Show Job Controls
Bid Cobra

KIMBLE US 290 (0112-01-019)

Items: 60

County: KIMBLE
Length: N/A
Highway: US 290
District: SAN ANGELO
Control Number: 0112-01-019
DBE Goal: N/A
Project: STP 2020(906)HES
Guaranty: N/A
Time: 235 WORKING DAYS
Engineer's Estimate: $5,108,594.55
Date: 06/05/2020 (6 years ago)
Contract Number: N/A
Type: SAFETY TREAT FIXED OBJECTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$5,108,594.55
1
$4,234,053.38
Over/Under Est: -17.12% -$874,541.17
$4,718,546.50
Over/Under Est: -7.64% -$390,048.05
Amt Left: 11.44% $484,493.12
Over/Under Est: -5.22% -$266,650.40
Amt Left: 14.36% $607,890.77
Delta: -2.62% -$123,397.65
Over/Under Est: 1.85% $94,748.90
Amt Left: 22.89% $969,290.07
Delta: -7.46% -$361,399.30
Subcontractor Percentage Amount
DIIBS SPECIALISTS, LLC 23.71% $1,049,303.66
Total: 23.71% $1,049,303.66

Bid Items & Bid Tabulations

60 Total 0 of 60
KIMBLE  |  US 290  |  SAN ANGELO  |  0112-01-019  |  06/05/2020  |  $5,108,594.55  |  STP 2020(906)HES  |  SAFETY TREAT FIXED OBJECTS  |  235 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RELMCO, INC.
3LW CIVIL LLC
SCR CIVIL CONSTRUCTION, LLC
ACME BRIDGE COMPANY, INC.
REMOVING CONC (RIPRAP)
SY 40.000 $47.490 $50.000 $25.000 $220.000 $31.900
REMOVING CONC (RIPRAP)
CY 9.000 $1,526.250 $250.000 $160.000 $882.000 $204.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY A)
CY 265.000 $79.490 $85.000 $86.000 $115.000 $227.000
FURNISHING AND PLACING TOPSOIL (3")
SY 600.000 $27.500 $15.000 $15.000 $6.000 $14.400
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 600.000 $0.260 $2.000 $4.000 $2.800 $3.350
LRA PAV TY-I GR-D
TON 16.000 $275.000 $300.000 $500.000 $1,180.000 $484.000
FLOWABLE BACKFILL
CY 4.000 $1,466.670 $450.000 $1,350.000 $1,945.000 $484.000
CL B CONC (FLUME)
CY 39.000 $529.070 $650.000 $700.000 $4,300.000 $909.000
CL C CONC (RAIL FOUNDATION)
CY 10.000 $2,021.250 $1,900.000 $1,040.000 $1,300.000 $916.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 6.000 $524.330 $500.000 $225.000 $600.000 $725.000
CONC STR REPAIR (STANDARD)
SF 2.000 $304.330 $350.000 $500.000 $1,000.000 $785.000
RIPRAP (CONC)(5 IN)
CY 29.000 $1,061.340 $425.000 $600.000 $740.000 $874.000
RIPRAP (MOW STRIP)(4 IN)
CY 76.000 $1,781.670 $425.000 $800.000 $790.000 $921.000
RAIL (TY SSTR)
LF 100.000 $221.380 $403.000 $200.000 $220.000 $338.000
RAIL (TY T222)
LF 20.000 $270.120 $591.500 $210.000 $625.000 $298.000
RETROFIT RAIL (TY T131RC)
LF 1,692.000 $110.000 $205.000 $250.000 $256.000 $293.000
RETROFIT RAIL (TY T631)
LF 250.000 $123.640 $85.800 $100.000 $247.000 $233.000
RETROFIT RAIL (TY SSTR)
LF 2,510.000 $257.400 $265.000 $210.000 $220.000 $200.000
RETROFIT RAIL (TY T222)
LF 200.000 $357.710 $265.000 $225.000 $625.000 $173.000
SET (TY I)(S= 7 FT)(HW= 3 FT)(4:1) (C)
EA 12.000 $5,225.000 $9,500.000 $8,500.000 $12,000.000 $7,720.000
SET (TY II) (60 IN) (RCP) (3: 1) (C)
EA 2.000 $10,615.000 $5,070.000 $10,400.000 $33,800.000 $13,300.000
MOBILIZATION
LS 1.000 $460,000.000 $360,000.000 $490,000.000 $470,000.000 $305,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 30.000 $9,017.420 $6,500.000 $30,000.000 $8,000.000 $13,800.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 135.000 $14.520 $20.000 $9.000 $11.000 $20.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 135.000 $1.830 $10.000 $3.000 $2.250 $13.300
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 2.000 $4,013.890 $10,000.000 $6,500.000 $6,000.000 $6,660.000
