PREPARING ROW
|
STA
|
138.000
|
$550.000
|
$682.000
|
$702.000
|
$1,000.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
355.000
|
$5.000
|
$6.000
|
$19.440
|
$5.000
|
|
|
REMOVING CONC (WHEELCHAIR RAMP)
|
SY
|
7.000
|
$15.000
|
$21.000
|
$19.440
|
$100.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
53.000
|
$540.000
|
$180.000
|
$529.390
|
$300.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
37.000
|
$15.000
|
$38.600
|
$59.850
|
$50.000
|
|
|
BACKFILL (TY B)
|
STA
|
53.000
|
$125.000
|
$200.000
|
$207.240
|
$300.000
|
|
|
SPEC EXCAV WORK (ORIGINAL)
|
CY
|
468.000
|
$9.500
|
$12.000
|
$29.460
|
$30.000
|
|
|
BLOCK SODDING
|
SY
|
1,056.000
|
$3.800
|
$5.500
|
$4.320
|
$6.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
8,871.000
|
$0.100
|
$0.100
|
$0.060
|
$0.120
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
8,871.000
|
$0.100
|
$0.100
|
$0.060
|
$0.120
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
18,798.000
|
$0.230
|
$0.240
|
$0.270
|
$0.300
|
|
|
VEGETATIVE WATERING
|
MG
|
219.000
|
$15.000
|
$40.000
|
$60.110
|
$12.000
|
|
|
FL BS (RDWY DEL) (TY A GR 4)
|
TON
|
5,574.000
|
$25.000
|
$30.000
|
$26.920
|
$35.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4)(12")
|
SY
|
40.000
|
$25.000
|
$30.000
|
$182.840
|
$50.000
|
|
|
REWORK BS MTL (TY B) (6") (ORD COMP)
|
SY
|
6,889.000
|
$3.200
|
$3.500
|
$7.600
|
$10.000
|
|
|
REWORK BS MATL (TY C)(7")(ORD COMP)
|
SY
|
8,877.000
|
$3.500
|
$3.500
|
$2.180
|
$10.000
|
|
|
REWORK BS MTL (TY B) (9-18") (ORD COMP)
|
SY
|
1,334.000
|
$5.500
|
$5.250
|
$18.480
|
$30.000
|
|
|
CEMENT
|
TON
|
200.000
|
$140.000
|
$165.000
|
$158.520
|
$165.000
|
|
|
CEMENT TREAT(MX EXST MTL & NW BS)(12")
|
SY
|
16,506.000
|
$3.000
|
$3.750
|
$3.640
|
$3.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
5,942.000
|
$4.400
|
$4.150
|
$4.020
|
$5.000
|
|
|
AGGR(TY-B GR-4 SAC-B)
|
CY
|
137.000
|
$95.000
|
$170.000
|
$262.950
|
$200.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
6,403.000
|
$67.000
|
$94.350
|
$82.990
|
$85.000
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
77,553.000
|
$3.500
|
$2.090
|
$2.530
|
$2.000
|
|
|
PLANE ASPH CONC PAV(0" TO 6")
|
SY
|
1,810.000
|
$3.500
|
$6.250
|
$4.320
|
$3.000
|
|
|
CUT & RESTORING PAV
|
SY
|
67.000
|
$150.000
|
$150.000
|
$189.000
|
$200.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
15.000
|
$265.000
|
$250.000
|
$297.000
|
$200.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
133.000
|
$16.000
|
$10.000
|
$21.600
|
$5.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
2.000
|
$940.000
|
$1,350.000
|
$540.000
|
$800.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
8.000
|
$210.000
|
$675.000
|
$393.730
|
$85.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
43.000
|
$425.000
|
$470.000
|
$513.000
|
$450.000
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
16.000
|
$119.000
|
$190.000
|
$513.000
|
$700.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
256.000
|
$66.000
|
$85.000
|
$91.800
|
$80.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
6.000
|
$96.000
|
$125.000
|
$118.800
|
$90.000
|
|
|
INLET (COMPL)(CURB)(5FT)(BOTH)
|
EA
|
1.000
|
$7,500.000
|
$6,550.000
|
$8,640.000
|
$6,000.000
|
|
|
SET (TY II) (24 IN) (CMP) (3: 1) (C)
|
EA
|
2.000
|
$1,500.000
|
$6,550.000
|
$864.000
|
$700.000
|
|
|
SET (TY II) (24 IN) (CMP) (4: 1) (C)
|
EA
|
2.000
|
$1,200.000
|
$2,950.000
|
$1,080.000
|
$800.000
|
|
|
SET (TY II) (24 IN) (CMP) (4: 1) (P)
|
EA
|
2.000
|
$1,125.000
|
$2,950.000
|
$1,080.000
|
$800.000
|
|
|
REMOV STR (SET)
|
EA
|
1.000
|
$400.000
|
$600.000
|
$540.000
|
$500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
246.000
|
$15.000
|
$17.000
|
$16.200
|
$11.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$26,000.000
|
$205,450.000
|
$161,352.640
|
$300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$4,000.000
|
$1,950.000
|
$17,444.700
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
258.000
|
$34.000
|
$36.000
|
$43.200
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
258.000
|
$7.000
|
$6.000
|
$8.640
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,685.000
|
$2.250
|
$2.500
|
$2.700
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,685.000
|
$0.620
|
$0.500
