 $1.900
FL BS (COMP IN PLC)(TY A OR B GR 2)(8")
SY 207,011.000 $9.000 $11.400 $11.060 $12.000 $14.500 $14.500
REWORK BS MTL (TY B) (8") (ORD COMP)
SY 142,659.000 $1.100 $1.480 $2.010 $1.400 $2.750 $3.000
LIME (HYDRATED LIME (DRY))
TON 835.000 $110.000 $157.000 $172.880 $160.000 $155.000 $220.000
LIME TRT (EXST MATL) (12")
SY 46,372.000 $3.000 $3.400 $2.930 $3.400 $2.500 $5.000
CEMENT
TON 4,259.000 $140.000 $156.000 $174.470 $156.000 $150.000 $170.000
CEMENT TREAT (EXIST MATL)(12")
SY 236,584.000 $1.500 $1.000 $2.020 $2.200 $2.000 $2.000
ASPH (AC-20-5TR)
GAL 157,328.000 $3.500 $3.000 $3.020 $3.200 $3.000 $3.300
ASPH (HFRS-2P)
GAL 66,244.000 $3.800 $3.200 $3.090 $3.200 $3.500 $3.350
AGGR(TY-PB GR-3 SAC-B)
CY 1,801.000 $107.000 $133.000 $119.940 $150.000 $115.000 $119.000
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 1,753.000 $98.000 $112.000 $84.000 $150.000 $90.000 $94.000
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
CY 1,656.000 $105.000 $132.000 $109.000 $125.000 $115.000 $130.000
CEM STABIL BKFL
CY 792.000 $165.000 $100.000 $85.480 $125.000 $150.000 $65.000
CUT & RESTORING PAV
SY 817.000 $150.000 $12.000 $87.940 $35.000 $55.000 $140.000
TRENCH EXCAVATION PROTECTION
LF 723.000 $12.000 $13.250 $2.220 $11.000 $5.000 $1.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 258.000 $95.000 $134.000 $133.910 $188.000 $90.000 $200.000
RIPRAP (MOW STRIP)(4 IN)
CY 230.000 $475.000 $429.000 $533.640 $540.000 $500.000 $300.000
CONC BOX CULV (3 FT X 2 FT)
LF 80.000 $160.000 $211.000 $232.620 $245.000 $280.000 $280.000
CONC BOX CULV (4 FT X 2 FT)
LF 76.000 $500.000 $228.000 $245.890 $265.000 $300.000 $308.000
RC PIPE (CL III)(18 IN)
LF 6,431.000 $60.000 $54.000 $45.160 $63.000 $60.000 $85.000
RC PIPE (CL III)(24 IN)
LF 550.000 $75.000 $65.000 $53.540 $77.000 $80.000 $115.000
RC PIPE (CL III)(30 IN)
LF 243.000 $115.000 $90.000 $77.520 $110.000 $130.000 $150.000
RC PIPE (CL III)(36 IN)
LF 186.000 $135.000 $120.000 $98.780 $130.000 $140.000 $195.000
RC PIPE (CL III)(42 IN)
LF 129.000 $280.000 $145.000 $131.330 $160.000 $225.000 $225.000
RC PIPE (CL III)(60 IN)
LF 125.000 $250.000 $300.000 $268.650 $360.000 $360.000 $373.000
RC PIPE (CL IV)(18 IN)
LF 331.000 $85.000 $58.000 $51.440 $74.000 $90.000 $95.000
RC PIPE (CL IV)(24 IN)
LF 646.000 $73.400 $82.000 $61.920 $100.000 $100.000 $115.000
RC PIPE (CL IV)(36 IN)
LF 306.000 $243.800 $145.000 $111.990 $160.000 $165.000 $205.000
RC PIPE (CL IV)(42 IN)
LF 241.000 $200.000 $180.000 $147.660 $200.000 $220.000 $250.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 1.000 $4,000.000 $6,600.000 $4,500.000 $7,500.000 $5,500.000 $5,500.000
HEADWALL (CH - PW - 0) (DIA= 60 IN)
EA 6.000 $9,500.000 $15,000.000 $14,000.000 $15,000.000 $15,000.000 $9,000.000
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
EA 2.000 $4,894.810 $5,300.000 $8,500.000 $5,800.000 $4,500.000 $2,500.000
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
EA 2.000 $5,315.000 $5,400.000 $9,500.000 $5,800.000 $6,500.000 $2,600.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
EA 4.000 $3,500.000 $5,650.000 $11,000.000 $5,900.000 $3,200.000 $3,100.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 16.000 $750.000 $600.000 $843.400 $750.000 $700.000 $1,100.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 194.000 $900.000 $725.000 $1,022.260 $850.000 $1,000.000 $1,275.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 31.000 $1,000.000 $750.000 $1,049.310 $900.000 $800.000 $1,200.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 16.000 $1,200.000 $1,000.000 $1,291.200 $950.000 $1,200.000 $1,400.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 8.000 $1,500.000 $1,350.000 $1,479.240 $1,200.000 $1,500.000 $1,600.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 14.000 $2,500.000 $2,350.000 $2,459.430 $2,500.000 $2,200.000 $1,900.000
SET (TY II) (42 IN) (RCP) (3: 1) (C)
EA 16.000 $3,000.000 $3,100.000 $3,296.240 $3,500.000 $2,800.000 $2,200.000
REMOV STR (SET)
