Show Job Controls
Bid Cobra

LAVACA UA 90 (0446-01-050)

Items: 86

County: LAVACA
Length: N/A
Highway: UA 90
District: YOAKUM
Control Number: 0446-01-050
DBE Goal: 700.0%
Project: BR 2024(508)
Guaranty: N/A
Time: 349 WORKING DAYS
Engineer's Estimate: $11,635,484.10
Date: 03/05/2024 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
COVEY MORROW
CHASE HERMES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$11,635,484.10
$10,488,202.65
Over/Under Est: -9.86% -$1,147,281.45
Over/Under Est: -1.94% -$225,397.21
Amt Left: 8.79% $921,884.24
Over/Under Est: 8.29% $964,309.06
Amt Left: 20.13% $2,111,590.51
Delta: -10.43% -$1,189,706.27
$12,888,684.14
Over/Under Est: 10.77% $1,253,200.04
Amt Left: 22.89% $2,400,481.49
Delta: -2.29% -$288,890.98
Subcontractor Percentage Amount
ZENITH SITE SERVICES 10.79% $1,131,677.07
M & D FOUNDATION DRILLING INDUSTRIES, INC. 10.57% $1,108,603.02
LONE STAR PAVING COMPANY 8.78% $920,864.19
CND CONTRACTING, LLC 1.53% $160,469.50
AARON CONCRETE CONTRACTORS, LLC 1.35% $141,590.74
A K FUQUAY CONSTRUCTION 0.73% $76,563.88
LONE STAR EROSION CONTROL 0.67% $70,270.96
TORO BRAVO CONSTRUCTION, LLC 0.57% $59,782.76
TRAFFIC SIGNS & LINES, LLC 0.46% $48,245.73
TORO BRAVO CONSTRUCTION, LLC 0.42% $44,050.45
GREGORY PILE DRIVING, INC. 0.33% $34,611.07
MB PRIME LLC 0.23% $24,122.87
H J HENKE, LLC 0.19% $19,927.59
PRIMATE CONSTRUCTION, LP 0.13% $13,634.66
SOUTH TEXAS TRAFFIC ALLIANCE INC. 0.10% $10,488.20
PROFESSIONAL TRAFFIC CONTROL LLC 0.05% $5,244.10
HIGHWAY INFRASTRUCTURE SAFETY SERVICES, INC. 0.05% $5,244.10
Total: 36.95% $3,875,390.89

