Show Job Controls
Bid Cobra

LEON FM 1511 (1145-01-044)

Items: 74

County: LEON
Length: N/A
Highway: FM 1511
District: BRYAN
Control Number: 1145-01-044
DBE Goal: N/A
Project: BR 1902(019)
Guaranty: N/A
Time: 320 WORKING DAYS
Engineer's Estimate: $2,034,217.02
Date: 06/05/2019 (7 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$2,034,217.02
$2,035,077.89
Over/Under Est: 0.04% $860.87
Over/Under Est: 2.19% $44,594.43
Amt Left: 2.15% $43,733.56
Over/Under Est: 4.48% $91,132.90
Amt Left: 4.44% $90,272.03
Delta: -2.24% -$46,538.47
$2,287,178.30
Over/Under Est: 12.44% $252,961.28
Amt Left: 12.39% $252,100.41
Delta: -7.61% -$161,828.38
Over/Under Est: 18.05% $367,089.53
Amt Left: 18% $366,228.66
Delta: -4.99% -$114,128.25
Over/Under Est: 60.31% $1,226,881.22
Amt Left: 60.24% $1,226,020.35
Delta: -35.81% -$859,791.69

Bid Items & Bid Tabulations

74 Total 0 of 74
LEON  |  FM 1511  |  BRYAN  |  1145-01-044  |  06/05/2019  |  $2,034,217.02  |  BR 1902(019)  |  BRIDGE REPL  |  320 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PIERCE R & B LLC
KNIFE RIVER CORPORATION - SOUTH
PROJECT ALLIED RESOURCES, LLC
A. L. HELMCAMP, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
FUQUA CONSTRUCTION CO., INC.
PREPARING ROW
STA 14.200 $2,200.000 $2,100.000 $1,650.000 $1,970.000 $1,600.000 $3,000.000 $1,400.000
EXCAVATION (ROADWAY)
CY 1,577.000 $11.000 $12.000 $15.000 $13.600 $16.000 $14.000 $25.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 1,819.000 $14.000 $18.000 $22.000 $21.800 $15.000 $14.500 $25.000
FURNISHING AND PLACING TOPSOIL (4")
SY 3,832.000 $1.250 $2.500 $1.000 $2.010 $2.500 $5.000 $1.250
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 3,832.000 $1.000 $0.960 $1.500 $1.780 $1.250 $1.650 $0.810
CELL FBR MLCH SEED(TEMP)(WARM)
SY 1,917.000 $1.000 $0.960 $1.500 $0.260 $1.250 $1.650 $1.350
CELL FBR MLCH SEED(TEMP)(COOL)
SY 1,917.000 $1.000 $0.950 $1.500 $0.270 $1.250 $1.650 $1.350
VEGETATIVE WATERING
MG 38.300 $12.500 $45.000 $50.000 $5.700 $25.000 $10.000 $56.000
FL BS (CMP IN PLC)(TY-D GR-1-2)(7")
SY 4,703.000 $12.000 $16.000 $14.000 $15.600 $24.000 $21.500 $44.000
CEMENT
TON 57.000 $170.000 $200.000 $200.000 $140.000 $175.000 $200.000 $200.000
CEMENT TREAT (EXIST MATL) (DC) (9")
SY 5,102.000 $8.000 $4.650 $4.000 $3.680 $5.000 $3.000 $32.000
ASPH (RC-250)
GAL 1,099.000 $3.850 $10.000 $5.500 $10.500 $7.000 $10.750 $15.000
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 32.000 $90.000 $600.000 $310.000 $315.000 $600.000 $575.000 $400.000
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
CY 70.000 $125.000 $500.000 $300.000 $420.000 $600.000 $350.000 $400.000
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 3,690.000 $3.700 $10.000 $4.250 $10.500 $6.000 $6.000 $15.000
CEM STABIL BKFL
CY 151.000 $100.000 $200.000 $200.000 $167.000 $110.000 $300.000 $222.000
TEMPORARY SPL SHORING
SF 1,037.000 $12.000 $40.000 $25.000 $9.800 $35.000 $46.000 $46.000
DRILL SHAFT (24 IN)
LF 630.000 $200.000 $194.000 $200.000 $168.000 $175.000 $200.000 $325.085
DRILL SHAFT (30 IN)
LF 350.000 $190.000 $269.000 $225.000 $254.000 $250.000 $305.000 $356.548
CL C CONC (ABUT)
CY 57.600 $1,400.000 $1,050.000 $1,600.000 $1,130.000 $1,800.000 $1,150.000 $2,200.000
CL C CONC (CAP)
CY 19.000 $1,500.000 $1,250.000 $2,000.000 $1,510.000 $1,800.000 $1,150.000 $2,200.000
CL C CONC (COLUMN)
CY 9.400 $1,400.000 $1,500.000 $2,000.000 $1,340.000 $1,800.000 $1,950.000 $2,200.000
REINF CONC SLAB (BOX BEAM)
SF 2,611.000 $16.000 $16.000 $22.000 $18.500 $22.000 $20.000 $26.000
REINF CONC SLAB (SLAB BEAM)
SF 2,875.000 $22.000 $17.000 $23.000 $21.300 $22.000 $20.000 $26.000
APPROACH SLAB
CY 119.600 $640.000 $575.000 $587.000 $631.000 $850.000 $500.000 $660.000
SHEAR KEY
CY 11.200 $380.000 $425.000 $400.000 $478.000 $1,000.000 $565.000 $670.000
PRESTR CONC BOX BEAM (5B20)
LF 516.000 $200.000 $187.000 $210.000 $188.000 $178.000 $200.000 $282.470
PRESTR CONC SLAB BEAM (4SB12)
LF 147.000 $210.000 $174.000 $210.000 $156.000 $265.000 $150.000 $282.470
PRESTR CONC SLAB BEAM (5SB12)
LF 441.000 $255.000 $182.000 $210.000 $156.000 $190.000 $150.000 $236.548
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,250.000 $160.000 $110.000 $89.000 $141.000 $75.000 $160.000 $145.000
RIPRAP (MOW STRIP)(4 IN)
CY 41.000 $400.000 $450.000 $490.000 $563.000 $700.000 $650.000 $500.000
RAIL (TY T223)
LF 336.000 $110.000 $108.000 $122.000 $135.000 $220.000 $85.000 $95.000
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 154.000 $105.000 $90.000 $95.000 $105.000 $50.000 $100.000 $95.000
RC PIPE (CL III)(18 IN)
