Items: 47

County: LAMPASAS
Length: 0.0000 MILES
Highway: 3RD ST
District: BROWNWOOD
Control Number: 0923-10-021
DBE Goal: 6.0%
Project: BR 2023(711)
Guaranty: $35,000.00
Time: 99 WORKING DAYS
Engineer's Estimate: $1,732,595.00
Date: 10/01/2024 (1 year ago)
Contract Number: 10243024
Type: BRIDGE REPLACEMENT
Project ID: A00135676
Project Description: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$1,732,595.00
$1,523,054.20
Over/Under Est: -12.09% -$209,540.80
$1,533,011.20
Over/Under Est: -11.52% -$199,583.80
Amt Left: 0.65% $9,957.00
Over/Under Est: -6.49% -$112,363.00
Amt Left: 6.38% $97,177.80
Delta: -5.69% -$87,220.80
$1,682,832.55
Over/Under Est: -2.87% -$49,762.45
Amt Left: 10.49% $159,778.35
Delta: -3.86% -$62,600.55
Over/Under Est: -1.94% -$33,613.00
Amt Left: 11.55% $175,927.80
Delta: -0.96% -$16,149.45
$1,701,548.40
Over/Under Est: -1.79% -$31,046.60
Amt Left: 11.72% $178,494.20
Delta: -0.15% -$2,566.40
$1,814,561.27
Over/Under Est: 4.73% $81,966.27
Amt Left: 19.14% $291,507.07
Delta: -6.64% -$113,012.87
Subcontractor Percentage Amount
TEXAS SHAFTS, INC. 12.05% $183,528.03
LONE STAR PAVING COMPANY 4.18% $63,663.67
D. I. J. CONSTRUCTION, INC. 0.47% $7,158.35
PRIMATE CONSTRUCTION, LP 0.42% $6,396.83
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 0.00% $0.00
LONE STAR EROSION CONTROL 0.00% $0.00
HERMANOS STEEL, LLC 0.00% $0.00
DIIBS SPECIALISTS, LLC 0.00% $0.00
Total: 17.12% $260,746.88

