KERR SH 16 (0291-03-077)

Items: 132

County: KERR
Length: 0.9430 MILES
Highway: SH 16
District: SAN ANTONIO
Control Number: 0291-03-077
DBE Goal: 0.0%
Project: F 2026(068)
Guaranty: $84,000.00
Time: 243 WORKING DAYS
Engineer's Estimate: $4,462,547.00
Date: 06/03/2026 (7 days ago)
Contract Number: 6263212
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00186691
Contract Type: Federal
Project Description: UPGRADE PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
ANDRES GONZALEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$4,462,547.00
$4,297,619.67
Over/Under Est: -3.7% -$164,927.33
$4,711,430.76
Over/Under Est: 5.58% $248,883.76
Amt Left: 9.63% $413,811.09
Over/Under Est: 14.67% $654,747.20
Amt Left: 19.07% $819,674.53
Delta: -8.61% -$405,863.44
Over/Under Est: 14.77% $659,327.32
Amt Left: 19.18% $824,254.65
Delta: -0.09% -$4,580.12
$6,126,351.40
Over/Under Est: 37.28% $1,663,804.40
Amt Left: 42.55% $1,828,731.73
Delta: -19.61% -$1,004,477.08
Over/Under Est: 39.8% $1,776,068.02
Amt Left: 45.16% $1,940,995.35
Delta: -1.83% -$112,263.62

Bid Items & Bid Tabulations

132 Total 0 of 132
KERR  |  SH 16  |  SAN ANTONIO  |  0291-03-077  |  06/03/2026  |  $4,462,547.00  |  F 2026(068)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  243 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
STX CIVIL
ACEE CONSTRUCTION LLC.
JOE BLAND CONSTRUCTION LLC
GARRET SHIELDS INFRASTRUCTURE
J3 COMPANY, LLC
E-Z BEL CONSTRUCTION, LLC
PREPARING ROW
STA 45.430 $1,600.000 $151.540 $1,975.000 $2,000.000 $1,000.000 $2,400.000 $1,825.000
REMOV CONC (RIPRAP)
SY 881.000 $15.000 $11.850 $20.000 $40.000 $20.000 $30.000 $1.000
REMOV CONC (DRIVEWAYS)
SY 526.000 $17.000 $21.390 $25.000 $45.000 $30.000 $40.000 $1.000
REMOV CONC (CURB OR CURB & GUTTER)
LF 4,583.000 $9.000 $6.480 $7.000 $10.000 $10.000 $6.000 $1.000
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
SY 1,123.000 $7.000 $9.110 $6.750 $15.000 $20.000 $25.000 $4.000
EMBANK (FNL)(OC)(TY A)
CY 694.000 $20.000 $41.880 $30.000 $20.000 $30.000 $60.000 $60.000
FURN & PLACE TOPSOIL (4")
SY 2,404.000 $2.000 $1.460 $6.000 $8.000 $5.000 $7.000 $4.500
BLOCK SODDING
SY 2,404.000 $6.000 $4.740 $8.050 $7.000 $8.000 $8.000 $6.000
VEGETATIVE WATERING
TGL 37.570 $30.000 $32.030 $113.350 $60.000 $20.000 $120.000 $120.000
RDSIDE AMENITY (REMOV)
EA 2.000 $835.000 $410.440 $550.000 $5,650.000 $500.000 $1,000.000 $250.000
SP MIXES SP-C SAC-B PG76-22
TON 2,256.000 $93.000 $129.970 $141.750 $135.000 $160.000 $125.000 $125.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 857.000 $53.000 $124.410 $126.000 $130.000 $150.000 $135.000 $120.000
PLANE ASPH CONC PAV(0" TO 0.5" MICRO)
SY 19,588.000 $1.500 $2.050 $1.250 $2.500 $2.000 $1.000 $2.000
PLANE ASPH CONC PAV(2")
SY 19,588.000 $1.800 $2.550 $3.700 $3.000 $4.000 $4.000 $2.500
STRUCT EXCAV (PIPE)
CY 120.000 $6.000 $32.790 $10.750 $30.000 $50.000 $150.000 $12.000
CUT & RESTORING PAV
SY 2,668.000 $50.000 $62.090 $68.000 $85.000 $120.000 $55.000 $60.000
CEM STABIL BKFL
CY 3,956.700 $100.000 $156.260 $129.000 $155.000 $150.000 $220.000 $40.000
TRENCH EXCAVATION PROTECTION
LF 1,836.000 $8.000 $9.450 $12.150 $10.000 $1.000 $25.000 $10.000
TEMPORARY SPL SHORING
SF 220.000 $14.000 $13.660 $20.000 $85.000 $1.000 $25.000 $20.000
CL A CONC (COLLAR)
