Show Job Controls
Bid Cobra

KNOX SH 6 (0098-04-036)

Items: 31

County: KNOX
Length: N/A
Highway: SH 6
District: CHILDRESS
Control Number: 0098-04-036
DBE Goal: N/A
Project: F 2023(051)
Guaranty: N/A
Time: 50 WORKING DAYS
Engineer's Estimate: $3,159,340.45
Date: 09/08/2022 (3 years ago)
Contract Number: N/A
Type: REHABILITATION OF EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$3,159,340.45
$2,633,873.99
Over/Under Est: -16.63% -$525,466.46
$2,695,119.08
Over/Under Est: -14.69% -$464,221.37
Amt Left: 2.33% $61,245.09
$3,098,170.46
Over/Under Est: -1.94% -$61,169.99
Amt Left: 17.63% $464,296.47
Delta: -14.95% -$403,051.38

Bid Items & Bid Tabulations

31 Total 0 of 31
KNOX  |  SH 6  |  CHILDRESS  |  0098-04-036  |  09/08/2022  |  $3,159,340.45  |  F 2023(051)  |  REHAB OF EXIST ROADWAY  |  50 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ZACK BURKETT CO.
A. L. HELMCAMP, INC.
DUININCK, INC.
BACKFILL (TY A OR B)
STA 220.000 $200.000 $175.000 $130.000 $145.430
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 10.120 $570.000 $944.000 $510.000 $535.000
VEGETATIVE WATERING
MG 824.000 $13.500 $50.000 $2.000 $38.500
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 9,795.000 $4.150 $5.310 $4.000 $4.050
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 9,733.000 $30.000 $30.500 $28.000 $29.330
PLANE ASPH CONC PAV(0" TO 2")
SY 1,956.000 $5.000 $4.000 $7.500 $8.600
MOBILIZATION
LS 1.000 $261,320.000 $140,000.000 $190,000.000 $309,816.960
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $12,000.000 $2,030.000 $6,500.000 $15,000.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 350.000 $5.100 $8.260 $6.000 $6.300
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 39,278.000 $0.200 $0.300 $0.200 $0.120
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 19,639.000 $0.200 $0.300 $0.200 $0.320
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $4,200.000 $4,563.000 $5,500.000 $4,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $450.000 $354.000 $550.000 $330.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $1,000.000 $1,239.000 $2,000.000 $1,200.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 638.000 $0.900 $1.000 $1.000 $1.200
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,871.000 $0.900 $1.000 $1.000 $1.200
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 2.000 $300.000 $326.860 $510.000 $530.000
REFL PAV MRK TY II (W) 4" (DOT)
LF 253.000 $0.700 $1.420 $1.100 $1.100
REFL PAV MRK TY II (Y) 4" (BRK)
LF 3,130.000 $0.450 $0.300 $0.380 $0.380
REFL PAV MRK TY II (Y) 4" (SLD)
LF 19,564.000 $0.400 $0.300 $0.330 $0.330
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 2,120.000 $0.500 $0.570 $0.540 $0.550
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 42,900.000 $0.400 $0.570 $0.440 $0.450
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 3,130.000 $0.500 $0.570 $0.540 $0.550
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 19,564.000 $0.400 $0.570 $0.440 $0.450
REFL PAV MRKR TY I-C
EA 106.000 $5.000 $5.900 $5.300 $5.500
REFL PAV MRKR TY II-A-A
EA 384.000 $5.000 $5.900 $5.300 $5.500
D-GR HMA TY-D SAC-A PG70-28
TON 14,920.000 $155.000 $125.250 $131.000 $145.000
TACK COAT
GAL 12,103.000 $3.500 $5.500 $4.500 $3.900
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,500.000 $4,500.000 $10,000.000 $11,000.000
TMA (STATIONARY)
DAY 30.000 $185.000 $100.000 $200.000 $275.000
TMA (MOBILE OPERATION)
DAY 12.000 $225.000 $1.000 $200.000 $1,000.000
Totals: $3,159,340.450 $2,633,873.990 $2,695,119.080 $3,098,170.460