REMOVING CONC (SIDEWALKS)
|
SY
|
14.000
|
$28.270
|
$50.000
|
$100.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
10.000
|
$27.060
|
$30.000
|
$100.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
265.000
|
$19.620
|
$28.000
|
$30.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
58.000
|
$206.550
|
$55.000
|
$100.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
SY
|
229.000
|
$5.250
|
$450.000
|
$85.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
18.000
|
$58.590
|
$100.000
|
$100.000
|
|
|
BACKFILL (TY B)
|
STA
|
3.000
|
$277.000
|
$375.000
|
$650.000
|
|
|
BLOCK SODDING
|
SY
|
120.000
|
$100.000
|
$7.750
|
$10.000
|
|
|
VEGETATIVE WATERING
|
MG
|
3.000
|
$2,000.000
|
$500.000
|
$500.000
|
|
|
LANDSCAPE EDGE
|
LF
|
24.000
|
$50.000
|
$36.500
|
$50.000
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
29,433.000
|
$6.000
|
$3.500
|
$12.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
21.000
|
$532.280
|
$350.000
|
$350.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
18.000
|
$19.810
|
$20.000
|
$10.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
10.000
|
$418.930
|
$475.000
|
$450.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
40.000
|
$569.350
|
$720.000
|
$800.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
3.000
|
$1,500.000
|
$2,300.000
|
$1,500.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
18.000
|
$90.000
|
$115.000
|
$105.000
|
|
|
INLET (COMPL)(PCO)(5FT)(NONE)
|
EA
|
1.000
|
$8,687.580
|
$7,500.000
|
$12,500.000
|
|
|
REMOVE STR (JUNCTION BOX)
|
EA
|
1.000
|
$1,800.000
|
$1,000.000
|
$2,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$174,722.000
|
$220,000.000
|
$250,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$9,339.640
|
$16,000.000
|
$8,500.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
20.000
|
$4.330
|
$6.500
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
20.000
|
$1.420
|
$2.500
|
$9.000
|
|
|
COLORED TEXTURED CONC (6")
|
SY
|
1,334.000
|
$150.000
|
$165.000
|
$165.000
|
|
|
CONC CURB (TY II)
|
LF
|
6,863.000
|
$25.000
|
$50.000
|
$50.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
318.000
|
$35.000
|
$62.000
|
$65.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
10.000
|
$114.000
|
$110.000
|
$95.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
28.000
|
$116.260
|
$90.000
|
$75.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
2.000
|
$2,784.850
|
$1,800.000
|
$3,250.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
65.000
|
$19.600
|
$22.000
|
$30.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
30.000
|
$26.510
|
$24.000
|
$30.000
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
195.000
|
$42.870
|
$42.000
|
$60.000
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
20.000
|
$27.760
|
$30.000
|
$35.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
1,120.000
|
$2.730
|
$3.250
|
$4.000
|
|
|
TRAY CABLE (3 CONDR) (12 AWG)
|
LF
|
1,055.000
|
$3.000
|
$3.000
|
$4.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
8.000
|
$10.000
|
$1,200.000
|
$1,500.000
|
|
|
REMOVE GROUND BOX
|
EA
|
1.000
|
$359.320
|
$300.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$452.810
|
$683.500
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM (INST SIGN ONLY)
|
EA
|
1.000
|
$185.900
|
$305.500
|
$1,550.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
5,947.000
|
$2.550
|
$0.480
|
$6.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
362.000
|
$1.500
|
$1.650
|
$4.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
2,982.000
|
$1.610
|
$1.250
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
521.000
|
$9.640
|
$13.750
|
$12.000
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
21.000
|
$63.500
|
$185.000
|
$250.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
15.000
|
$212.280
|
$210.000
|
$250.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
|
EA
|
24.000
|
$212.230
|
$50.000
|
$250.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
1,814.000
