Items: 71

County: KLEBERG
Length: N/A
Highway: SH 141
District: CORPUS CHRISTI
Control Number: 0383-04-061
DBE Goal: N/A
Project: STP 1802(405)
Guaranty: N/A
Time: 174 WORKING DAYS
Engineer's Estimate: $3,390,739.54
Date: 07/10/2018 (7 years ago)
Contract Number: N/A
Type: MISCELLANEOUS CONSTRUCTION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$3,390,739.54
$3,087,010.92
Over/Under Est: -8.96% -$303,728.62
$3,479,585.14
Over/Under Est: 2.62% $88,845.60
Amt Left: 12.72% $392,574.22
$4,268,269.30
Over/Under Est: 25.88% $877,529.76
Amt Left: 38.27% $1,181,258.38
Delta: -22.67% -$788,684.16
Over/Under Est: 31.49% $1,067,640.17
Amt Left: 44.42% $1,371,368.79
Delta: -4.45% -$190,110.41
$4,607,082.64
Over/Under Est: 35.87% $1,216,343.10
Amt Left: 49.24% $1,520,071.72
Delta: -3.34% -$148,702.93

Bid Items & Bid Tabulations

71 Total 0 of 71
KLEBERG  |  SH 141  |  CORPUS CHRISTI  |  0383-04-061  |  07/10/2018  |  $3,390,739.54  |  STP 1802(405)  |  MISCELLANEOUS CONSTRUCTION  |  174 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TI-ZACK CONCRETE, INC.
ENCINO LANDSCAPE, INC.
SJ&J CONSTRUCTION, LLC
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
FNH CONSTRUCTION, LLC
PREPARING ROW(TREE)(5" TO 12" DIA)
EA 1.000 $250.000 $1,000.000 $1,000.000 $200.000 $2,094.850 $5,000.000
REMOVING CONC (FOUNDATIONS)
SY 7.000 $1,000.000 $35.000 $50.000 $120.000 $449.320 $1,000.000
REMOVING CONC (DRIVEWAYS)
SY 9,446.000 $10.000 $10.000 $20.000 $7.000 $16.650 $17.500
REMOVING CONC (CURB OR CURB & GUTTER)
LF 7,452.000 $4.000 $5.000 $7.000 $6.000 $4.220 $12.500
REMOVING CONC (SIDEWALK OR RAMP)
SY 456.000 $10.000 $25.000 $20.000 $8.000 $17.240 $20.000
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 1,123.000 $10.000 $15.000 $10.000 $18.000 $13.740 $20.000
EXCAVATION (SPECIAL)
CY 660.000 $20.000 $10.000 $15.000 $35.000 $31.020 $30.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 351.000 $7.500 $25.000 $30.000 $53.000 $9.550 $50.000
FURNISHING AND PLACING TOPSOIL (4")
SY 9,110.000 $2.000 $3.000 $3.000 $3.000 $2.530 $8.000
BLOCK SODDING
SY 9,110.000 $5.000 $4.000 $5.000 $6.000 $5.940 $8.000
VEGETATIVE WATERING
MG 318.980 $35.000 $1.000 $30.000 $10.000 $54.320 $68.000
D-GR HMA(SQ) TY-C PG76-22
TON 150.000 $150.000 $200.000 $300.000 $160.000 $204.190 $160.000
PLANE ASPH CONC PAV(0" TO 4")
SY 249.000 $5.000 $25.000 $10.000 $8.000 $47.450 $20.000
CONC PAV (JOINT REINF) (10")
SY 416.000 $60.000 $100.000 $100.000 $120.000 $242.080 $150.000
CL A CONC (MISC)
CY 21.000 $540.000 $1,000.000 $800.000 $1,500.000 $763.240 $1,500.000
CL C CONC (MISC)
CY 3.400 $750.000 $1,100.000 $1,000.000 $1,500.000 $1,376.480 $1,500.000
CL A CONC (STEPS)
CY 2.000 $1,000.000 $1,000.000 $2,000.000 $1,500.000 $2,018.150 $1,500.000
CONC STR REPAIR (STANDARD)
SF 156.000 $200.000 $25.000 $20.000 $120.000 $95.740 $500.000
RIPRAP (CONC)(6 IN)
CY 23.700 $550.000 $650.000 $600.000 $700.000 $924.850 $650.000
CMP (GAL STL 18 IN)
LF 12.000 $50.000 $85.000 $100.000 $70.000 $175.800 $85.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 2.000 $1,000.000 $1,500.000 $1,000.000 $990.000 $1,187.790 $1,850.000
GRATE & FRAME
EA 12.000 $2,500.000 $1,000.000 $2,000.000 $2,400.000 $8,015.300 $3,000.000
ADJUSTING MANHOLES
EA 7.000 $1,000.000 $550.000 $1,500.000 $400.000 $3,780.410 $1,500.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 24.000 $500.000 $150.000 $500.000 $200.000 $1,615.300 $750.000
ADJUSTING MANHOLES (WATER METER)
EA 3.000 $250.000 $150.000 $500.000 $400.000 $1,076.870 $750.000
REMOV STR (SET)
EA 1.000 $500.000 $150.000 $1,000.000 $400.000 $345.380 $2,500.000
MOBILIZATION
LS 1.000 $342,936.990 $100,000.000 $430,000.000 $400,000.000 $743,057.880 $400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $3,500.000 $1,500.000 $3,000.000 $4,000.000 $2,482.700 $8,500.000
SANDBAGS FOR EROSION CONTROL
