Show Job Controls
Bid Cobra

KLEBERG VARIOUS (0916-02-025)

Items: 39

County: KLEBERG
Length: 0.0000 MILES
Highway: VARIOUS
District: CORPUS CHRISTI
Control Number: 0916-02-025
DBE Goal: 0.0%
Project: STP 2B23(117)TAPS
Guaranty: $29,000.00
Time: 151 WORKING DAYS
Engineer's Estimate: $1,426,805.10
Date: 05/07/2026 (4 weeks ago)
Contract Number: 5263228
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00185350
Contract Type: Federal
Project Description: CONST. A 6-FT-WIDE SIDEWALK & BUFFERED BICYCLE LANES ALONG S ARMSTRONG ST, 10-FT-WIDE SHARED USE PATH, A 6-FT-WIDE SIDEWALK ALONG W JOHNSTON AVE, 10’ WIDE SHARED USE PATH ALONG CAESAR AVE. INTERS. IMPROV. INCLUDE HIGH-VISIBILITY CROSSWALK&CURB RAMPS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
ROBERTO A JIMENEZ
LUCIA ADAME
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (8)
E
Engineer's Estimate
$1,426,805.10
1
$1,171,488.51
Over/Under Est: -17.89% -$255,316.59
Over/Under Est: -16.92% -$241,485.75
Amt Left: 1.18% $13,830.84
Over/Under Est: -10.89% -$155,375.87
Amt Left: 8.53% $99,940.72
Delta: -7.26% -$86,109.88
$1,301,351.88
Over/Under Est: -8.79% -$125,453.22
Amt Left: 11.09% $129,863.37
Delta: -2.35% -$29,922.65
$1,392,339.18
Over/Under Est: -2.42% -$34,465.92
Amt Left: 18.85% $220,850.67
Delta: -6.99% -$90,987.30
$1,433,104.68
Over/Under Est: 0.44% $6,299.58
Amt Left: 22.33% $261,616.17
Delta: -2.93% -$40,765.50
$1,840,850.25
Over/Under Est: 29.02% $414,045.15
Amt Left: 57.14% $669,361.74
Delta: -28.45% -$407,745.57
Over/Under Est: 56.71% $809,088.03
Amt Left: 90.86% $1,064,404.62
Delta: -21.46% -$395,042.88