EA 58.000 $1,300.000 $1,679.140 $750.000 $815.000 $1,000.000 $1,800.000 $100.000
CL A CONC (PLUG)
EA 5.000 $1,500.000 $1,054.960 $1,316.550 $450.000 $500.000 $2,000.000 $100.000
CL C CONC (MISC)
CY 15.200 $770.000 $1,518.080 $650.000 $905.000 $600.000 $1,600.000 $600.000
RETAINING WALL (SPREAD FOOTING)
SF 447.000 $106.000 $96.240 $90.000 $120.000 $100.000 $125.000 $115.000
RIPRAP (CONC)(6 IN)
CY 35.500 $550.000 $572.770 $545.000 $640.000 $600.000 $750.000 $400.000
RIPRAP (CONC)(CL A)
CY 22.100 $500.000 $519.590 $545.000 $730.000 $800.000 $700.000 $1,000.000
RAIL (HANDRAIL)(TY B)
LF 302.000 $125.000 $140.480 $147.000 $100.000 $150.000 $140.000 $120.000
CONC BOX CULV (3 FT X 2 FT)
LF 510.000 $350.000 $248.340 $339.600 $330.000 $250.000 $400.000 $580.000
CONC BOX CULV (4 FT X 2 FT)
LF 548.000 $400.000 $292.640 $347.850 $355.000 $350.000 $440.000 $670.000
CONC BOX CULV (4 FT X 3 FT)
LF 792.000 $425.000 $318.320 $417.950 $415.000 $300.000 $540.000 $1,050.000
CONC BOX CULV (5 FT X 4 FT)
LF 178.000 $585.000 $414.630 $586.100 $560.000 $400.000 $860.000 $1,800.000
CONC BOX CULV (6 FT X 3 FT)
LF 109.000 $580.000 $468.360 $709.300 $640.000 $500.000 $1,100.000 $2,200.000
RC PIPE (CL III)(18 IN)
LF 534.000 $85.000 $86.580 $95.600 $90.000 $80.000 $150.000 $230.000
RC PIPE (CL III)(24 IN)
LF 403.000 $110.000 $106.850 $113.450 $120.000 $120.000 $170.000 $400.000
RC PIPE (CL III)(30 IN)
LF 45.000 $130.000 $141.790 $141.850 $150.000 $180.000 $220.000 $430.000
RC PIPE (CL III)(36 IN)
LF 8.000 $182.950 $183.450 $189.900 $230.000 $180.000 $320.000 $830.000
RC PIPE (CL IV)(18 IN)
LF 90.000 $13.000 $87.930 $100.400 $100.000 $80.000 $160.000 $710.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 2.000 $5,900.000 $5,771.500 $5,091.300 $3,225.000 $4,000.000 $9,500.000 $16,000.000
JCTBOX(COMPL)(PJB)(5FTX6FT)
EA 5.000 $8,900.000 $8,233.540 $12,331.050 $8,500.000 $7,000.000 $10,800.000 $28,000.000
JCTBOX(COMPL)(PJB)(6FTX6FT)
EA 2.000 $9,200.000 $15,185.840 $16,855.850 $11,000.000 $8,000.000 $14,000.000 $50,000.000
JCTBOX(COMPL)(PJB)(8FTX8FT)
EA 1.000 $13,000.000 $19,930.250 $26,098.150 $18,000.000 $15,000.000 $18,000.000 $85,000.000
INLET (COMPL)(PCO)(3FT)(NONE)
EA 4.000 $8,300.000 $7,780.930 $7,547.500 $8,250.000 $8,000.000 $10,000.000 $14,000.000
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 3.000 $14,000.000 $9,944.220 $10,809.250 $6,250.000 $8,000.000 $11,000.000 $19,000.000
INLET (COMPL)(PCO)(6FT)(NONE)
EA 5.000 $9,000.000 $12,741.640 $14,026.200 $10,000.000 $8,000.000 $13,500.000 $19,500.000
INLET (COMPL)(PCO)(6FT)(LEFT)
EA 1.000 $9,500.000 $12,152.080 $13,298.550 $11,000.000 $8,000.000 $13,000.000 $21,000.000
INLET (COMPL)(PCO)(6FT)(BOTH)
EA 1.000 $10,200.000 $12,892.190 $14,398.950 $11,750.000 $8,000.000 $14,000.000 $23,000.000
INLET (COMPL)(PSL)(RC)(4FTX5FT)
EA 1.000 $11,600.000 $8,887.470 $8,343.100 $7,000.000 $8,000.000 $10,500.000 $17,000.000
INLET (COMPL)(PSL)(RC)(5FTX5FT)
EA 1.000 $11,700.000 $9,999.870 $8,949.700 $7,500.000 $10,000.000 $10,500.000 $17,500.000
INLET (COMPL)(PSL)(RC)(5FTX6FT)
EA 3.000 $13,500.000 $11,433.150 $15,423.850 $11,500.000 $9,000.000 $13,500.000 $19,000.000
INLET (COMPL)(PSL)(RC)(6FTX6FT)
EA 2.000 $14,200.000 $12,519.310 $18,562.850 $13,500.000 $10,000.000 $13,500.000 $20,000.000
INLET (COMPL)(PSL)(RC)(8FTX8FT)
