Show Job Controls
Bid Cobra

LAMAR CR (0901-29-092)

Items: 54

County: LAMAR
Length: N/A
Highway: CR
District: PARIS
Control Number: 0901-29-092
DBE Goal: N/A
Project: BR 2022(837)
Guaranty: N/A
Time: 115 WORKING DAYS
Engineer's Estimate: $1,402,853.20
Date: 06/01/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
DANIEL TAYLOR
ZACHARY SMITH
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$1,402,853.20
$1,489,927.72
Over/Under Est: 6.21% $87,074.52
Over/Under Est: 43.14% $605,185.80
Amt Left: 34.77% $518,111.28
Subcontractor Percentage Amount
PEACHTREE CONSTRUCTION, LTD. 8.05% $126,483.43
RICHARD DRAKE CONSTRUCTION COMPANY, L.P. 5.56% $87,359.98
A. E. MOORE CONSTRUCTION, INC. 2.38% $37,395.10
FLEX SUPPLY, LLC 1.06% $16,654.96
LINEAR TRAFFIC MARKINGS LLC 0.63% $9,898.70
KING GEORGE TRAFFIC SOLUTIONS LLC 0.60% $9,427.34
Total: 18.28% $287,219.51

Bid Items & Bid Tabulations

54 Total 0 of 54
LAMAR  |  CR  |  PARIS  |  0901-29-092  |  06/01/2023  |  $1,402,853.20  |  BR 2022(837)  |  BRIDGE REPL  |  115 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HIGHWAY 19 CONSTRUCTION LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
PREPARING ROW
STA 17.000 $2,000.000 $1,000.000 $7,500.000
REMOVING STAB BASE AND ASPH PAV (11")
SY 789.000 $15.000 $25.000 $25.000
EXCAVATION (ROADWAY)
CY 221.000 $20.000 $25.000 $45.000
EXCAVATION (CHANNEL)
CY 556.000 $30.000 $25.000 $30.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 4,144.000 $30.000 $19.000 $28.000
BROADCAST SEED (TEMP) (WARM)
SY 8,610.000 $0.200 $0.250 $0.250
BROADCAST SEED (TEMP) (COOL)
SY 8,610.000 $0.200 $0.250 $0.250
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
SY 16,760.000 $1.500 $0.500 $0.700
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 460.000 $1.500 $5.000 $3.000
VEGETATIVE WATERING
MG 105.000 $20.000 $10.000 $1.000
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 820.000 $12.000 $35.000 $40.000
FL BS (CMP IN PLC)(TY D GR 4)
TON 763.000 $11.000 $45.000 $140.000
REWORK BS MTL (TY A)(11")(ORD COMP)
STA 12.000 $20.000 $2,916.000 $3,200.000
CEMENT
TON 28.000 $232.000 $250.000 $350.000
CEMENT TREAT (NEW BASE) (6")
SY 3,582.000 $4.600 $4.710 $15.000
ASPH (RC-250)
GAL 1,003.000 $8.000 $10.000 $8.000
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 27.000 $147.000 $364.000 $600.000
CEM STABIL BKFL
CY 105.000 $200.000 $250.000 $250.000
DRILL SHAFT (18 IN)
LF 172.000 $237.000 $132.000 $110.000
DRILL SHAFT (24 IN)
LF 108.000 $147.000 $221.000 $240.000
DRILL SHAFT (36 IN)
LF 344.000 $250.000 $204.000 $240.000
CL C CONC (ABUT)
CY 73.600 $1,200.000 $1,400.000 $1,500.000
REINF CONC SLAB
SF 3,240.000 $25.000 $26.000 $30.000
REINF CONC SLAB (SLAB BEAM)
SF 1,300.000 $15.000 $19.000 $25.000
APPROACH SLAB
CY 48.000 $830.000 $600.000 $850.000
PRESTR CONC SLAB BEAM (5SB15)
LF 247.500 $174.000 $348.000 $400.000
PRESTR CONC GIRDER (TX40)
LF 447.500 $285.000 $259.000 $360.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 539.000 $175.000 $180.000 $175.000
RAIL (TY T223)
LF 240.000 $100.000 $150.000 $185.000
RAIL (TY T631LS)
LF 128.000 $66.000 $80.000 $85.000
ARMOR JOINT
LF 68.000 $158.000 $180.000 $160.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $13,000.000 $10,000.000 $28,000.000
MOBILIZATION
LS 1.000 $129,129.000 $100,000.000 $175,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $2,500.000 $2,100.000 $6,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 200.000 $35.000 $35.000 $1.000
ROCK FILTER DAMS (REMOVE)
LF 200.000 $10.000 $10.000 $1.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 250.000 $20.000 $15.000 $1.000
CONSTRUCTION EXITS (REMOVE)
SY 250.000 $6.000 $5.000 $1.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,095.000 $5.000 $3.000 $1.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,095.000 $2.000 $1.000 $1.000
MTL W-BEAM GD FEN (STEEL POST)
LF 900.000 $30.000 $35.000 $30.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $10.000 $2.000 $4.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 8.000 $185.000 $200.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,100.000 $2,950.000 $3,000.000
WIRE FENCE (TY C)
LF 493.000 $12.000 $17.000 $20.000
WIRE FENCE (WATER GAP)
LF 40.000 $100.000 $1.000 $75.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 24.000 $30.000 $45.000 $50.000
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 2,514.000 $0.400 $3.000 $3.000
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 310.000 $0.450 $5.000 $4.000
D-GR HMA TY-C SAC-A PG64-22
TON 592.000 $171.000 $250.000 $220.000
BONDING COURSE
GAL 179.000 $10.000 $7.000 $10.000
GEOGRID BASE REINFORCEMENT (TY II)
SY 3,582.000 $2.200 $2.000 $2.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $130.000 $17,000.000 $25,000.000
TMA (STATIONARY)
DAY 73.000 $376.000 $250.000 $200.000
Totals: $1,402,853.200 $1,489,927.720 $2,008,039.000