LAMAR US 271 (0221-01-074)

Items: 100

County: LAMAR
Length: N/A
Highway: US 271
District: PARIS
Control Number: 0221-01-074
DBE Goal: N/A
Project: NH 2018(127)
Guaranty: N/A
Time: 197 WORKING DAYS
Engineer's Estimate: $9,586,977.31
Date: 10/03/2017 (8 years ago)
Contract Number: N/A
Type: WIDEN NON-FREEWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$9,586,977.31
1
$8,915,686.62
Over/Under Est: -7% -$671,290.69
Over/Under Est: -6.04% -$579,162.76
Amt Left: 1.03% $92,127.93
Over/Under Est: -1.08% -$103,890.51
Amt Left: 6.36% $567,400.18
Delta: -5.28% -$475,272.25
Over/Under Est: 4.3% $412,234.42
Amt Left: 12.15% $1,083,525.11
Delta: -5.44% -$516,124.93
Over/Under Est: 14.74% $1,413,582.43
Amt Left: 23.38% $2,084,873.12
Delta: -10.01% -$1,001,348.01
$11,389,779.15
Over/Under Est: 18.8% $1,802,801.84
Amt Left: 27.75% $2,474,092.53
Delta: -3.54% -$389,219.41
$11,415,622.43
Over/Under Est: 19.07% $1,828,645.12
Amt Left: 28.04% $2,499,935.81
Delta: -0.23% -$25,843.28

Bid Items & Bid Tabulations

100 Total 0 of 100
LAMAR  |  US 271  |  PARIS  |  0221-01-074  |  10/03/2017  |  $9,586,977.31  |  NH 2018(127)  |  WIDEN NON-FREEWAY  |  197 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
HIGHWAY 19 CONSTRUCTION LLC
RICHARD DRAKE CONSTRUCTION COMPANY, L.P.
D. L. LENNON INCORPORATED - CONTRACTOR
AUSTIN BRIDGE & ROAD SERVICES, LP
FNH CONSTRUCTION, LLC
EAST TEXAS BRIDGE, INC.
PREPARING ROW
STA 262.810 $1,000.000 $450.000 $450.000 $430.000 $449.000 $750.000 $2,000.000 $1,100.000
REMOVING CONC (DRIVEWAYS)
SY 1,126.000 $15.000 $12.600 $10.000 $12.000 $17.000 $12.000 $20.000 $15.000
REMOVING STAB BASE & ASPH PAV (8")
SY 3,811.000 $15.000 $6.270 $5.000 $3.200 $20.500 $4.500 $20.000 $6.000
EXCAVATION (ROADWAY)
CY 816.000 $8.500 $13.710 $10.000 $15.000 $18.000 $21.000 $20.000 $12.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 375.000 $15.000 $31.230 $20.000 $30.000 $38.000 $60.000 $30.000 $12.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 8,640.000 $10.000 $14.100 $17.000 $20.000 $21.000 $18.000 $30.000 $12.000
BACKFILL (TY B)
STA 828.590 $165.000 $89.700 $150.000 $150.000 $330.000 $190.000 $250.000 $400.000
ROAD GRADER WORK (ORD COMP)
STA 238.060 $185.000 $218.800 $200.000 $200.000 $575.000 $320.000 $450.000 $400.000
FURNISHING AND PLACING TOPSOIL (4")
SY 3,811.000 $1.350 $5.510 $3.000 $3.000 $4.500 $4.000 $4.500 $3.000
BROADCAST SEED (TEMP) (WARM)
SY 115,646.000 $0.100 $0.110 $0.100 $0.100 $0.100 $0.090 $0.250 $0.130
BROADCAST SEED (TEMP) (COOL)
SY 115,646.000 $0.100 $0.120 $0.110 $0.110 $0.110 $0.100 $0.250 $0.130
STRAW/HAY MLCH SEED(PERM)(RURAL)(SANDY)
SY 231,284.000 $0.250 $0.240 $0.230 $0.230 $0.230 $0.240 $0.250 $0.300
VEGETATIVE WATERING
MG 1,388.000 $10.000 $19.490 $5.000 $18.000 $30.000 $24.850 $50.000 $15.000
FL BS (CMP IN PLC)(TY A GR 4)(10")
SY 50,930.000 $16.200 $14.540 $17.000 $17.690 $18.250 $14.000 $16.500 $17.000
REWORK BS MATL (TYB)(20")(OC)
SY 27,193.000 $4.000 $6.300 $3.920 $4.100 $7.850 $13.000 $3.000 $8.000
CEMENT
TON 825.000 $150.000 $147.000 $140.000 $140.000 $132.000 $155.000 $171.000 $150.000
CEMENT TREAT(EXIST MATL)(8")
SY 50,930.000 $3.500 $2.040 $3.750 $4.000 $4.350 $2.450 $3.500 $3.000
ASPH (AC-20-5TR)
GAL 24,989.000 $4.000 $3.410 $3.500 $3.500 $4.800 $3.200 $5.000 $4.000