Bid Items & Bid Tabulations

86 Total 0 of 86
LAVACA  |  UA 90  |  YOAKUM  |  0446-01-050  |  03/05/2024  |  $11,635,484.10  |  BR 2024(508)  |  BRIDGE REPL  |  349 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
E-Z BEL CONSTRUCTION, LLC
JAMES CONSTRUCTION GROUP, LLC
TEXAS MATERIALS GROUP, INC.
C. E. BARKER, LTD.
PREPARING ROW
STA 16.000 $3,500.000 $25,000.000 $63,000.000 $56,000.000 $39,062.500
EXCAVATION (ROADWAY)
CY 14,096.000 $20.000 $19.000 $16.700 $22.000 $41.550
EXCAVATION (CHANNEL)
CY 2,160.000 $20.000 $18.000 $18.780 $22.000 $41.550
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 14,607.000 $25.000 $23.000 $29.540 $45.000 $52.640
BLADING
HR 50.000 $100.000 $60.000 $138.950 $100.000 $83.120
FURNISHING AND PLACING TOPSOIL
CY 634.000 $30.000 $17.000 $8.780 $15.000 $41.550
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 25,346.000 $2.000 $0.290 $0.290 $0.290 $0.240
BROADCAST SEED (TEMP) (WARM)
SY 6,337.000 $2.000 $0.260 $0.260 $0.260 $0.200
BROADCAST SEED (TEMP) (COOL)
SY 6,337.000 $2.000 $0.260 $0.260 $0.260 $0.200
VEGETATIVE WATERING
MG 215.000 $75.000 $80.000 $21.150 $40.000 $41.550
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 3,840.000 $1.500 $2.400 $2.400 $2.400 $2.820
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 2,620.700 $110.000 $123.000 $102.580 $123.000 $138.520
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 96.600 $295.000 $375.000 $317.420 $340.000 $332.450
LIME TRT (EXST MATL)(8")
SY 6,086.000 $6.500 $7.000 $10.500 $10.700 $5.540
CEMENT
TON 58.700 $300.000 $250.000 $227.260 $275.000 $277.050
CEMENT TREAT(EXIST MATL)(8")
SY 6,086.000 $7.000 $5.500 $4.780 $5.400 $4.980
PRIME COAT (MC-30)
GAL 2,294.000 $6.000 $6.000 $6.810 $5.000 $6.650
AGGR(TY-PE GR-3 SAC-B)
CY 135.600 $450.000 $400.000 $457.730 $225.000 $166.230
AGGR(TY-PE GR-4 SAC-B)
CY 33.800 $450.000 $405.000 $564.490 $350.000 $332.450
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 6,070.000 $9.500 $5.000 $5.340 $5.000 $6.650
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 100.000 $100.000 $295.000 $280.340 $200.000 $118.730
CEM STABIL BKFL
CY 182.000 $185.000 $200.000 $106.500 $280.000 $243.800
TEMPORARY SPL SHORING
SF 4,350.000 $80.000 $70.000 $35.020 $46.000 $37.060
DRILL SHAFT (36 IN)
LF 655.000 $350.000 $270.000 $241.530 $347.000 $332.430
DRILL SHAFT (42 IN)
LF 3,872.000 $420.000 $280.000 $365.840 $441.000 $416.590
CL C CONC (ABUT)
CY 67.800 $1,600.000 $2,800.000 $1,368.540 $1,800.000 $963.610
CL C CONC (CAP)
CY 224.400 $1,800.000 $2,500.000 $2,104.610 $2,000.000 $1,541.920
CL C CONC (COLUMN)
CY 183.300 $1,600.000 $2,500.000 $1,359.480 $1,500.000 $2,459.110
REINF CONC SLAB
SF 62,560.000 $26.000 $25.000 $25.470 $31.000 $24.380
PRESTR CONC GIRDER (TX54)
LF 8,124.000 $220.000 $187.000 $180.410 $196.000 $178.780
RIPRAP (STONE PROTECTION)(18 IN)
CY 890.000 $220.000 $188.000 $166.530 $208.000 $265.270
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 2,768.000 $105.000 $70.000 $61.500 $104.000 $102.330
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
LF 180.000 $220.000 $419.000 $254.790 $307.000 $217.200
SET (TY II) (18 IN) (HDPE) (6: 1) (P)
EA 4.000 $1,700.000 $0.000 $0.000 $0.000 $0.000
REMOV STR (BRIDGE 1000 FT OR GREATER)
EA 1.000 $800,000.000 $275,000.000 $500,000.000 $190,000.000 $362,924.630
REMOV STR (SMALL FENCE)
LF 1,236.000 $3.300 $10.000 $1.580 $4.000 $3.360
MOBILIZATION
LS 1.000 $1,000,000.000 $800,000.000 $1,100,000.000 $1,200,000.000 $1,250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $3,500.000 $5,000.000 $5,000.000 $10,000.000 $10,590.470
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 50.000 $40.000 $60.000 $60.000 $60.000 $94.190
ROCK FILTER DAMS (REMOVE)
LF 50.000 $10.000 $12.500 $12.500 $13.000 $22.160
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,697.000 $4.500 $3.650 $3.650 $4.000 $4.710
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,697.000 $1.000 $0.500 $0.500 $0.500 $1.110
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 2,460.000 $60.000 $34.000 $34.400 $45.000 $68.430
