LAMB US0084 (6491-51-001)

Items: 40

County: LAMB
Length: 0.0100 MILES
Highway: US0084
District: LUBBOCK
Control Number: 6491-51-001
DBE Goal: 0.0%
Project: RMC - A00217871
Guaranty: $10,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $476,500.00
Date: 12/04/2025 (6 months ago) Changed
Contract Number: 12250502
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00217871
Project Description: FY26 LITTLEFIELD CALL OUT MBGF REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$476,500.00
$291,801.00
Over/Under Est: -38.76% -$184,699.00
$363,758.00
Over/Under Est: -23.66% -$112,742.00
Amt Left: 24.66% $71,957.00
Over/Under Est: -22.16% -$105,614.00
Amt Left: 27.1% $79,085.00
Delta: -1.96% -$7,128.00
Over/Under Est: -0.74% -$3,549.00
Amt Left: 62.08% $181,150.00
Delta: -27.52% -$102,065.00
Over/Under Est: 3.52% $16,784.00
Amt Left: 69.05% $201,483.00
Delta: -4.30% -$20,333.00

Bid Items & Bid Tabulations

40 Total 0 of 40
LAMB  |  US0084  |  LUBBOCK  |  6491-51-001  |  12/04/2025  |  $476,500.00  |  RMC - A00217871  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BK FIELD OPERATIONS LLC
E.V.G. ENTERPRISE
AUSTIN BARRICADE COMPANY, L.L.C.
BARRICADES UNLIMITED
TI-ZACK CONCRETE, LLC
MOBILIZATION (CALLOUT)
EA 12.000 $2,000.000 $1.000 $1.000 $1.000 $2,500.000 $1,500.000
MOBILIZATION (EMERGENCY)
EA 12.000 $2,500.000 $1.000 $1.000 $1.000 $2,500.000 $4,000.000
TMA (STATIONARY)
DAY 50.000 $100.000 $1.000 $100.000 $4,800.000 $500.000 $275.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,500.000 $25.000 $25.000 $35.000 $20.000 $30.000 $82.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,000.000 $2,000.000 $20.000 $1,500.000 $10.000 $1,650.000
MTL BEAM GD FEN TRANS (TL2)
EA 2.000 $1,000.000 $600.000 $20.000 $100.000 $10.000 $3,080.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,000.000 $100.000 $1.000 $1.000 $1,000.000 $1,100.000
MTL BM GD FEN TRANS (NON - SYM)
EA 2.000 $750.000 $500.000 $100.000 $100.000 $1.000 $1,650.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 250.000 $75.000 $40.000 $30.000 $8.000 $40.000 $82.500
MTL BM GD FEN TRANS (31"-28")
EA 10.000 $100.000 $1.000 $1.000 $50.000 $250.000 $825.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 10.000 $500.000 $2.000 $100.000 $25.000 $500.000 $196.900
MTL W-BEAM GD FEN (NESTED)(STEEL POST)
LF 150.000 $50.000 $30.000 $200.000 $20.000 $30.000 $159.500
MBGF (W-BEAM) (MED BAR)
LF 250.000 $50.000 $20.000 $25.000 $10.000 $40.000 $72.600
REMOVE METAL BEAM GUARD FENCE
LF 1,500.000 $5.000 $1.000 $1.000 $1.000 $1.000 $2.200
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $125.000 $1.000 $1.000 $100.000 $1.000 $550.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $750.000 $500.000 $1.000 $1.000 $1.000 $275.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $2,000.000 $8,000.000 $3,500.000 $4,500.000 $8,000.000 $3,850.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 5.000 $150.000 $1.000 $1,000.000 $100.000 $1.000 $770.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $100.000 $1.000 $1,000.000 $100.000 $1.000 $495.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 250.000 $5.000 $5.000 $1.000 $1.000 $24.000 $7.700
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 250.000 $5.000 $5.000 $1.000 $1.000 $24.000 $12.100
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 250.000 $5.000 $1.000 $1.000 $1.000 $24.000 $9.900
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BI)
EA 250.000 $5.000 $1.000 $1.000 $1.000 $24.000 $13.200
REPLACE RAIL ELEMENT (W-BEAM)
LF 2,500.000 $20.000 $35.000 $17.000 $10.000 $25.000 $16.500
REPLACE TIMBER POST W/O CONC FND
EA 250.000 $100.000 $1.000 $80.000 $1.000 $100.000 $16.500
REPLACE STEEL POST W/O CONC FND
EA 250.000 $100.000 $80.000 $200.000 $1.000 $120.000 $22.000
REPLACE TIMBER POST W/ CONC FND
EA 250.000 $100.000 $1.000 $80.000 $1.000 $10.000 $27.500
REPLACE STEEL POST W/ CONC FND
EA 250.000 $100.000 $1.000 $60.000 $1.000 $10.000 $38.500
REALIGN POSTS
EA 250.000 $20.000 $1.000 $10.000 $1.000 $150.000 $24.200
REPLACE BLOCKOUT
EA 250.000 $175.000 $1.000 $100.000 $50.000 $12.000 $27.500
REPAIR STEEL POST WITH BASE PLATE
EA 50.000 $150.000 $1.000 $10.000 $1.000 $25.000 $36.300
RESET SGT IMPACT HEAD
EA 10.000 $250.000 $100.000 $50.000 $1.000 $1.000 $1,650.000
REPLACE SGT OBJECT MARKER
EA 10.000 $25.000 $100.000 $10.000 $1.000 $10.000 $93.500
REPLACE POSTS (TL-4)(GIBRALTAR)
EA 150.000 $250.000 $400.000 $200.000 $100.000 $250.000 $170.500
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 5.000 $50.000 $1.000 $1.000 $100.000 $1.000 $495.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 5.000 $250.000 $1.000 $10.000 $1.000 $1.000 $1,320.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 5.000 $3,000.000 $2,000.000 $1,800.000 $1,500.000 $5,000.000 $990.000
REPLACE CABLE (TL-4)
LF 1,000.000 $5.000 $1.000 $1.000 $1.000 $1.000 $7.700
CHECK / RE-TENSION CABLE (TL-4)
EA 25.000 $750.000 $1.000 $1.000 $1.000 $1.000 $55.000
REPLACE POST HARDWARE (TL-4)
EA 150.000 $50.000 $1.000 $100.000 $1.000 $50.000 $24.200
Totals: $476,500.000 $291,801.000 $363,758.000 $370,886.000 $472,951.000 $493,284.000