ASPH (RC-250)
GAL 15,212.000 $4.000 $4.410 $4.000 $4.200 $5.700 $4.800 $5.000 $5.000
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 388.000 $100.000 $120.720 $137.000 $137.000 $125.000 $114.500 $125.000 $105.000
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
CY 518.000 $90.000 $114.230 $110.000 $110.000 $113.000 $93.000 $125.000 $100.000
D-GR HMA TY-D SAC-A PG64-22
TON 56,638.000 $85.000 $72.750 $72.550 $72.550 $72.750 $81.650 $76.500 $85.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(24")
SY 567.000 $130.000 $130.000 $180.000 $195.000 $120.000 $175.000 $150.000 $165.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(20")
SY 7,300.000 $40.000 $88.500 $111.000 $115.000 $87.740 $136.000 $105.000 $100.000
PLANE ASPH CONC PAV(0" TO 8")
SY 9,765.000 $5.000 $3.640 $3.500 $4.200 $4.360 $8.000 $12.500 $5.000
DRILL SHAFT (SIGN MTS) (12 IN)
LF 14.000 $110.000 $89.250 $85.000 $150.000 $200.000 $85.000 $150.000 $250.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 6.000 $210.000 $231.000 $220.000 $220.000 $175.000 $220.000 $250.000 $250.000
RIPRAP (CONC) (CL B) (4")
CY 0.350 $417.000 $525.000 $1,000.000 $1,000.000 $950.000 $3,000.000 $650.000 $5,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 706.700 $475.000 $393.750 $380.000 $400.000 $375.000 $488.000 $550.000 $400.000
CLEANING AND SEALING JOINTS
LF 568.000 $35.000 $29.400 $30.000 $30.000 $26.000 $40.000 $100.000 $38.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 5.000 $400.000 $409.500 $500.000 $525.000 $390.000 $460.000 $650.000 $800.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 20.000 $475.000 $420.000 $500.000 $525.000 $400.000 $410.000 $750.000 $800.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 13.000 $500.000 $472.500 $500.000 $525.000 $450.000 $510.000 $750.000 $800.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 12.000 $500.000 $551.250 $500.000 $525.000 $525.000 $615.000 $850.000 $1,000.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 4.000 $550.000 $551.250 $700.000 $700.000 $525.000 $765.000 $950.000 $1,000.000
WINGWALL (PW - 2) (HW=5 FT)
EA 2.000 $9,000.000 $8,400.000 $7,000.000 $7,500.000 $8,000.000 $13,800.000 $8,000.000 $8,000.000
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
EA 1.000 $6,800.000 $4,725.000 $4,500.000 $500.000 $4,500.000 $10,715.000 $6,000.000 $3,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
EA 1.000 $7,000.000 $5,040.000 $5,000.000 $5,000.000 $4,800.000 $8,700.000 $6,000.000 $6,000.000
SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (C)
EA 1.000 $4,500.000 $7,875.000 $7,000.000 $7,000.000 $7,500.000 $14,100.000 $10,000.000 $11,000.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
EA 1.000 $10,000.000 $7,875.000 $7,500.000 $7,500.000 $7,500.000 $12,760.000 $12,000.000 $8,000.000
REMOV & RE - LAY PIPE (18 IN)
LF 478.000 $75.000 $23.100 $30.000 $30.000 $22.000 $77.000 $30.000 $45.000
REMOV & RE - LAY PIPE (24 IN)
LF 116.000 $90.000 $28.350 $40.000 $40.000 $27.000 $97.000 $30.000 $55.000
MOBILIZATION
LS 1.000 $525,728.010 $500,000.000 $500,000.000 $626,698.000 $668,000.000 $1,025,000.000 $1,000,000.000 $1,100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $4,000.000 $1,051.380 $2,000.000 $2,500.000 $5,239.000 $5,000.000 $8,500.000 $12,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 705.000 $30.000 $29.400 $28.000 $28.000 $28.000 $34.530 $30.000 $35.000
