Show Job Controls
Bid Cobra

LEON SH 7 (0335-01-040)

Items: 103

County: LEON
Length: 20.1330 MILES
Highway: SH 7
District: BRYAN
Control Number: 0335-01-040
DBE Goal: 6.0%
Project: F 2025(889)
Guaranty: $100,000.00
Time: 476 WORKING DAYS
Engineer's Estimate: $24,159,203.26
Date: 08/08/2025 (10 months ago) Changed
Contract Number: 7253204
Type: WIDEN ROAD - ADD LANES
Project ID: A00127561
Contract Type: Federal
Project Description: WIDEN TO SUPER 2 HIGHWAY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
DELMY REYES
MATT HENSARLING
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$24,159,203.26
$21,287,952.83
Over/Under Est: -11.88% -$2,871,250.43
Over/Under Est: -3.08% -$744,821.21
Amt Left: 9.99% $2,126,429.22
$25,472,895.26
Over/Under Est: 5.44% $1,313,692.00
Amt Left: 19.66% $4,184,942.43
Delta: -8.79% -$2,058,513.21
Over/Under Est: 22.22% $5,367,400.68
Amt Left: 38.7% $8,238,651.11
Delta: -15.91% -$4,053,708.68
Subcontractor Percentage Amount
BAHENA CONSTRUCTION CO., INC. 6.82% $1,462,686.95
4E TREE WORX LLC 2.18% $467,545.10
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 1.94% $416,072.24
STRIPING TECHNOLOGY, L.P. 1.66% $356,020.58
DUSTIN ALLEN, INC. 0.73% $156,563.27
HOGAN MURRAY, INC. 0.65% $139,405.65
INTERSTATE BARRICADES & MARKINGS, INC. 0.32% $68,630.47
SURFACE PREPARATION TECHNOLOGIES, LLC 0.26% $55,762.26
Total: 14.56% $3,122,686.52