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 960.000 $25.000 $14.000 $5.110 $18.000 $16.630
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 2,460.000 $18.000 $30.000 $11.350 $27.000 $16.630
DRIVEWAYS (SURF TREAT)
SY 310.000 $40.000 $47.700 $138.850 $77.000 $44.330
RUMBLE STRIPS (SHOULDER)
LF 6,966.000 $1.000 $0.220 $0.460 $1.600 $0.550
RUMBLE STRIPS (CENTERLINE)
LF 3,483.000 $1.000 $0.330 $0.700 $1.900 $0.550
MTL W-BEAM GD FEN (TIM POST)
LF 450.000 $30.000 $23.550 $23.550 $25.000 $41.210
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,300.000 $1,531.000 $1,530.420 $2,400.000 $2,135.660
REMOVE METAL BEAM GUARD FENCE
LF 1,650.000 $2.000 $2.150 $2.150 $2.400 $6.650
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $198.000 $221.000 $220.600 $190.000 $506.460
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $275.000 $221.000 $220.600 $260.000 $344.110
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,500.000 $2,639.220 $2,639.220 $3,100.000 $5,287.610
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,200.000 $752.000 $751.400 $2,000.000 $1,184.820
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,000.000 $452.000 $451.800 $1,200.000 $1,043.690
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $9,500.000 $7,641.000 $7,641.000 $10,000.000 $10,687.240
WIRE FENCE (TY A)
LF 1,258.000 $17.600 $12.000 $22.250 $18.000 $19.940
MAILBOX INSTALL-S (WC-POST) TY 3
EA 1.000 $275.000 $215.000 $205.000 $200.000 $480.860
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 3.000 $600.000 $334.000 $334.000 $400.000 $579.550
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 2.000 $600.000 $336.000 $336.000 $450.000 $571.600
REMOVE SM RD SN SUP&AM
EA 5.000 $110.000 $75.000 $75.000 $250.000 $110.820
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 210.000 $25.000 $18.000 $18.000 $19.000 $13.730
REMOVE DELIN & OBJECT MARKER ASSMS
EA 8.000 $25.000 $25.000 $25.000 $25.000 $13.880
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 30.000 $35.000 $28.000 $28.000 $29.000 $28.510
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 16,224.000 $1.000 $0.650 $0.650 $0.920 $1.220
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 19,372.000 $1.000 $0.650 $0.650 $0.920 $1.220
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 730.000 $2.000 $5.000 $1.500 $1.500 $2.440
REFL PAV MRKR TY II-A-A
EA 54.000 $6.000 $7.000 $7.000 $10.000 $6.650
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 9,000.000 $1.000 $0.500 $9.000 $9.800 $3.780
D-GR HMA TY-B PG70-22
TON 1,866.900 $150.000 $150.230 $182.850 $134.000 $237.150
D-GR HMA TY-D SAC-B PG70-22
TON 1,231.500 $170.000 $176.000 $182.850 $150.000 $249.340
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 1,886.800 $150.000 $155.000 $159.530 $150.000 $249.340
TACK COAT
GAL 2,666.000 $5.000 $5.000 $2.850 $4.000 $8.310
THERMO PIPE(18")(PP)(TY S)(TY II)
LF 67.000 $100.000 $0.000 $0.000 $0.000 $0.000
AMPHIBIAN/REPTILE EXCLUSION FENCE INST
LF 8,719.000 $4.000 $3.850 $3.850 $4.200 $5.540
AMPHIBIAN/REPTILE EXCLUSION FENCE REM
LF 8,719.000 $1.000 $0.500 $0.500 $0.540 $1.110
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $7,500.000 $10,417.440 $22,000.000 $17,420.380
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $9,000.000 $16,000.000 $10,000.000 $11,000.000 $16,622.500
TMA (STATIONARY)
DAY 20.000 $300.000 $350.000 $683.280 $400.000 $239.920
TMA (MOBILE OPERATION)
DAY 20.000 $300.000 $1,460.520 $1,086.240 $400.000 $1,079.630
HPPM-RIB W/RET REQ TYI(W)6"(SLD)100MIL
LF 8,566.000 $1.000 $0.850 $0.850 $1.200 $0.980
HPPM-RIB W/RET REQ TYI(Y)6"(BRK)100MIL
LF 1,080.000 $1.000 $2.000 $2.000 $2.800 $0.980
PAVEMENT SEALER 6"
LF 3,060.000 $1.000 $0.450 $0.450 $0.640 $0.110
1
RC PIPE (CL III)(18 IN)
LF 67.000 $100.000 $157.100 $137.380 $160.000 $99.950
2
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $1,700.000 $3,170.000 $1,769.690 $2,500.000 $3,158.280
Totals: $11,648,984.100 $10,488,202.657 $11,410,086.934 $12,599,793.160 $12,888,684.183