Show Job Controls
Bid Cobra

KIMBLE PW (0907-20-005)

Items: 56

County: KIMBLE
Length: N/A
Highway: PW
District: SAN ANGELO
Control Number: 0907-20-005
DBE Goal: N/A
Project: C 907-20-5
Guaranty: N/A
Time: 104 WORKING DAYS
Engineer's Estimate: $1,099,860.30
Date: 06/03/2021 (5 years ago)
Contract Number: N/A
Type: CONSTRUCT ACCESS ROADS AND PARKING
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (6)
E
Engineer's Estimate
$1,099,860.30
$1,196,977.80
Over/Under Est: 8.83% $97,117.50
Over/Under Est: 24.88% $273,689.42
Amt Left: 14.75% $176,571.92
Over/Under Est: 26.89% $295,717.34
Amt Left: 16.59% $198,599.84
Delta: -1.60% -$22,027.92
$1,437,333.83
Over/Under Est: 30.68% $337,473.53
Amt Left: 20.08% $240,356.03
Delta: -2.99% -$41,756.19
$1,475,464.15
Over/Under Est: 34.15% $375,603.85
Amt Left: 23.27% $278,486.35
Delta: -2.65% -$38,130.32
$2,486,464.50
Over/Under Est: 126.07% $1,386,604.20
Amt Left: 107.73% $1,289,486.70
Delta: -68.52% -$1,011,000.35