Bid Items & Bid Tabulations

103 Total 0 of 103
LEON  |  SH 7  |  BRYAN  |  0335-01-040  |  08/08/2025  |  $24,159,203.26  |  F 2025(889)  |  WIDEN ROAD - ADD LANES  |  476 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
A. L. HELMCAMP, INC.
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC
PREPARING ROW
STA 753.000 $1,000.000 $2,000.000 $2,400.000 $2,200.000 $2,210.000
REMOV CONC (RIPRAP)
CY 86.000 $90.000 $50.000 $125.000 $200.000 $77.420
REMOV CONC (DRIVEWAYS)
SY 120.000 $30.000 $20.000 $12.000 $45.000 $40.000
RMV (6") TRT/UNTRT BASE & ASPH PAV
SY 39,399.000 $9.000 $5.000 $4.750 $5.000 $3.950
EXCAV (ROADWAY)
CY 71,957.000 $15.000 $15.000 $16.000 $16.000 $15.230
EMBANK (FNL)(DC)(TY C)
CY 14,374.000 $20.000 $15.000 $5.000 $8.000 $44.060
FURN & PLACE TOPSOIL (4")
SY 113,161.000 $1.000 $1.000 $0.500 $1.250 $3.160
HYDRO MULCH SEED (PERM_RURAL_SANDY)
SY 113,161.000 $0.650 $0.400 $0.400 $0.410 $0.400
HYDRO MULCH SEED (TEMP_WARM)
SY 56,581.000 $0.700 $0.490 $0.450 $0.400 $0.390
HYDRO MULCH SEED (TEMP_COOL)
SY 56,581.000 $0.700 $0.490 $0.450 $0.400 $0.390
VEGETATIVE WATERING
TGL 1,132.000 $25.000 $20.000 $30.000 $33.000 $164.180
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 113,161.000 $2.000 $0.800 $0.650 $0.750 $0.690
FL BS (CMP IN PLC)(TY A GR 1-2) (6")
SY 120,339.000 $15.000 $14.000 $12.500 $14.000 $22.930
CEMENT
TON 1,492.000 $266.000 $210.000 $200.000 $240.000 $215.000
CEMENT TRT (EXIST MATL)(10")
SY 120,339.000 $4.000 $3.000 $1.000 $2.300 $3.710
PRIME COAT (MC-30)
GAL 22,093.000 $8.500 $5.000 $5.000 $5.600 $6.080
SP MIXES SP-C PG64-22
TON 16,433.000 $125.000 $95.000 $122.000 $126.000 $126.740
SP MIXES SP-C SAC-A PG70-22
TON 63,560.000 $119.000 $110.000 $141.000 $146.000 $143.960
PLANE ASPH CONC PAV(2")
SY 362,382.000 $2.000 $1.500 $1.750 $2.600 $3.200
TEMPORARY SPL SHORING
SF 2,180.000 $55.000 $34.000 $63.000 $84.000 $35.000
CL C CONC (RAIL FOUNDATION)
CY 130.000 $1,100.000 $650.000 $760.000 $1,200.000 $1,000.000
RETAINING WALL (CAST-IN-PLACE)
SF 4,839.000 $90.000 $130.000 $81.000 $120.000 $165.000
RIPRAP (CONC)(4 IN)
CY 354.000 $900.000 $770.000 $820.000 $740.000 $750.000
RIPRAP (MOW STRIP)(4 IN)
CY 254.000 $640.000 $770.000 $830.000 $740.000 $800.000
RAIL (TY SSTR)
LF 810.000 $110.000 $120.000 $151.000 $220.000 $94.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 7.000 $800.000 $1,000.000 $4,700.000 $950.000 $850.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 24.000 $1,300.000 $1,200.000 $2,550.000 $1,200.000 $750.000
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
LF 52.000 $1,100.000 $1,500.000 $2,100.000 $1,500.000 $1,000.000
RC PIPE (CL III)(18 IN)
LF 2,640.000 $100.000 $60.000 $60.000 $53.000 $60.000
RC PIPE (CL III)(24 IN)
LF 1,345.000 $100.000 $95.000 $80.000 $90.000 $140.000
RC PIPE (CL III)(36 IN)
LF 76.000 $250.000 $180.000 $170.000 $170.000 $250.000
RC PIPE (CL III)(48 IN)
LF 8.000 $300.000 $300.000 $238.000 $260.000 $450.000
RC PIPE (CL IV)(18 IN)
LF 6.000 $130.000 $100.000 $114.000 $65.000 $68.000
RC PIPE (CL IV)(24 IN)
LF 20.000 $150.000 $125.000 $136.000 $100.000 $185.000
RC PIPE (CL IV)(36 IN)
LF 20.000 $270.000 $250.000 $197.000 $220.000 $300.000
HEADWALL (CH - PW - 0) (DIA= 18 IN)
EA 2.000 $10,000.000 $5,500.000 $20,200.000 $5,300.000 $4,000.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 7.000 $10,000.000 $7,000.000 $21,100.000 $6,900.000 $5,500.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 3.000 $16,000.000 $12,000.000 $22,400.000 $12,000.000 $10,500.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 1.000 $23,000.000 $15,000.000 $26,000.000 $15,000.000 $15,000.000
HEADWALL (CH - PW - S) (DIA= 30 IN)
EA 1.000 $9,500.000 $11,000.000 $21,870.000 $11,000.000 $7,500.000
WINGWALL (FW - 0) (HW=4 FT)
EA 1.000 $13,000.000 $22,000.000 $23,900.000 $15,000.000 $15,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $28,000.000 $33,000.000 $26,000.000 $23,000.000 $19,000.000
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $43,000.000 $60,000.000 $42,600.000 $47,000.000 $55,000.000
HEADWALL (CH-PW-S) (DIA 42 IN) (MOD)
EA 1.000 $15,000.000 $20,000.000 $2,450.000 $16,000.000 $15,000.000
HEADWALL (CH-PW-0)(DIA=36 IN)(MOD)
EA 1.000 $15,000.000 $19,000.000 $4,200.000 $15,000.000 $14,000.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 6.000 $1,450.000 $850.000 $1,475.000 $780.000 $800.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 138.000 $1,600.000 $900.000 $1,410.000 $850.000 $900.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 8.000 $2,100.000 $1,300.000 $2,000.000 $1,300.000 $2,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 68.000 $2,500.000 $1,500.000 $1,885.000 $1,500.000 $2,500.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $4,000.000 $5,500.000 $4,540.000 $5,300.000 $4,000.000
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 2.000 $6,000.000 $8,000.000 $6,100.000 $7,900.000 $5,000.000
CLEAN EXIST CULVERTS