ROCK FILTER DAMS (REMOVE)
LF 705.000 $10.000 $8.400 $8.000 $8.000 $8.000 $9.710 $15.000 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 390.000 $3.000 $3.150 $3.000 $3.000 $3.000 $5.780 $4.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 390.000 $0.750 $15.000 $1.000 $1.000 $1.000 $3.060 $2.000 $1.000
INTERSECTIONS (ACP)
SY 2,597.000 $30.000 $14.600 $12.900 $12.900 $19.650 $22.000 $25.000 $42.000
DRIVEWAYS (CONC)
SY 1,032.000 $70.000 $89.500 $65.000 $75.000 $85.000 $98.000 $95.000 $115.000
DRIVEWAYS (ACP)
SY 2,995.000 $27.000 $35.000 $13.200 $13.200 $48.250 $38.000 $25.000 $42.000
DRIVEWAYS (BASE)
SY 1,416.000 $14.000 $28.390 $25.000 $20.000 $25.000 $33.000 $18.000 $8.000
DRIVEWAYS (ACP) (TYPE 2)
SY 1,644.000 $20.000 $25.000 $30.500 $30.500 $25.350 $72.000 $45.000 $42.000
RUMBLE STRIPS (SHOULDER)
LF 213,734.000 $0.150 $0.110 $0.079 $0.120 $0.120 $0.160 $0.150 $0.150
RUMBLE STRIPS (CENTERLINE)
LF 102,077.000 $0.200 $0.110 $0.079 $0.120 $0.120 $0.170 $0.150 $0.150
MTL W-BEAM GD FEN (STEEL POST)
LF 7,825.000 $25.000 $17.060 $16.250 $22.250 $16.250 $16.250 $22.000 $22.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 20.000 $1,900.000 $1,359.750 $1,295.000 $1,575.000 $1,545.000 $1,295.000 $1,850.000 $1,800.000
MTL BEAM GD FEN TRANS (T6)
EA 22.000 $700.000 $488.250 $465.000 $775.000 $465.000 $465.000 $2,850.000 $600.000
SHORT RADIUS
LF 25.000 $40.000 $33.600 $32.000 $35.000 $32.000 $32.000 $35.000 $40.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,100.000 $918.750 $875.000 $1,250.000 $875.000 $875.000 $1,850.000 $1,200.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 200.000 $25.000 $23.100 $22.000 $30.000 $22.000 $22.000 $35.000 $25.000
REMOVE METAL BEAM GUARD FENCE
LF 9,475.000 $2.500 $1.580 $1.500 $3.000 $1.500 $1.500 $3.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $250.000 $105.000 $100.000 $110.000 $100.000 $100.000 $500.000 $250.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 86.000 $1,200.000 $945.000 $900.000 $1,000.000 $900.000 $900.000 $1,250.000 $1,100.000
MAILBOX INSTALL-S (TWG-POST) TY 4
EA 1.000 $350.000 $204.750 $195.000 $650.000 $110.000 $195.000 $650.000 $500.000
MAILBOX INSTALL-D (TWG-POST) TY 4
EA 1.000 $400.000 $257.250 $245.000 $750.000 $150.000 $245.000 $650.000 $500.000
REMOVE RD IL ASM (TRANS-BASE)
EA 1.000 $535.000 $1,575.000 $1,500.000 $1,500.000 $500.000 $1,500.000 $50.000 $2,000.000
IN RD IL AM (TY SA) 50T-8 (400W) S
EA 1.000 $3,700.000 $5,460.000 $5,200.000 $5,200.000 $3,700.000 $5,200.000 $3,600.000 $7,000.000
CONDT (RM) (3") (BORE)
LF 85.000 $38.000 $44.100 $42.000 $42.000 $35.000 $42.000 $65.000 $45.000
DCT CBL (3 NO.8) (2 INSULATED 1 BARE)
LF 250.000 $12.660 $18.900 $18.000 $18.000 $16.000 $18.000 $20.000 $25.000
ALUMINUM SIGNS (TY G)
