LAMAR US 82 (0045-09-116)

Items: 55

County: LAMAR
Length: N/A
Highway: US 82
District: PARIS
Control Number: 0045-09-116
DBE Goal: N/A
Project: STP 2024(077)HES
Guaranty: N/A
Time: 263 WORKING DAYS
Engineer's Estimate: $2,967,451.41
Date: 10/05/2023 (2 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
DANIEL TAYLOR
ZACHARY SMITH
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$2,967,451.41
$2,609,125.82
Over/Under Est: -12.08% -$358,325.59
$2,888,845.88
Over/Under Est: -2.65% -$78,605.53
Amt Left: 10.72% $279,720.06
$3,924,133.85
Over/Under Est: 32.24% $956,682.44
Amt Left: 50.4% $1,315,008.03
Delta: -35.84% -$1,035,287.97
Over/Under Est: 34.79% $1,032,426.69
Amt Left: 53.3% $1,390,752.28
Delta: -1.93% -$75,744.25
$4,018,332.00
Over/Under Est: 35.41% $1,050,880.59
Amt Left: 54.01% $1,409,206.18
Delta: -0.46% -$18,453.90
Subcontractor Percentage Amount
A. E. MOORE CONSTRUCTION, INC. 1.71% $45,778.33
DIAMOND ELITE BARRICADES, LLC 1.31% $35,069.95
Total: 3.02% $80,848.28