|
$1.080
|
$0.500
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
460.000
|
$35.000
|
$26.500
|
$48.600
|
$40.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
4,063.000
|
$32.000
|
$37.900
|
$40.190
|
$40.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
425.000
|
$80.000
|
$80.000
|
$108.000
|
$100.000
|
|
|
TURNOUTS (ACP)
|
SY
|
36.000
|
$58.000
|
$92.500
|
$138.380
|
$55.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
649.000
|
$20.000
|
$16.500
|
$10.230
|
$25.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
205.000
|
$68.000
|
$68.500
|
$86.400
|
$55.000
|
|
|
CURB RAMPS (TY 3)
|
EA
|
2.000
|
$1,200.000
|
$1,750.000
|
$4,860.000
|
$3,000.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
2.000
|
$1,000.000
|
$1,950.000
|
$4,536.000
|
$3,000.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
325.000
|
$24.000
|
$22.000
|
$22.680
|
$25.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,156.000
|
$1,075.000
|
$1,107.000
|
$1,300.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
350.000
|
$2.500
|
$6.000
|
$6.480
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$225.000
|
$400.000
|
$432.000
|
$300.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,500.000
|
$2,500.000
|
$2,700.000
|
$3,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
1.000
|
$125.000
|
$185.000
|
$187.920
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
25.000
|
$475.000
|
$480.000
|
$471.960
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$950.000
|
$850.000
|
$916.920
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM (INST SIGN ONLY)
|
EA
|
35.000
|
$175.000
|
$35.000
|
$213.840
|
$500.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
$500.000
|
$450.000
|
$462.240
|
$800.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
25.000
|
$70.000
|
$75.000
|
$74.520
|
$200.000
|
|
|
REMOVE SM RD SN SUP&AM (SIGN ONLY)
|
EA
|
35.000
|
$50.000
|
$70.000
|
$74.520
|
$100.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,242.000
|
$0.750
|
$1.350
|
$1.660
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
3,542.000
|
$0.900
|
$1.000
|
$1.130
|
$1.200
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
1,361.000
|
$7.000
|
$6.000
|
$6.780
|
$6.000
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
11.000
|
$112.000
|
$125.000
|
$141.230
|
$120.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
11.000
|
$146.000
|
$125.000
|
$141.230
|
$170.000
|
|
REFL PAV MRK TY I (W)(RR XING)(090MIL)
|
EA
|
2.000
|
$550.000
|
$500.000
|
$564.930
|
$600.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
|
EA
|
45.000
|
$35.000
|
$48.000
|
$54.230
|
$35.000
|
|
REFL PAV MRK TY I (W)(BIKE ARW)(090MIL)
|
EA
|
1.000
|
$85.000
|
$275.000
|
$310.720
|
$115.000
|
|
REFL PAV MRK TY I(W)(BIKE SYML)(090MIL)
|
EA
|
1.000
|
$141.000
|
$275.000
|
$310.720
|
$250.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(090MIL)
|
LF
|
613.000
|
$3.500
|
$6.000
|
$6.780
|
$6.000
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
|
LF
|
17,070.000
|
$0.540
|
$0.700
|
$0.790
|
$0.660
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
|
LF
|
13,460.000
|
$0.540
|
$0.700
|
$0.790
|
$0.660
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
4,250.000
|
$0.450
|
$0.410
|
$0.460
|
$0.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
37,546.000
|
$0.540
|
$0.340
|
$0.380
|
$0.440
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
2,570.000
|
$0.500
|
$0.680
|
$0.460
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
37,784.000
|
$0.500
|
$0.340
|
$0.380
|
$0.440
|
|
REFL PAV MRKR TY I-C
|
EA
|
76.000
|
$3.250
|
$3.700
|
$4.180
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,052.000
|
$3.250
|
$3.700
|
$4.180
|
$4.000
|
|
|
D-GR HMA TY-D SAC-A PG64-22
|
TON
|
10,155.000
|
$87.000
|
$93.250
|
$98.400
|
$100.000
|
|
|
BONDING COURSE
|
GAL
|
5,447.000
|
$3.430
|
$3.700
|
$5.730
|
$3.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$13,300.000
|
$9,183.120
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
96.000
|
$200.000
|
$100.000
|
$491.160
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
96.000
|
$256.000
|
$600.000
|
$67.900
|
$300.000
|
|
Totals: |
$2,614,367.640
|
$3,050,337.490
|
$3,227,052.820
|
$3,461,314.340
|