Show Job Controls
Bid Cobra

KIMBLE US0377 (6474-39-001)

Items: 43

County: KIMBLE
Length: 0.0100 MILES
Highway: US0377
District: SAN ANGELO
Control Number: 6474-39-001
DBE Goal: 0.0%
Project: RMC - A00212377
Guaranty: $0.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $523,020.00
Date: 04/16/2026 (7 weeks ago) Changed
Contract Number: 4260703
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00212377
Project Description: MBGF AND CABLE BARRIER REPAIR
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: MAINTENANCE CONTRACT OFFICE
4502 KNICKERBOCKER RD, SAN ANGELO, TX 76904
JORDAN SEFCIK
BANKS PHILIPP
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$523,020.00
$403,154.00
Over/Under Est: -22.92% -$119,866.00
Over/Under Est: -21.7% -$113,503.00
Amt Left: 1.58% $6,363.00
Over/Under Est: -20.97% -$109,690.00
Amt Left: 2.52% $10,176.00
Delta: -0.93% -$3,813.00
Over/Under Est: 61.47% $321,513.00
Amt Left: 109.48% $441,379.00
Delta: -104.32% -$431,203.00

Bid Items & Bid Tabulations

43 Total 0 of 43
KIMBLE  |  US0377  |  SAN ANGELO  |  6474-39-001  |  04/16/2026  |  $523,020.00  |  RMC - A00212377  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
T&L CLEANING SERVICES LLC
ROSS SA ENTERPRISE LLC
BLUE CHIP SERVICES, LLC
APACHE BARRICADE & SIGN
REMOV CONC (RIPRAP)
SY 10.000 $20.000 $50.000 $0.000 $1.000 $0.000
RIPRAP (CONC)(4 IN)
CY 3.000 $500.000 $50.000 $0.000 $400.000 $0.000
RIPRAP (MOW STRIP)(4 IN)
CY 10.000 $400.000 $300.000 $0.000 $350.000 $0.000
MOBILIZATION (CALLOUT)
EA 12.000 $100.000 $1.000 $1.000 $500.000 $7,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 20.000 $100.000 $0.000 $0.000 $0.000 $225.000
TMA (STATIONARY)
DAY 85.000 $200.000 $0.000 $0.000 $0.000 $525.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,500.000 $35.000 $28.000 $0.000 $30.000 $35.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 30.000 $20.000 $50.000 $0.000 $20.000 $92.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 1.000 $200.000 $500.000 $1.000 $250.000 $1,400.000
MTL BM GD FEN TRANS (31"-28")
EA 30.000 $500.000 $100.000 $1.000 $100.000 $1,100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 30.000 $2.000 $10.000 $30.000 $50.000 $17.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 160.000 $10.000 $20.000 $30.000 $10.000 $17.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 30.000 $2.000 $10.000 $30.000 $1.000 $17.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 5,500.000 $30.000 $24.000 $0.000 $20.000 $22.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 50.000 $35.000 $20.000 $0.000 $30.000 $65.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 4.000 $35.000 $200.000 $150.000 $1,600.000 $475.000
REPLACE TIMBER POST W/O CONC FND
EA 100.000 $30.000 $20.000 $40.000 $100.000 $150.000
REPLACE STEEL POST W/O CONC FND
EA 160.000 $65.000 $20.000 $110.000 $60.000 $150.000
REPLACE TIMBER POST W/ CONC FND
EA 240.000 $30.000 $20.000 $40.000 $100.000 $145.000
REPLACE STEEL POST W/ CONC FND
EA 20.000 $100.000 $20.000 $500.000 $120.000 $175.000
REALIGN POSTS
EA 60.000 $30.000 $10.000 $1.000 $1.000 $24.000
REPLACE TERMINAL ANCHOR POSTS
EA 2.000 $40.000 $100.000 $1.000 $300.000 $1,200.000
REM OBSOLETE GET & REPL W/ SGT
EA 18.000 $4,000.000 $5,000.000 $5,000.000 $1,500.000 $4,100.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 20.000 $1,500.000 $1,000.000 $300.000 $1,800.000 $1,700.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 800.000 $35.000 $30.000 $0.000 $30.000 $140.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 32.000 $60.000 $100.000 $85.000 $30.000 $75.000
REPLACE BLOCKOUT
EA 450.000 $10.000 $5.000 $20.000 $14.000 $20.000
REPAIR STEEL POST WITH BASE PLATE
EA 2.000 $200.000 $250.000 $200.000 $100.000 $450.000
RESET SGT IMPACT HEAD
EA 10.000 $125.000 $1.000 $1.000 $1.000 $1,400.000
REPLACE SGT OBJECT MARKER
EA 4.000 $20.000 $1.000 $1.000 $1,200.000 $39.000
REPLACE SGT CABLE ANCHOR
EA 6.000 $78.000 $1.000 $1.000 $200.000 $175.000
REPLACE SGT CABLE ASSEMBLY
EA 6.000 $76.000 $1.000 $1.000 $200.000 $215.000
REPLACE SGT STRUT
EA 6.000 $76.000 $1.000 $1.000 $200.000 $130.000
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 4.000 $600.000 $1,500.000 $1,200.000 $1,800.000 $1,400.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 25.000 $40.000 $25.000 $0.000 $30.000 $39.000
REPLACE HINGED TOP SGT POST (STEEL)
EA 100.000 $100.000 $1.000 $100.000 $35.000 $190.000
REALIGN HINGED TOP SGT POST ((STEEL)
EA 10.000 $50.000 $60.000 $50.000 $1.000 $190.000
REPLACE POSTS (TL-4)(GIBRALTAR)
EA 200.000 $210.000 $160.000 $150.000 $120.000 $245.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 5.000 $100.000 $150.000 $1.000 $100.000 $245.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 6.000 $1,800.000 $1,800.000 $1,000.000 $1,500.000 $1,500.000
REPLACE CABLE (TL-4)
LF 1,000.000 $10.000 $0.010 $0.000 $15.000 $9.000
CHECK / RE-TENSION CABLE (TL-4)
EA 40.000 $200.000 $1.000 $1.000 $50.000 $145.000
REPLACE POST HARDWARE (TL-4)
EA 220.000 $50.000 $10.000 $60.000 $25.000 $145.000
Totals: $523,020.000 $392,569.000 $221,202.000 $397,580.000 $822,591.000