Show Job Controls
Bid Cobra

LAMAR US0082 (6491-56-001)

Items: 33

County: LAMAR
Length: 0.0100 MILES
Highway: US0082
District: PARIS
Control Number: 6491-56-001
DBE Goal: 0.0%
Project: RMC - A00217878
Guaranty: $10,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $497,445.00
Date: 11/20/2025 (6 months ago)
Contract Number: 11250103
Type: ILLUMINATION MAINTENANCE
Project ID: A00217878
Project Description: ON CALL ILLUMINATION MAINTENANCE FOR THE PARIS DISTRICT.
Mail/Deliver Bids To: N/A
DARIUS SAMUELS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$497,445.00
$488,025.00
Over/Under Est: -1.89% -$9,420.00
Over/Under Est: 10.91% $54,270.00
Amt Left: 13.05% $63,690.00
Over/Under Est: 11.98% $59,615.00
Amt Left: 14.15% $69,035.00
Delta: -0.97% -$5,345.00

Bid Items & Bid Tabulations

33 Total 0 of 33
LAMAR  |  US0082  |  PARIS  |  6491-56-001  |  11/20/2025  |  $497,445.00  |  RMC - A00217878  |  ILLUM MAINT  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
VACA UNDERGROUND UTILITIES INC
AMERICAN LIGHTING AND SIGNALIZATION, LLC
NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION
RIPRAP (CONC)(CL C)
CY 10.000 $1,000.000 $2,000.000 $800.000 $600.000
MOBILIZATION (CALLOUT)
EA 10.000 $3,000.000 $7,500.000 $4,250.000 $5,150.000
TMA (STATIONARY)
DAY 60.000 $210.000 $250.000 $300.000 $600.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 2.000 $3,000.000 $350.000 $850.000 $1,150.000
REMOVE RD IL ASM (TRANS-BASE)
EA 1.000 $1,400.000 $1,500.000 $950.000 $750.000
ELC SRV TY A 120/240 060(NS)AL(E)SP(O)
EA 2.000 $7,000.000 $5,500.000 $9,000.000 $2,500.000
INSTALL OF DUCT CABLES
LF 2,000.000 $15.000 $15.000 $28.000 $16.000
REPLACE OF ELECTRICAL SERVICE
EA 2.000 $5,500.000 $1,500.000 $3,000.000 $2,500.000
REPLACE ABOVE-GROUND CONDUIT
LF 25.000 $30.000 $15.000 $25.000 $20.000
INSTALL CONDUCTOR
LF 1,500.000 $4.000 $2.000 $5.000 $8.000
REPLACE CONDUCTOR
LF 1,500.000 $4.000 $2.000 $5.000 $12.500
REPLACE DUCT CABLE
LF 4,000.000 $15.000 $15.000 $28.000 $18.000
INSTALL ELECTRICAL SPLICE
EA 2.000 $60.000 $50.000 $100.000 $200.000
ROAD BORE
LF 1,000.000 $25.000 $25.000 $38.000 $40.000
INSTALL ROADWAY ILLUM ASSEMBLY (LED)
EA 10.000 $1,300.000 $3,500.000 $2,700.000 $1,100.000
REPLACE ROADWAY ILLUM ASSEMBLY (LED)
EA 25.000 $3,500.000 $2,500.000 $2,700.000 $3,500.000
REPLACE HIGH MAST LUMINAIRES
EA 5.000 $1,000.000 $750.000 $550.000 $450.000
SCHEDULE PREV MAINT (HIGH MAST ASSM)
EA 35.000 $815.000 $1,000.000 $200.000 $900.000
REPLACE STEEL SERVICE POLE
EA 1.000 $2,900.000 $1,500.000 $2,550.000 $750.000
INSTALL GROUND BOX W/APRON
EA 2.000 $1,000.000 $1,000.000 $2,100.000 $750.000
INSTALL FOUNDATION
EA 20.000 $2,500.000 $2,500.000 $2,800.000 $2,200.000
REPLACE TRANSFORMER BASE
EA 5.000 $1,000.000 $500.000 $1,250.000 $900.000
REPLACE TRANSFORMER BASE COVER
EA 3.000 $150.000 $50.000 $30.000 $20.000
REPLACE FUSE
EA 60.000 $50.000 $50.000 $10.000 $20.000
REPLACE FUSE HOLDER
EA 30.000 $225.000 $50.000 $35.000 $175.000
REPLACE PHOTOCELL AND BRACKET
EA 5.000 $135.000 $50.000 $50.000 $100.000
REPLACE HAND-OFF-AUTO SWITCH
EA 5.000 $200.000 $50.000 $50.000 $150.000
REPLACE CONTACTOR
EA 1.000 $375.000 $50.000 $100.000 $250.000
REPLACE BREAKER PANEL
EA 1.000 $800.000 $250.000 $1,750.000 $750.000
INSTALL CIRCUIT BREAKER
EA 1.000 $400.000 $50.000 $50.000 $200.000
REPLACE CIRCUIT BREAKER
EA 2.000 $150.000 $50.000 $50.000 $200.000
REPLACE LUMINAIRES
EA 100.000 $750.000 $350.000 $500.000 $815.000
REPLACE 3/8" WIRE ROPE
EA 1.000 $1,900.000 $7,500.000 $7,250.000 $1,000.000
Totals: $497,445.000 $488,025.000 $551,715.000 $557,060.000