Bid Items & Bid Tabulations

55 Total 0 of 55
LAMAR  |  US 82  |  PARIS  |  0045-09-116  |  10/05/2023  |  $2,967,451.41  |  STP 2024(077)HES  |  HAZARD ELIM & SAFETY  |  263 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HIGHWAY 19 CONSTRUCTION LLC
CDM HOLDINGS
C. E. BARKER, LTD.
EAST TEXAS BRIDGE, INC.
FNH CONSTRUCTION, LLC
EXCAVATION (CHANNEL)
CY 50.000 $19.000 $50.000 $30.000 $99.710 $50.000 $100.000
BACKFILL (TY A)
STA 13.100 $270.000 $500.000 $800.000 $415.450 $800.000 $450.000
BROADCAST SEED (TEMP) (WARM)
SY 9,719.000 $0.150 $0.140 $0.150 $0.200 $0.200 $1.000
BROADCAST SEED (TEMP) (COOL)
SY 9,719.000 $0.150 $0.140 $0.150 $0.210 $0.200 $1.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 19,435.000 $2.000 $1.000 $1.250 $1.170 $0.500 $1.000
VEGETATIVE WATERING
MG 232.000 $15.000 $10.000 $65.000 $29.330 $20.000 $50.000
CUT & RESTORING PAV
SY 55.000 $130.000 $250.000 $90.000 $160.400 $200.000 $200.000
CUT & RESTORE CONC PAVING
SY 241.000 $220.000 $350.000 $140.000 $189.720 $350.000 $200.000
CUT & RESTORE ASPH PAVING
SY 723.000 $119.000 $250.000 $94.000 $148.670 $200.000 $180.000
CUT AND RESTORE PAV (FLEX BASE)
SY 1,536.000 $60.000 $35.000 $56.000 $86.500 $100.000 $85.000
FLOWABLE BACKFILL
CY 51.000 $300.000 $250.000 $406.000 $378.880 $400.000 $350.000
TRENCH EXCAVATION PROTECTION
LF 62.000 $20.000 $10.000 $43.000 $35.190 $100.000 $10.000
TEMPORARY SPL SHORING
SF 526.000 $39.000 $10.000 $56.000 $58.650 $85.000 $85.000
RIPRAP (MOW STRIP)(4 IN)
CY 138.280 $530.000 $550.000 $706.000 $680.340 $850.000 $550.000
CONC BOX CULV (5 FT X 5 FT)
LF 64.000 $725.000 $688.000 $850.000 $672.040 $1,000.000 $1,500.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 6.000 $600.000 $500.000 $1,272.000 $398.340 $2,000.000 $1,000.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 4.000 $600.000 $600.000 $1,565.000 $423.560 $2,000.000 $1,200.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 12.000 $850.000 $650.000 $1,246.000 $532.090 $2,000.000 $1,300.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 4.000 $930.000 $800.000 $2,797.000 $638.520 $2,400.000 $1,500.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 4.000 $1,000.000 $1,000.000 $3,555.000 $824.940 $2,500.000 $2,000.000
CONC BOX CULV (6 FT X 2.5 FT) (EXTEND)
LF 4.000 $900.000 $1,000.000 $2,382.000 $662.680 $2,500.000 $1,500.000
RC PIPE (CL III)(18 IN)
LF 5,962.000 $60.000 $48.750 $53.000 $126.540 $80.000 $80.000
RC PIPE (CL III)(24 IN)
LF 1,128.000 $70.000 $65.000 $98.000 $186.910 $100.000 $120.000
RC PIPE (CL III)(30 IN)
LF 104.000 $125.000 $95.000 $196.000 $211.920 $200.000 $150.000
RC PIPE (CL III)(36 IN)
LF 162.000 $130.000 $200.000 $243.000 $247.720 $250.000 $200.000
WINGWALL (PW - 2) (HW=4 FT)
EA 5.000 $11,000.000 $16,000.000 $22,785.000 $15,932.230 $18,000.000 $12,500.000
WINGWALL (PW - 2) (HW=7 FT)
EA 4.000 $25,000.000 $21,000.000 $39,950.000 $35,778.970 $40,000.000 $25,000.000
WINGWALL (PW - 2) (HW=8 FT)
EA 1.000 $28,000.000 $24,000.000 $63,000.000 $37,891.070 $40,000.000 $30,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 594.000 $1,200.000 $695.000 $820.000 $1,117.870 $1,000.000 $1,250.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $1,700.000 $778.000 $1,255.000 $937.230 $1,500.000 $2,250.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 118.000 $1,500.000 $1,125.000 $1,210.000 $1,492.060 $1,700.000 $1,850.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 10.000 $2,150.000 $2,500.000 $3,135.000 $4,449.190 $3,500.000 $5,000.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 12.000 $6,600.000 $5,945.000 $7,410.000 $6,646.220 $9,000.000 $8,000.000
CLEAN EXIST CULVERTS
EA 112.000 $225.000 $1,000.000 $1,200.000 $1,173.000 $1,500.000 $1,000.000
REMOV STR (BOX CULVERT)
EA 2.000 $7,500.000 $10,000.000 $8,200.000 $617.000 $11,500.000 $5,000.000
REMOV STR (WINGWALL)
EA 12.000 $1,300.000 $1,000.000 $2,610.000 $617.000 $2,500.000 $5,000.000
REMOV STR (HEADWALL)
EA 24.000 $500.000 $500.000 $1,555.000 $617.000 $1,500.000 $5,000.000
REMOV STR (PIPE)
LF 7,111.000 $10.000 $10.000 $7.250 $11.550 $25.000 $50.000
MOBILIZATION
LS 1.000 $269,768.310 $300,000.000 $200,000.000 $414,655.500 $350,000.000 $350,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 17.000 $10,000.000 $5,000.000 $4,050.000 $7,038.000 $15,000.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 360.000 $45.000 $40.000 $51.000 $58.650 $50.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 360.000 $10.000 $10.000 $11.250 $13.850 $12.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,130.000 $4.000 $4.000 $4.000 $5.870 $4.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,130.000 $1.000 $1.000 $1.000 $2.350 $1.000 $2.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,250.000 $34.000 $25.000 $31.200 $38.830 $32.000 $35.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $1,600.000 $1,500.000 $1,580.000 $1,784.890 $1,600.000 $1,850.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 175.000 $90.000 $120.000 $107.000 $90.380 $110.000 $100.000
TL-3 31" SHORT RADIUS (COMPLETE)
EA 2.000 $25,000.000 $29,000.000 $26,900.000 $29,676.900 $27,000.000 $2,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $3,200.000 $2,750.000 $3,110.000 $4,012.020 $3,200.000 $3,250.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $650.000 $500.000 $560.000 $949.550 $1,500.000 $1,100.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 24.000 $80.000 $55.000 $115.000 $79.030 $125.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 42.000 $43.000 $35.000 $30.000 $36.500 $50.000 $100.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $14,500.000 $20,000.000 $10,000.000 $15,249.000 $30,000.000 $16,500.000
TMA (STATIONARY)
DAY 241.000 $225.000 $50.000 $200.000 $410.550 $300.000 $250.000
TMA (MOBILE OPERATION)
HR 8.000 $250.000 $100.000 $140.000 $380.050 $100.000 $85.000
Totals: $2,967,451.410 $2,609,125.820 $2,888,845.880 $3,924,133.860 $3,999,878.100 $4,018,332.000