Bid Items & Bid Tabulations

56 Total 0 of 56
KIMBLE  |  PW  |  SAN ANGELO  |  0907-20-005  |  06/03/2021  |  $1,099,860.30  |  C 907-20-5  |  CONSTRUCT ACCESS ROADS AND PARKING  |  104 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DIAMOND X CONTRACTING, INC
ACME BRIDGE COMPANY, INC.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
REECE ALBERT, INC.
RELMCO, INC.
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 10.000 $1,500.000 $3,000.000 $6,000.000 $1,396.460 $6,985.000 $5,000.000 $10,000.000
REMOVING CONC (RIPRAP)
SY 27.000 $16.000 $32.000 $29.100 $39.720 $33.400 $50.000 $100.000
REMOVING STAB BASE & ASPH PAV (8"-19")
SY 2,656.000 $7.000 $8.500 $7.000 $12.610 $7.370 $10.000 $30.000
EXCAVATION (ROADWAY)
CY 2,843.000 $12.000 $14.000 $25.000 $19.590 $15.100 $25.000 $30.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 2,998.000 $40.000 $14.000 $60.000 $14.020 $40.830 $20.000 $35.000
COMPOST MANUF TOPSOIL (4")
SY 8,643.000 $1.200 $4.000 $4.400 $6.810 $5.080 $6.500 $20.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 8,643.000 $0.850 $1.200 $0.170 $0.190 $0.450 $0.180 $1.000
VEGETATIVE WATERING
MG 229.000 $14.000 $60.000 $35.600 $62.090 $20.540 $40.000 $100.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 8,643.000 $1.000 $2.000 $0.870 $0.920 $2.400 $0.950 $10.500
PROOF ROLLING
HR 8.000 $100.000 $62.000 $63.900 $81.570 $100.820 $100.000 $150.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
SY 8,890.000 $12.000 $15.000 $18.000 $17.700 $14.270 $25.000 $30.000
LIME (HYDRATED LIME (SLURRY))
TON 166.000 $190.000 $280.000 $275.000 $293.850 $334.920 $200.000 $300.000
LIME TRT (SUBGRADE)(8")
SY 9,930.000 $2.500 $5.000 $3.500 $3.100 $4.580 $6.000 $12.000
D-GR HMA(SQ) TY-C PG70-22
TON 1,449.000 $106.000 $108.000 $113.000 $119.470 $152.270 $100.000 $300.000
CONC PVMT (CONT REINF - CRCP) (9")
SY 956.000 $50.000 $145.000 $115.000 $156.440 $147.540 $165.000 $150.000
RIPRAP (CONC)(5 IN)
CY 158.000 $500.000 $482.000 $500.000 $602.590 $628.770 $425.000 $650.000
RC PIPE (ARCH)(CL III)(DES 5)
LF 306.000 $350.000 $256.000 $265.000 $373.790 $275.270 $375.000 $600.000
SET (TY II) (DES 5) (CMP) (4: 1) (C)
EA 10.000 $6,100.000 $6,600.000 $5,270.000 $10,069.850 $3,259.660 $7,351.400 $5,000.000
REMOV STR (SET)
EA 2.000 $300.000 $402.000 $505.000 $535.130 $333.770 $1,800.000 $500.000
MOBILIZATION
LS 1.000 $100,000.000 $85,000.000 $100,000.000 $134,870.890 $143,000.000 $125,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $4,900.000 $1,500.000 $6,000.000 $1,540.380 $1,482.600 $5,000.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 40.000 $35.000 $66.000 $61.600 $57.880 $50.490 $40.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 40.000 $11.000 $11.000 $21.200 $13.880 $23.790 $15.000 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 144.000 $25.000 $33.000 $24.400 $28.300 $38.320 $25.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 144.000 $8.000 $11.000 $2.100 $9.050 $14.540 $15.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,460.000 $3.000 $4.000 $3.100 $3.380 $3.770 $3.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,460.000 $0.750 $1.100 $1.050 $1.150 $0.640 $1.500 $2.000
CONC SIDEWALKS (4")
SY 789.000 $58.000 $83.000 $60.000 $75.430 $77.760 $60.000 $65.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 21.000 $500.000 $534.000 $517.000 $547.230 $606.360 $535.700 $850.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $900.000 $620.000 $599.000 $631.930 $702.230 $620.400 $850.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 5.000 $700.000 $561.000 $543.000 $574.730 $637.490 $563.200 $850.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 8.000 $85.000 $102.000 $98.700 $113.830 $115.790 $102.300 $100.000
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
EA 6.000 $10.250 $44.000 $42.500 $63.210 $49.800 $44.000 $500.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 900.000 $0.210 $2.200 $2.100 $2.330 $2.490 $2.200 $2.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 68.000 $5.500 $11.000 $10.600 $12.700 $12.450 $11.000 $5.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 785.000 $0.660 $2.200 $2.100 $2.350 $2.490 $2.200 $2.000
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
EA 15.000 $20.000 $54.000 $53.100 $62.690 $62.250 $55.000 $500.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 1,810.000 $1.000 $1.700 $1.600 $1.710 $1.870 $1.650 $2.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 144.000 $6.000 $8.000 $7.400 $8.500 $8.720 $7.700 $20.000
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 21.000 $35.000 $55.000 $53.100 $60.490 $62.250 $55.000 $500.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 354.000 $0.600 $3.000 $2.350 $2.750 $2.740 $2.420 $20.000
PAVEMENT SEALER 4"
LF 599.000 $0.200 $1.100 $1.050 $1.290 $1.250 $1.100 $1.000
PAVEMENT SEALER 8"
LF 84.000 $0.440 $2.200 $2.100 $3.570 $2.490 $2.200 $6.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 110.000 $0.340 $1.100 $1.050 $2.150 $1.250 $1.100 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 3,170.000 $0.350 $0.800 $0.800 $0.860 $0.930 $0.820 $1.000
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 340.000 $0.260 $1.100 $1.050 $1.440 $1.250 $1.100 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 2,629.000 $0.350 $0.800 $0.800 $0.870 $0.930 $0.820 $1.000
PRE PM TY B(ACC PRK)(BL&WH)(W/BORDR)LG
EA 3.000 $210.000 $550.000 $531.000 $588.430 $622.550 $550.000 $500.000
REFL PAV MRKR TY II-A-A
EA 60.000 $2.800 $16.000 $15.900 $18.420 $18.680 $16.500 $15.000
ELIM EXT PAV MRK & MRKS (4")
LF 560.000 $0.500 $2.200 $2.100 $2.410 $2.490 $2.200 $1.000
PAV SURF PREP FOR MRK (4")
LF 599.000 $0.180 $1.100 $1.050 $1.290 $1.250 $1.100 $1.000
PAV SURF PREP FOR MRK (8")
LF 84.000 $0.330 $1.100 $1.050 $2.470 $1.250 $1.100 $1.000
INSTALL OF PEDESTRIAN RAMPS
EA 4.000 $5,500.000 $1,700.000 $1,620.000 $3,167.970 $1,992.150 $2,200.000 $5,000.000
TREE PROTECTION
EA 48.000 $400.000 $110.000 $110.000 $177.010 $124.510 $550.000 $500.000
TACK COAT
GAL 533.000 $3.800 $5.000 $5.100 $8.360 $3.200 $8.000 $10.000
PRECAST CONCRETE WHEEL STOPS
EA 23.000 $240.000 $65.000 $189.000 $87.510 $161.660 $500.000 $500.000
Totals: $1,099,860.300 $1,196,977.800 $1,373,549.720 $1,395,577.640 $1,437,333.830 $1,475,464.150 $2,486,464.500