EA 2,001.000 $4.000 $0.100 $1.000 $2.250 $14.820 $6.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,001.000 $3.000 $0.100 $3.000 $2.250 $3.230 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,001.000 $1.000 $0.100 $1.000 $1.000 $0.780 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,001.000 $8.000 $0.100 $6.000 $6.000 $4.920 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,001.000 $2.000 $0.100 $1.000 $1.000 $1.220 $8.000
CONC CURB (TY II)
LF 93.000 $20.000 $35.000 $30.000 $12.000 $38.690 $35.000
CONC CURB & GUTTER (TY II)
LF 7,598.000 $30.000 $30.000 $35.000 $14.000 $18.200 $30.000
DRIVEWAYS (CONC)
SY 10,240.000 $80.000 $75.000 $70.000 $90.000 $71.310 $75.000
DRIVEWAYS (ACP)
SY 565.000 $30.000 $54.000 $50.000 $60.000 $79.350 $45.000
DRIVEWAYS (BASE)
SY 510.000 $25.000 $25.000 $30.000 $40.000 $35.450 $35.000
CONC SIDEWALKS (4")
SY 11,653.000 $50.000 $70.000 $50.000 $70.000 $51.320 $55.000
CONC SIDEWALKS (5")
SY 279.000 $55.000 $70.000 $60.000 $70.000 $73.050 $70.000
CONC SIDEWALKS (6")
SY 157.000 $60.000 $70.000 $70.000 $65.000 $118.330 $80.000
CURB RAMPS (TY 1)
SY 391.000 $100.000 $95.000 $100.000 $150.000 $141.760 $165.000
CURB RAMPS (TY 2)
SY 631.000 $100.000 $95.000 $100.000 $150.000 $168.620 $165.000
CURB RAMPS (TY 3)
SY 1,469.000 $100.000 $95.000 $100.000 $150.000 $150.290 $165.000
CURB RAMPS (TY 5)
SY 107.000 $100.000 $95.000 $100.000 $150.000 $150.540 $165.000
CURB RAMPS (TY 6)
SY 898.000 $100.000 $95.000 $100.000 $150.000 $194.010 $165.000
CURB RAMPS (TY 7)
SY 934.000 $100.000 $95.000 $100.000 $150.000 $191.270 $165.000
CURB RAMPS (TY 10)
SY 145.000 $100.000 $95.000 $100.000 $150.000 $201.240 $165.000
CONC SIDEWALKS (SPECIAL) (TYPE B)
SY 862.000 $95.000 $110.000 $100.000 $150.000 $89.240 $85.000
RIGHT OF WAY MARKERS
EA 3.000 $350.000 $115.000 $100.000 $1,000.000 $1,965.850 $550.000
CONDT (PVC) (SCH 80) (3")
LF 60.000 $15.000 $20.000 $50.000 $15.000 $34.940 $15.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 116.000 $33.000 $25.000 $60.000 $70.000 $64.800 $40.000
ELEC CONDR (NO.6) BARE
LF 40.000 $2.000 $25.000 $10.000 $6.000 $2.930 $4.000
GROUND BOX TY C (162911)
EA 46.000 $1,000.000 $600.000 $800.000 $1,200.000 $1,235.290 $650.000
GROUND BOX TY C (162911)W/APRON
EA 3.000 $1,100.000 $850.000 $1,000.000 $1,800.000 $1,274.700 $850.000
REMOVE GROUND BOX
EA 49.000 $300.000 $50.000 $100.000 $150.000 $176.590 $250.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 72.000 $350.000 $150.000 $500.000 $400.000 $371.550 $650.000
REMOVE SM RD SN SUP&AM
EA 2.000 $60.000 $150.000 $100.000 $100.000 $179.540 $350.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 5,099.000 $6.000 $4.400 $6.000 $14.000 $4.420 $16.000
PAVEMENT SEALER 24"
LF 5,099.000 $2.000 $1.000 $1.000 $1.000 $0.870 $8.000
ELIM EXT PAV MRK & MRKS (12")
LF 5,242.000 $1.000 $3.000 $5.000 $2.000 $2.240 $8.000
ELIM EXT PAV MRK & MRKS (24")
LF 1,724.000 $1.000 $4.000 $8.000 $2.000 $3.020 $8.000
PAV SURF PREP FOR MRK (24")
LF 5,099.000 $1.250 $0.150 $0.250 $2.000 $0.180 $8.000
RELOCATE RDSD FLASH BEACON ASSEMBLY
EA 3.000 $5,000.000 $4,000.000 $5,000.000 $500.000 $1,358.780 $12,500.000
PED POLE ASSEMBLY
EA 1.000 $2,000.000 $1,500.000 $2,000.000 $500.000 $6,079.090 $6,500.000
PED DETECT PUSH BUTTON (STANDARD)
EA 78.000 $400.000 $250.000 $300.000 $600.000 $774.670 $850.000
INSTALL OF VEHICLE DETECTORS
LF 9,999.000 $5.000 $0.010 $0.010 $12.000 $8.480 $12.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 78.000 $90.000 $50.000 $100.000 $100.000 $289.920 $500.000
RETROFIT DET WARN SURF(SURF APP OR CIP)
EA 7.000 $500.000 $500.000 $300.000 $600.000 $2,783.240 $2,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $10,000.000 $200.000 $2,000.000 $15,000.000 $10,643.920 $12,500.000
TMA (STATIONARY)
EA 6.000 $5,000.000 $3,500.000 $5,000.000 $20,000.000 $13,393.920 $2,000.000
Totals: $3,390,739.540 $3,087,010.920 $3,479,585.140 $4,268,269.300 $4,458,379.721 $4,607,082.640