LF 42.000 $55.000 $99.000 $105.000 $66.000 $64.000 $100.000 $80.000
RC PIPE (CL III)(36 IN)
LF 19.000 $160.000 $113.000 $250.000 $160.000 $160.000 $150.000 $180.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 2.000 $1,500.000 $1,000.000 $995.000 $1,210.000 $750.000 $750.000 $1,500.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $2,400.000 $2,500.000 $2,000.000 $3,300.000 $1,600.000 $2,000.000 $2,450.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $20,000.000 $20,000.000 $28,500.000 $26,100.000 $25,000.000 $35,000.000 $41,000.000
MOBILIZATION
LS 1.000 $150,000.000 $200,000.000 $200,000.000 $148,000.000 $200,000.000 $175,000.000 $386,461.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 21.000 $7,500.000 $2,000.000 $600.000 $903.000 $4,000.000 $5,000.000 $1,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 80.000 $28.000 $38.000 $41.000 $54.000 $36.000 $42.000 $65.000
ROCK FILTER DAMS (REMOVE)
LF 80.000 $8.000 $9.000 $15.000 $14.800 $12.000 $16.500 $65.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 624.000 $20.000 $35.000 $10.000 $20.700 $20.000 $20.000 $28.000
CONSTRUCTION EXITS (REMOVE)
SY 624.000 $8.000 $9.000 $3.000 $6.400 $10.000 $10.000 $28.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,025.000 $2.500 $4.000 $4.000 $4.420 $3.000 $3.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,025.000 $0.600 $1.000 $1.000 $1.120 $1.000 $1.100 $2.000
CONSTRUCTING DETOURS
SY 551.000 $53.110 $100.000 $65.000 $79.000 $125.000 $75.000 $110.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 18.000 $4,200.000 $3,000.000 $4,000.000 $2,420.000 $6,500.000 $8,000.000 $15,000.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,530.000 $50.000 $44.000 $99.000 $168.000 $50.000 $105.000 $42.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 1,230.000 $8.000 $6.000 $10.000 $5.600 $14.000 $18.000 $39.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 1,530.000 $11.000 $10.000 $15.000 $8.900 $12.000 $12.000 $15.000
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 288.000 $0.250 $34.300 $22.000 $22.000 $16.000 $16.000 $44.000
MTL W-BEAM GD FEN (TIM POST)
LF 200.000 $20.000 $21.500 $22.000 $25.900 $22.000 $22.000 $28.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,950.000 $1,490.000 $2,200.000 $1,760.000 $1,700.000 $1,500.000 $2,100.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,700.000 $2,819.000 $2,800.000 $2,810.000 $2,900.000 $2,500.000 $2,800.000
CRASH CUSH ATTEN (INSTL)
EA 6.000 $11,000.000 $13,200.000 $12,500.000 $13,300.000 $13,000.000 $13,750.000 $14,888.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $1,700.000 $2,665.000 $2,000.000 $1,860.000 $2,200.000 $2,750.000 $1,900.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $1,500.000 $1,070.000 $750.000 $1,060.000 $1,400.000 $1,100.000 $1,200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $640.000 $750.000 $600.000 $574.000 $530.000 $525.000 $600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $500.000 $800.000 $700.000 $664.000 $610.000 $605.000 $477.000
REMOVE SM RD SN SUP&AM
EA 4.000 $90.000 $250.000 $75.000 $105.000 $85.000 $85.000 $125.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 4.000 $140.000 $65.000 $44.000 $72.000 $25.000 $50.000 $66.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $17.000 $30.000 $23.000 $33.000 $25.000 $16.500 $36.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 8.000 $21.000 $30.000 $23.000 $33.000 $25.000 $22.000 $36.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 4.000 $87.000 $65.000 $108.000 $77.000 $75.000 $50.000 $70.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 6,704.000 $0.700 $1.300 $1.000 $1.310 $1.400 $1.400 $2.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 48.000 $7.050 $12.000 $54.000 $10.500 $12.000 $11.000 $68.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 14,400.000 $0.900 $1.300 $0.600 $1.310 $1.400 $1.400 $0.750
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 209.000 $0.690 $5.600 $1.500 $1.080 $0.600 $1.200 $2.000
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
LF 2,800.000 $0.380 $5.300 $0.800 $5.300 $5.500 $5.500 $1.550
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
LF 2,800.000 $0.380 $5.300 $2.850 $5.300 $5.500 $5.500 $2.880
REFL PAV MRKR TY II-A-A
EA 360.000 $2.610 $5.500 $7.500 $5.300 $5.500 $5.500 $18.000
TRAFFIC BUTTON TY II-A-A
EA 35.000 $3.400 $7.300 $3.250 $5.300 $5.500 $5.500 $9.000
ELIM EXT PAV MRK & MRKS (4")
LF 18,530.000 $0.900 $0.380 $0.700 $0.370 $0.360 $0.400 $1.000
Totals: $2,034,217.020 $2,035,077.890 $2,078,811.450 $2,125,349.920 $2,287,178.300 $2,401,306.550 $3,261,098.248