Bid Items & Bid Tabulations

47 Total 0 of 47
LAMPASAS  |  3RD ST  |  BROWNWOOD  |  0923-10-021  |  10/01/2024  |  $1,732,595.00  |  BR 2023(711)  |  BRIDGE REPL  |  99 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ACME BRIDGE COMPANY, INC.
SKYLINE BRIDGE LLC
KNIFE RIVER CORPORATION - SOUTH
C. E. BARKER, LTD.
DELGADO'S CONTRACTORS, LLC
STX CIVIL
YOKO EXCAVATING, LLC
PREPARING ROW
STA 3.600 $4,000.000 $10,000.000 $3,777.000 $17,000.000 $46,000.000 $1,250.000 $30,000.000 $6,416.771
EXCAV (ROADWAY)
CY 295.000 $22.000 $33.500 $19.000 $30.000 $14.240 $60.000 $48.000 $31.476
EXCAV (CHANNEL)
CY 1,277.000 $28.000 $28.600 $16.000 $30.000 $26.110 $50.000 $48.000 $48.434
EMBANK (FNL)(OC)(TY C)
CY 423.000 $32.000 $31.900 $36.000 $30.000 $15.430 $75.000 $28.000 $148.857
BROADCAST SEED (PERM_RURAL_SAND)
SY 1,100.000 $2.500 $2.100 $2.500 $2.750 $3.130 $1.000 $3.000 $3.353
BROADCAST SEED (TEMP_WARM)
SY 550.000 $2.000 $2.100 $2.500 $3.250 $3.520 $1.000 $4.000 $3.494
BROADCAST SEED (TEMP_COOL)
SY 550.000 $2.000 $2.100 $2.500 $3.250 $3.520 $1.000 $4.000 $3.589
VEGETATIVE WATERING
TGL 18.000 $70.000 $81.000 $1.000 $75.000 $22.550 $60.000 $70.000 $36.670
SOIL RET BLKT(SL_STEEP_SAND_LONG_SPRY)
SY 1,100.000 $7.000 $5.400 $6.000 $5.500 $3.930 $2.000 $4.000 $5.284
SOIL RET BLKT(CHAN_PERM_6 PSF)
SY 699.000 $10.000 $5.400 $6.000 $9.000 $12.190 $2.000 $13.000 $13.099
FL BS (CMP IN PLC)(TY A GR 4)(FNAL POS)
CY 276.000 $160.000 $122.000 $120.000 $110.000 $64.880 $100.000 $100.000 $96.053
PRIME COAT (MC-30)
GAL 489.000 $20.000 $13.000 $15.000 $10.000 $8.310 $15.000 $15.000 $17.087
ASPH (AC-20-5TR)
GAL 685.000 $20.000 $9.500 $15.000 $9.000 $29.670 $15.000 $15.000 $17.087
AGGR (TY-PB, GR-4)
CY 17.000 $1,000.000 $526.000 $825.000 $500.000 $356.030 $800.000 $952.000 $894.592
SP MIXES SP-C SAC-B PG76-22
TON 184.000 $500.000 $367.000 $350.000 $220.000 $296.690 $350.000 $422.000 $399.292
CEM STABIL BKFL
CY 40.000 $400.000 $294.000 $359.000 $345.000 $166.150 $275.000 $262.000 $338.435
TRENCH EXCAVATION PROTECTION
LF 70.000 $15.000 $81.100 $64.000 $15.000 $8.310 $25.000 $20.000 $39.088
DRILL SHAFT (24 IN)
LF 568.000 $275.000 $336.000 $383.000 $405.000 $400.600 $400.000 $386.000 $401.665
CL C CONC (ABUT)
CY 27.400 $2,000.000 $1,590.000 $1,150.000 $1,800.000 $1,871.450 $1,800.000 $1,880.000 $1,855.682
CL C CONC (CAP)
CY 20.800 $2,500.000 $1,870.000 $1,869.000 $2,000.000 $1,999.600 $1,800.000 $2,160.000 $2,001.861
CL C CONC (COLUMN)
CY 11.100 $2,500.000 $2,140.000 $2,278.000 $2,200.000 $2,053.700 $1,800.000 $2,654.000 $1,828.118
REINF CONC SLAB (SLAB BEAM)
SF 5,482.000 $40.000 $21.100 $28.000 $22.500 $25.260 $29.000 $21.000 $33.932
PRESTR CONC SLAB BEAM (4SB15)
LF 1,028.000 $225.000 $259.000 $246.000 $225.000 $201.880 $240.000 $209.000 $279.153
PRESTR CONC SLAB BEAM (5SB15)
LF 257.000 $275.000 $264.000 $336.000 $225.000 $201.880 $300.000 $199.000 $279.153
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,007.000 $200.000 $155.000 $189.000 $141.000 $136.480 $215.000 $180.000 $140.099
STR STEEL (RAILS/POSTS/PLATES)
LB 284.000 $40.000 $67.900 $40.000 $65.000 $11.650 $30.000 $35.000 $36.186
ANCHOR BOLTS
EA 110.000 $100.000 $74.500 $50.000 $70.000 $138.420 $100.000 $70.000 $51.928
RAIL (TY C223)
LF 284.000 $200.000 $180.000 $170.000 $250.000 $189.880 $220.000 $180.000 $241.989
ARMOR JOINT (SEALED)
LF 78.000 $230.000 $195.000 $159.000 $175.000 $71.210 $300.000 $154.000 $136.940
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $35,000.000 $42,100.000 $14,250.000 $80,000.000 $77,613.450 $55,000.000 $60,000.000 $77,027.755
MOBILIZATION
LS 1.000 $155,000.000 $129,000.000 $125,000.000 $160,000.000 $165,000.000 $125,000.000 $145,000.000 $159,788.553
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $6,000.000 $4,110.000 $1,800.000 $2,500.000 $2,741.390 $2,500.000 $1,500.000 $3,907.656
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 80.000 $65.000 $54.600 $45.000 $55.000 $74.330 $85.000 $79.000 $52.250
ROCK FILTER DAMS (REMOVE)
LF 80.000 $20.000 $19.100 $22.000 $16.000 $23.740 $5.000 $19.000 $15.594
TEMP SEDMT CONT FENCE (INSTALL)
LF 948.000 $6.000 $6.400 $4.000 $9.000 $5.270 $7.000 $6.000 $6.516
TEMP SEDMT CONT FENCE (REMOVE)
LF 948.000 $3.000 $2.100 $2.000 $1.000 $2.370 $1.000 $3.000 $2.270
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 222.000 $10.000 $9.500 $12.000 $10.000 $12.220 $10.000 $13.000 $16.226
BIODEG EROSN CONT LOGS (REMOVE)
LF 222.000 $3.000 $4.250 $9.000 $1.000 $2.370 $1.000 $5.000 $4.931
MTL W-BEAM GD FEN (STEEL POST)
LF 125.000 $40.000 $31.800 $36.000 $35.000 $49.840 $40.000 $39.000 $40.562
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $2,200.000 $1,270.000 $1,754.000 $1,500.000 $1,542.780 $1,250.000 $3,074.000 $1,588.616
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $4,000.000 $3,290.000 $4,191.000 $3,500.000 $3,441.580 $4,000.000 $4,851.000 $3,975.138
WIRE FENCE (TY A)
LF 400.000 $25.000 $14.700 $18.000 $35.000 $59.340 $20.000 $50.000 $29.890
WIRE FENCE (TY D)
LF 440.000 $30.000 $22.100 $20.000 $41.000 $59.340 $50.000 $50.000 $38.564
WIRE FENCE (SPECIAL)
LF 108.000 $50.000 $58.400 $33.000 $89.000 $118.680 $100.000 $100.000 $43.577
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 6.000 $50.000 $21.200 $47.000 $23.000 $57.390 $50.000 $50.000 $31.205
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $50.000 $26.500 $47.000 $29.000 $41.540 $50.000 $50.000 $38.746
TIP TESTING(DRILL SHAFT)
EA 4.000 $8,500.000 $4,240.000 $6,441.000 $6,000.000 $4,747.000 $5,000.000 $5,035.000 $5,082.906
Totals: $1,732,595.000 $1,523,054.200 $1,533,011.200 $1,620,232.000 $1,682,832.550 $1,698,982.000 $1,701,548.400 $1,814,561.411