Bid Items & Bid Tabulations

39 Total 0 of 39
KLEBERG  |  VARIOUS  |  CORPUS CHRISTI  |  0916-02-025  |  05/07/2026  |  $1,426,805.10  |  STP 2B23(117)TAPS  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  151 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
3LW CIVIL LLC
GARRET SHIELDS INFRASTRUCTURE
LUCANIA CONTRACTORS LLC
TI-ZACK CONCRETE, LLC
ICOS MANAGEMENT, LLC
STX CIVIL
ARTILLERY L.L.C.
O. TREVINO CONSTRUCTION, LLC
REMOV CONC (DRIVEWAYS)
SY 264.000 $38.000 $30.000 $20.000 $20.000 $30.230 $7.350 $15.650 $27.000 $81.000
REMOV CONC (CURB & GUTTER)
LF 1,085.000 $31.000 $12.000 $10.000 $8.000 $7.350 $3.150 $10.670 $15.000 $24.000
FURN & PLACE TOPSOIL (4")
SY 1,645.000 $10.000 $4.250 $4.000 $7.000 $10.400 $12.600 $1.840 $20.000 $1.500
BLOCK SODDING
SY 1,645.000 $7.000 $8.500 $8.000 $13.750 $5.000 $7.350 $6.540 $30.000 $10.000
VEGETATIVE WATERING
TGL 27.000 $300.000 $150.000 $20.000 $10.000 $1.000 $42.000 $44.870 $200.000 $25.000
TRENCH EXCAVATION PROTECTION
LF 659.000 $25.000 $20.000 $1.000 $5.000 $10.000 $5.250 $5.060 $10.000 $7.000
RC PIPE (CL III)(24 IN)
LF 659.000 $215.000 $88.480 $120.000 $140.000 $126.220 $126.000 $137.850 $150.000 $175.000
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 5.000 $6,000.000 $8,659.300 $5,000.000 $8,000.000 $5,985.000 $7,350.000 $9,971.870 $8,000.000 $9,443.000
MOBILIZATION
LS 1.000 $102,000.000 $117,000.000 $100,000.000 $93,000.000 $122,976.000 $69,750.000 $117,122.390 $250,000.000 $223,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $3,000.000 $8,282.070 $5,000.000 $1,700.000 $3,200.000 $1.000 $4,987.030 $4,500.000 $7,700.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 56.000 $200.000 $0.100 $1.000 $300.000 $1.000 $262.500 $87.320 $300.000 $230.000
TMA (STATIONARY)
DAY 180.000 $80.000 $0.100 $300.000 $300.000 $1.000 $262.500 $167.740 $600.000 $225.000
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 880.000 $5.000 $0.100 $5.000 $7.000 $0.100 $8.400 $8.030 $12.000 $7.150
BIODEG EROSN CONT LOGS (REMOVE)
LF 880.000 $2.000 $0.100 $1.000 $2.000 $0.100 $2.100 $0.050 $3.000 $2.120
CONC CURB & GUTTER (TY II)
LF 2,979.000 $55.000 $42.000 $20.000 $38.000 $47.140 $42.000 $58.870 $50.000 $73.000
DRIVEWAYS (CONC)
SY 514.000 $130.000 $110.340 $100.000 $90.000 $104.870 $210.000 $132.870 $108.000 $179.000
CONC SIDEWALKS (6")
SY 5,876.000 $80.000 $76.270 $80.000 $85.000 $90.400 $78.750 $99.800 $99.000 $168.000
CURB RAMPS (TY 2)
EA 3.000 $3,000.000 $1,720.310 $2,500.000 $2,000.000 $2,365.180 $3,990.000 $2,107.520 $3,500.000 $3,547.000
CURB RAMPS (TY 3)
EA 11.000 $2,800.000 $1,720.310 $2,500.000 $2,000.000 $2,365.180 $3,990.000 $2,107.520 $3,500.000 $3,655.000
CURB RAMPS (TY 5)
EA 1.000 $3,500.000 $1,720.310 $2,500.000 $2,000.000 $2,365.180 $3,990.000 $2,107.520 $4,000.000 $5,538.000
CURB RAMPS (TY 6)
EA 1.000 $3,500.000 $1,720.310 $2,500.000 $2,000.000 $2,365.180 $3,990.000 $2,107.520 $3,500.000 $4,585.000
CURB RAMPS (TY 7)
EA 49.000 $2,500.000 $1,577.040 $2,500.000 $2,000.000 $2,365.180 $3,675.000 $2,107.520 $3,500.000 $3,785.000
CURB RAMPS (TY 10)
EA 3.000 $3,000.000 $1,720.310 $2,500.000 $2,000.000 $2,365.180 $4,200.000 $2,107.520 $3,500.000 $3,710.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 40.000 $500.000 $693.000 $500.000 $700.000 $715.000 $945.000 $684.250 $1,000.000 $667.320
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 56.000 $250.000 $115.500 $300.000 $130.000 $80.000 $157.500 $126.870 $300.000 $111.220
RELOCATE SM RD SN SUP&AM TY S80
EA 16.000 $400.000 $693.000 $300.000 $750.000 $350.000 $840.000 $697.140 $500.000 $667.320
REMOVE SM RD SN SUP&AM
EA 17.000 $150.000 $93.500 $100.000 $100.000 $151.500 $105.000 $90.070 $200.000 $90.040
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
LF 923.000 $1.000 $2.200 $2.500 $2.500 $0.750 $0.970 $2.000 $3.000 $2.120
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 1,495.000 $5.000 $8.250 $8.000 $9.500 $9.500 $10.800 $7.500 $9.000 $7.960
REFL PAV MRK TY I (W)(BIKE ARW)(090MIL)
EA 15.000 $240.000 $82.500 $90.000 $94.000 $150.000 $172.800 $75.000 $100.000 $79.440
REFL PAV MRK TY I(W)(BIKE SYML)(090MIL)
EA 15.000 $270.000 $176.000 $180.000 $200.000 $175.000 $168.000 $160.000 $200.000 $169.480
PAVEMENT SLER 6"
LF 20,439.000 $2.000 $0.350 $0.500 $0.400 $0.450 $0.630 $0.320 $0.500 $0.340
PAVEMENT SLER 24"
LF 1,495.000 $4.000 $0.970 $1.000 $1.100 $3.250 $4.200 $0.880 $1.250 $0.940
PAVEMENT SLER (BIKE ARROW)
EA 15.000 $5.000 $38.500 $40.000 $43.750 $35.000 $42.000 $35.000 $75.000 $37.080
PAVEMENT SLER (BIKE SYMBOL)
EA 15.000 $5.000 $38.500 $40.000 $43.750 $40.000 $52.500 $35.000 $75.000 $37.080
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 6,821.000 $0.600 $0.750 $0.750 $0.850 $0.750 $1.100 $0.680 $1.000 $0.730
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 12,695.000 $0.500 $0.280 $0.600 $0.650 $0.750 $1.050 $0.520 $1.000 $0.560
ELIM EXT PM & MRKS (24")
LF 631.000 $2.000 $1.650 $1.600 $1.880 $5.000 $6.300 $1.500 $3.000 $1.590
TREE REMOVAL (4" - 12" DIA)
EA 11.000 $400.000 $250.000 $500.000 $1,000.000 $1,000.000 $650.000 $82.670 $1,000.000 $1,463.870
Totals: $1,426,805.100 $1,171,488.510 $1,185,319.350 $1,271,429.230 $1,301,351.880 $1,392,339.180 $1,433,104.680 $1,840,850.250 $2,235,893.130
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $4,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
Total: $14,000.00