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
LF 2,430.000 $233.750 $100.000 $50.000 $14.000 $70.000
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 16,230.000 $27.500 $20.000 $6.000 $24.000 $31.300
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 2,430.000 $22.000 $28.000 $9.000 $14.000 $29.700
MTL W-BEAM GD FEN (STEEL POST)
LF 21,378.500 $35.620 $32.000 $33.000 $33.500 $39.900
TERMINAL ANCHOR SECTION
EA 1.000 $1,760.000 $935.000 $1,000.000 $2,793.000 $3,330.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 36.000 $2,444.380 $1,870.000 $2,100.000 $3,072.000 $3,330.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 18.000 $1,239.640 $1,375.000 $1,100.000 $2,180.000 $2,600.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 310.000 $70.130 $60.500 $68.000 $90.000 $106.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 4.000 $1,952.500 $1,265.000 $1,000.000 $2,067.000 $2,460.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 12.000 $330.000 $737.000 $800.000 $670.000 $799.000
CONNECTOR PLATE FOR THRIE BEAM
EA 12.000 $330.000 $275.000 $10.000 $670.000 $799.000
MTL BM GD FEN TRANS (31"-28")(25')
EA 16.000 $663.000 $962.500 $685.000 $1,676.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 10,252.500 $5.700 $2.750 $8.000 $7.000 $4.000
REMOVE TERMINAL ANCHOR SECTION
EA 40.000 $393.680 $165.000 $350.000 $335.000 $399.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $222.350 $192.500 $205.000 $335.000 $399.000
GUARDRAIL END TREATMENT (INSTALL)
EA 129.000 $2,980.540 $2,860.000 $2,750.000 $3,350.000 $3,990.000
GUARDRAIL END TREATMENT (REMOVE)
EA 34.000 $324.170 $220.000 $350.000 $335.000 $399.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 50.000 $2,811.530 $950.000 $2,500.000 $1,300.000 $2,800.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,579.200 $750.000 $2,000.000 $1,000.000 $2,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $10,500.600 $9,000.000 $10,000.000 $10,000.000 $18,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 12.000 $37.060 $22.000 $10.000 $40.000 $33.300
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 46.000 $36.670 $23.100 $10.000 $40.000 $33.300
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 4.000 $111.270 $60.500 $35.000 $175.000 $166.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 66.000 $42.590 $24.200 $15.000 $56.000 $53.200
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 324.000 $38.500 $25.300 $15.000 $56.000 $53.200
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 255.000 $4.470 $10.000 $8.000 $22.350 $26.600
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 15,849.000 $1.520 $2.000 $2.000 $1.700 $2.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 96.000 $11.070 $5.000 $15.000 $22.500 $26.600
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
EA 144.000 $31.160 $20.000 $60.000 $50.000 $99.800
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 10,200.000 $3.300 $2.000 $3.000 $1.700 $2.000
ELIM EXT PAV MRK & MRKS (4")
LF 15,916.000 $2.200 $2.000 $3.000 $1.350 $1.600
REPAIR (TY T1)
LF 25.000 $292.600 $250.000 $100.000 $345.000 $133.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 690.000 $199.430 $135.000 $100.000 $108.000 $140.000
TMA (STATIONARY)
DAY 526.000 $257.130 $175.000 $100.000 $225.000 $166.000
Totals: $5,108,594.550 $4,234,053.375 $4,718,546.500 $4,841,944.150 $5,203,343.450