|
$1.180
|
$0.990
|
$3.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
7,258.000
|
$1.630
|
$0.980
|
$2.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
7,258.000
|
$1.020
|
$0.980
|
$2.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
97.000
|
$6.140
|
$7.450
|
$6.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
141.000
|
$5.990
|
$7.450
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
865.000
|
$5.510
|
$4.000
|
$10.000
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
3.000
|
$32,293.960
|
$15,000.000
|
$30,000.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$8,000.000
|
$6,500.000
|
$10,000.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
22.000
|
$339.990
|
$380.000
|
$400.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
5.000
|
$340.530
|
$380.000
|
$400.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
22.000
|
$360.160
|
$380.000
|
$400.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
10.000
|
$340.310
|
$380.000
|
$400.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
22.000
|
$352.020
|
$380.000
|
$400.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
7.000
|
$342.720
|
$380.000
|
$400.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
6.000
|
$840.760
|
$650.000
|
$1,500.000
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)
|
EA
|
3.000
|
$166.560
|
$250.000
|
$300.000
|
|
|
BACKPLATE W/REFL BRDR(5 SEC)
|
EA
|
2.000
|
$170.490
|
$275.000
|
$300.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)
|
EA
|
22.000
|
$147.440
|
$200.000
|
$300.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(3 CONDR)
|
LF
|
470.000
|
$1.910
|
$3.000
|
$4.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
|
LF
|
1,228.000
|
$3.160
|
$3.250
|
$4.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
309.000
|
$3.450
|
$4.000
|
$5.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(9 CONDR)
|
LF
|
1,060.000
|
$3.650
|
$5.000
|
$6.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(12 CONDR)
|
LF
|
295.000
|
$100.000
|
$6.000
|
$7.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM
|
EA
|
1.000
|
$16,825.480
|
$21,500.000
|
$25,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')
|
EA
|
1.000
|
$33,000.000
|
$40,000.000
|
$50,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')LUM
|
EA
|
1.000
|
$33,412.030
|
$42,000.000
|
$51,000.000
|
|
|
REPLACE OF GROUND BOXES
|
EA
|
3.000
|
$700.000
|
$1,500.000
|
$2,000.000
|
|
|
REMOVAL OF CABLES
|
LF
|
2,558.000
|
$3.260
|
$2.000
|
$3.000
|
|
|
REMOVAL OF SIGNAL HEAD ASSM
|
EA
|
10.000
|
$185.290
|
$400.000
|
$500.000
|
|
|
REMOVAL OF TRAFFIC SIGNAL POLE FND
|
LF
|
3.000
|
$683.060
|
$1,500.000
|
$5,000.000
|
|
|
REMOVAL OF SIGNAL POLE ASSM
|
EA
|
1.000
|
$1,638.220
|
$3,500.000
|
$1,000.000
|
|
|
RELOCATE OF PEDESTRIAN PUSH BUTTON
|
EA
|
1.000
|
$100.000
|
$500.000
|
$1,000.000
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
101.000
|
$190.000
|
$200.000
|
$200.000
|
|
|
D-GR HMA TY-C SAC-B PG64-28
|
TON
|
3,263.000
|
$167.570
|
$130.000
|
$150.000
|
|
|
BONDING COURSE
|
GAL
|
227.000
|
$5.000
|
$11.000
|
$11.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$15,000.000
|
$15,000.000
|
$18,500.000
|
|
|
ITS COM CBL (ETHERNET)
|
LF
|
130.000
|
$6.160
|
$4.000
|
$4.000
|
|
|
RELOCATE CCTV FIELD EQUIPMENT
|
EA
|
1.000
|
$5,010.510
|
$1,200.000
|
$2,500.000
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
1.000
|
$9,083.720
|
$7,500.000
|
$10,000.000
|
|
|
VID IMAGE AND RADAR COM CABLE (COAX)
|
LF
|
1,506.000
|
$2.400
|
$3.250
|
$4.000
|
|
|
TMA (STATIONARY)
|
DAY
|
96.000
|
$167.600
|
$170.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
96.000
|
$369.280
|
$475.000
|
$550.000
|
|
|
RELOCATE EXIST RADAR VEH SENSING DEVICE
|
EA
|
2.000
|
$150.000
|
$1,200.000
|
$2,500.000
|
|
|
VIVDS CABLING
|
LF
|
615.000
|
$3.090
|
$3.000
|
$3.500
|
|
|
VIVDS CAM ASSY (INSTALL ONLY)
|
EA
|
1.000
|
$1,150.720
|
$1,200.000
|
$2,500.000
|
|
Totals: |
$1,961,095.400
|
$2,085,075.750
|
$2,530,678.500
|