EA 10.000 $250.000 $300.000 $550.000 $185.000 $350.000 $400.000
REMOV STR (PIPE)
EA 118.000 $500.000 $310.000 $350.000 $800.000 $400.000 $800.000
MOBILIZATION
LS 1.000 $994,229.200 $376,700.000 $398,555.670 $900,000.000 $1,050,000.000 $950,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 19.000 $2,500.000 $9,630.000 $17,079.550 $7,000.000 $5,000.000 $12,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 5,640.000 $25.000 $26.740 $25.000 $26.000 $26.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 5,640.000 $5.000 $9.500 $9.000 $9.000 $5.000 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 12,094.000 $3.000 $2.500 $2.350 $2.500 $2.500 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 12,094.000 $0.500 $0.800 $0.750 $0.800 $0.500 $1.000
CONC CURB (RIBBON)
LF 338.000 $35.000 $53.000 $55.200 $50.000 $50.000 $8.000
INTERSECTIONS (ACP)
SY 658.000 $24.000 $43.250 $55.850 $44.000 $35.000 $43.000
TURNOUTS (SURF TREAT)
SY 1,099.000 $136.000 $45.350 $23.590 $24.000 $23.000 $35.000
DRIVEWAYS AND TURNOUTS (SURF TREAT)
SY 12,714.000 $20.000 $34.000 $31.440 $29.000 $30.000 $35.000
MTL W-BEAM GD FEN (TIM POST)
LF 3,275.000 $25.000 $18.000 $19.500 $18.000 $24.000 $24.000
MTL BEAM GD FEN TRANS (T101)
EA 8.000 $900.000 $1,400.000 $990.000 $1,100.000 $1,100.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 800.000 $3.000 $4.250 $1.750 $4.500 $4.000 $6.500
REMOVE TERMINAL ANCHOR SECTION
EA 8.000 $175.000 $400.000 $150.000 $380.000 $150.000 $1,600.000
GUARDRAIL END TREATMENT (INSTALL)
EA 24.000 $2,600.000 $2,620.000 $2,475.000 $2,600.000 $2,900.000 $2,600.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 43.000 $150.000 $123.000 $124.490 $125.000 $200.000 $130.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 3.000 $270.000 $166.000 $167.790 $165.000 $250.000 $165.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 8.000 $500.000 $500.000 $487.130 $475.000 $600.000 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 128.000 $350.000 $380.000 $384.290 $375.000 $500.000 $400.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $450.000 $423.000 $427.590 $420.000 $550.000 $400.000
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 1.000 $800.000 $840.000 $849.760 $830.000 $850.000 $800.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $700.000 $800.000 $736.100 $720.000 $700.000 $750.000
REMOVE SM RD SN SUP&AM
EA 131.000 $50.000 $48.000 $48.710 $50.000 $90.000 $50.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 74.000 $65.000 $59.000 $59.540 $60.000 $65.000 $62.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 28.000 $45.000 $35.000 $30.310 $30.000 $32.000 $30.000
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 6,390.000 $0.890 $1.070 $1.000 $0.200 $1.100 $1.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 107,135.000 $2.000 $0.750 $0.700 $0.200 $0.750 $0.750
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 13,390.000 $1.000 $1.000 $0.030 $0.650 $1.000 $0.600
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 251.000 $9.000 $6.420 $15.000 $6.500 $6.200 $6.500
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 134,290.000 $0.650 $0.640 $0.700 $0.650 $0.620 $0.650
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 5,580.000 $0.900 $1.070 $0.740 $1.100 $1.200 $1.100
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 106,325.000 $0.650 $0.640 $0.700 $0.650 $0.620 $0.650
REFL PAV MRKR TY II-A-A
EA 1,598.000 $4.000 $3.640 $3.850 $3.600 $3.500 $3.750
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $10,000.000 $6,400.000 $13,488.660 $5,000.000 $10,000.000 $30,000.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 90.000 $15.000 $21.390 $15.000 $22.000 $25.000 $60.000
TMA (STATIONARY)
DAY 304.000 $194.000 $270.000 $152.160 $200.000 $200.000 $165.000
TMA (MOBILE OPERATION)
DAY 42.000 $175.000 $500.000 $152.160 $55.000 $500.000 $200.000
Totals: $10,021,113.850 $9,543,192.090 $10,181,938.480 $10,936,801.820 $11,576,158.580 $13,202,571.600