SF 50.000 $24.000 $26.250 $25.000 $30.000 $30.000 $25.000 $50.000 $30.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 75.000 $500.000 $435.750 $415.000 $550.000 $370.000 $415.000 $650.000 $700.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 11.000 $600.000 $488.250 $465.000 $575.000 $420.000 $465.000 $650.000 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 6.000 $650.000 $687.750 $655.000 $650.000 $540.000 $655.000 $650.000 $900.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $800.000 $813.750 $775.000 $650.000 $590.000 $775.000 $650.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $900.000 $876.750 $835.000 $725.000 $750.000 $835.000 $650.000 $1,300.000
REMOVE SM RD SN SUP&AM
EA 111.000 $95.000 $78.750 $75.000 $110.000 $45.000 $75.000 $50.000 $115.000
INSTALL LRSS (STRUCT STEEL)
LB 570.800 $4.750 $5.200 $5.000 $5.250 $15.000 $4.950 $8.500 $10.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 98.000 $65.000 $39.900 $38.000 $65.000 $38.000 $38.000 $100.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 163.000 $35.000 $19.950 $19.000 $42.000 $19.000 $19.000 $100.000 $25.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 150,576.000 $0.150 $0.160 $0.150 $0.100 $0.150 $0.150 $0.200 $0.120
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 12,327.000 $0.800 $0.800 $0.500 $1.100 $0.780 $1.000 $2.000 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 11,526.000 $0.750 $0.800 $0.500 $1.100 $0.780 $1.000 $2.000 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,795.000 $0.800 $0.780 $0.740 $0.880 $0.740 $0.740 $1.000 $1.000
REFL PAV MRK TY I (W)18"(SLD)(100MIL)
LF 208.000 $4.000 $7.040 $6.700 $4.500 $6.700 $6.700 $5.000 $5.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 82.000 $5.000 $7.460 $7.100 $5.500 $7.100 $7.100 $10.000 $6.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 9.000 $115.000 $123.900 $118.000 $145.500 $118.000 $118.000 $165.000 $170.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 11.000 $150.000 $148.050 $141.000 $180.500 $141.000 $141.000 $200.000 $200.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 15.000 $25.000 $77.700 $74.000 $48.500 $74.000 $74.000 $100.000 $60.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 2,120.000 $5.000 $6.410 $6.100 $5.250 $6.100 $6.100 $6.000 $6.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 5,440.000 $0.300 $0.370 $0.350 $0.420 $0.350 $0.350 $0.500 $0.460
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 213,720.000 $0.250 $0.320 $0.300 $0.350 $0.300 $0.300 $0.400 $0.380
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 14,510.000 $0.280 $0.370 $0.350 $0.420 $0.350 $0.350 $0.500 $0.460
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 143,355.000 $0.250 $0.320 $0.300 $0.350 $0.300 $0.300 $0.400 $0.380
REFL PAV MRKR TY I-C
EA 387.000 $3.000 $5.250 $5.000 $3.300 $5.000 $5.000 $5.000 $4.000
REFL PAV MRKR TY II-A-A
EA 3,417.000 $3.000 $3.150 $3.000 $3.300 $3.000 $3.000 $5.000 $4.000
GEOGRID BASE REINFORCEMENT (TY II)
SY 50,930.000 $1.250 $3.740 $1.750 $2.400 $2.540 $1.950 $2.250 $2.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $16,154.960 $6,000.000 $13,000.000 $25,000.000 $24,000.000 $16,500.000 $20,000.000
TMA (STATIONARY)
DAY 120.000 $115.000 $262.500 $300.000 $225.000 $950.000 $330.000 $400.000 $200.000
TMA (MOBILE OPERATION)
HR 20.000 $128.000 $26.250 $100.000 $110.000 $1,130.000 $75.000 $150.000 $200.000
Totals: $9,586,977.310 $8,915,686.636 $9,007,814.559 $9,483,086.800 $9,999,211.730 $11,000,559.740 $11,389,779.150 $11,415,622.430