EA 7.000 $4,000.000 $2,000.000 $8,330.000 $1,300.000 $1,500.000
REMOV STR (SET)
EA 183.000 $600.000 $300.000 $540.000 $110.000 $550.000
REMOV STR (WINGWALL)
EA 1.000 $3,100.000 $2,000.000 $2,620.000 $1,100.000 $1,200.000
REMOV STR (HEADWALL)
EA 16.000 $3,000.000 $2,000.000 $2,000.000 $1,100.000 $1,200.000
REMOV STR (PIPE)
LF 3,605.000 $30.000 $14.000 $14.000 $11.000 $30.000
REMOV STR (BOX CULVERT)
LF 18.000 $300.000 $200.000 $1,300.000 $80.000 $450.000
MOBILIZATION
LS 1.000 $2,196,291.210 $2,000,000.000 $699,861.000 $2,400,000.000 $2,975,355.810
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 30.000 $17,000.000 $3,000.000 $13,700.000 $11,940.000 $48,060.880
PORTABLE CHANGEABLE MESSAGE SIGN
EA 16.000 $10,000.000 $5,000.000 $3,000.000 $10,000.000 $1,000.000
TMA (MOBILE OPERATION)
HR 560.000 $50.000 $80.000 $1,000.000 $60.000 $65.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 2,240.000 $50.000 $40.000 $38.000 $40.000 $38.000
ROCK FILTER DAMS (REMOVE)
LF 2,240.000 $15.000 $5.000 $15.500 $11.000 $11.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 297.000 $30.000 $35.000 $34.000 $37.000 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 297.000 $10.000 $6.000 $13.500 $12.000 $11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 21,790.000 $5.000 $4.000 $3.950 $4.300 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 21,790.000 $1.500 $1.000 $1.000 $0.300 $0.190
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,300.000 $6.000 $7.000 $6.850 $5.500 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,300.000 $1.500 $1.000 $1.000 $1.000 $1.000
CONC CURB (RIBBON)
LF 152.000 $40.000 $35.000 $100.000 $60.000 $100.000
DRIVEWAYS (CONC)
SY 95.000 $120.000 $135.000 $170.000 $130.000 $250.000
DRIVEWAYS (ACP)
SY 4,939.000 $70.000 $55.000 $105.000 $70.000 $92.930
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 197,580.000 $0.500 $0.250 $0.100 $0.280 $0.060
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 98,790.000 $0.500 $0.250 $0.100 $0.280 $0.070
MTL W-BEAM GD FEN (TIM POST)
LF 3,950.000 $32.000 $25.000 $20.000 $22.000 $25.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 6.000 $2,400.000 $2,000.000 $1,500.000 $1,600.000 $2,150.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 12.000 $1,600.000 $1,500.000 $1,190.000 $1,300.000 $1,665.000
REMOVE METAL BEAM GUARD FENCE
LF 2,828.000 $9.000 $3.000 $2.000 $2.200 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 16.000 $3,000.000 $3,000.000 $2,800.000 $3,000.000 $3,065.000
GUARDRAIL END TREATMENT (REMOVE)
EA 16.000 $300.000 $250.000 $200.000 $220.000 $250.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 42.000 $245.000 $200.000 $300.000 $160.000 $285.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 159.000 $500.000 $700.000 $500.000 $640.000 $525.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $1,100.000 $800.000 $585.000 $790.000 $615.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 7.000 $850.000 $1,000.000 $825.000 $950.000 $915.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 6.000 $700.000 $1,200.000 $850.000 $1,200.000 $875.000
REMOVE SM RD SN SUP&AM
EA 176.000 $110.000 $120.000 $75.000 $110.000 $115.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 26.000 $35.000 $30.000 $18.000 $25.000 $35.500
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
EA 27.000 $80.000 $100.000 $75.000 $40.000 $185.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 24,705.000 $1.500 $0.250 $0.200 $0.220 $0.330
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 159,610.000 $1.000 $0.200 $0.180 $0.200 $0.310
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 7,478.000 $1.000 $1.500 $1.000 $1.000 $1.500
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 3,465.000 $3.000 $1.300 $1.200 $1.250 $0.820
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 14,390.000 $1.700 $1.050 $0.950 $1.000 $0.950
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 92.000 $13.000 $10.000 $7.000 $7.500 $6.980
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 14,795.000 $1.000 $0.820 $0.750 $0.800 $0.820
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 196,420.000 $1.000 $0.700 $0.600 $0.650 $0.680
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 227,948.000 $1.000 $0.700 $0.600 $0.650 $0.680
PREFAB PM TY C (W)(ARROW)
EA 16.000 $240.000 $300.000 $215.000 $230.000 $225.000
PREFAB PM TY C (W)(LN REDUCT ARROW)
EA 14.000 $350.000 $350.000 $275.000 $290.000 $315.000
PREFAB PM TY C (W)(WORD)
EA 14.000 $300.000 $325.000 $235.000 $250.000 $235.000
REFL PAV MRKR TY I-C
EA 1,320.000 $6.000 $6.000 $5.000 $5.500 $6.080
REFL PAV MRKR TY II-A-A
EA 6,246.000 $7.000 $5.000 $4.000 $4.300 $6.080
BONDING COURSE
GAL 63,884.000 $4.000 $4.000 $4.250 $4.800 $5.600
Totals: $24,159,203.260 $21,287,952.830 $23,414,382.050 $25,472,895.260 $29,526,603.940
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $15,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $219,629.12
Total: $234,629.12