EA 1.000 $19,000.000 $29,718.110 $29,871.900 $22,500.000 $20,000.000 $25,000.000 $30,000.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $9,300.000 $8,550.560 $9,786.150 $7,250.000 $6,000.000 $10,500.000 $17,000.000
INLET (COMPL)(PSL)(FG)(4FTX5FT-4FTX4FT)
EA 2.000 $9,500.000 $9,705.740 $5,301.450 $7,675.000 $10,000.000 $11,000.000 $19,000.000
INLET (COMPL)(PSL)(FG)(5FTX5FT-4FTX4FT)
EA 2.000 $11,400.000 $10,659.580 $11,665.800 $8,350.000 $10,000.000 $11,500.000 $20,000.000
INLET (COMPL)(PSL)(FG)(5FTX6FT-4FTX4FT)
EA 1.000 $12,500.000 $14,862.310 $18,747.750 $14,250.000 $10,000.000 $14,000.000 $28,000.000
INLET (COMP)(TY C)
EA 1.000 $9,000.000 $11,823.250 $24,784.650 $16,250.000 $10,000.000 $11,000.000 $21,000.000
HEADWALL (CH - PW - 0) (DIA= 18 IN)
EA 6.000 $9,000.000 $9,645.440 $4,825.650 $3,500.000 $2,000.000 $9,000.000 $4,000.000
WINGWALL (SW - 0) (HW=4 FT)
EA 1.000 $20,000.000 $11,798.830 $4,725.000 $8,350.000 $10,000.000 $16,000.000 $10,000.000
GRATE & FRAME
EA 27.000 $2,000.000 $2,121.990 $3,250.000 $1,500.000 $2,500.000 $2,000.000 $1,400.000
REMOV STR (INLET)
EA 2.000 $750.000 $1,284.430 $1,750.000 $725.000 $1,000.000 $1,500.000 $500.000
REMOV STR (PIPE)
LF 132.000 $20.000 $23.100 $24.300 $55.000 $10.000 $50.000 $15.000
MOBILIZATION
LS 1.000 $414,000.000 $204,648.550 $450,000.000 $200,000.000 $300,000.000 $500,000.000 $400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $15,000.000 $2,031.740 $4,750.000 $8,150.000 $5,000.000 $15,000.000 $3,500.000
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 1,254.000 $10.000 $8.010 $5.900 $7.000 $5.000 $6.000 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,254.000 $1.500 $1.010 $2.300 $1.000 $1.000 $1.500 $5.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 3,160.000 $19.000 $79.640 $25.000 $100.000 $70.000 $30.000 $60.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 400.000 $30.000 $79.640 $25.000 $95.000 $80.000 $35.000 $65.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 3,160.000 $9.000 $8.990 $17.000 $20.000 $20.000 $15.000 $15.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 400.000 $15.000 $8.990 $17.000 $25.000 $20.000 $20.000 $15.000
CONC CURB (TY I)
LF 61.000 $16.000 $27.110 $31.450 $65.000 $20.000 $45.000 $80.000
CONC CURB (TY II)
LF 4,672.000 $25.000 $15.930 $16.000 $30.000 $30.000 $24.000 $20.000
CONC CURB (SLOTTED)
LF 136.000 $25.000 $45.650 $10.100 $65.000 $40.000 $45.000 $90.000
CONC CURB & GUTTER (ARMOR CURB)
LF 42.000 $390.000 $288.150 $334.400 $375.000 $200.000 $300.000 $240.000
DRIVEWAYS (CONC)
SY 1,642.000 $105.000 $96.390 $104.000 $165.000 $120.000 $100.000 $95.000
DRIVEWAYS (ACP)
SY 19.000 $65.000 $91.540 $36.750 $145.000 $120.000 $200.000 $63.000
CONC SIDEWALKS (4")
SY 2,386.000 $72.000 $67.040 $82.500 $75.000 $100.000 $75.000 $95.000
CURB RAMPS (TY 1)
SY 70.000 $170.000 $103.500 $138.500 $185.000 $300.000 $180.000 $1.000
CURB RAMPS (TY 2)
SY 60.000 $170.000 $97.990 $125.950 $195.000 $300.000 $180.000 $1.000
CURB RAMPS (TY 3)
SY 16.000 $170.000 $104.520 $138.400 $225.000 $300.000 $180.000 $1.000
CURB RAMPS (TY 7)
SY 57.000 $170.000 $108.280 $132.650 $250.000 $300.000 $180.000 $1.000
CURB RAMPS (TY 10)
SY 10.000 $170.000 $109.070 $133.550 $400.000 $300.000 $180.000 $1.000
CURB RAMPS (TY 21)
SY 6.000 $170.000 $154.090 $199.150 $400.000 $300.000 $400.000 $1.000
CURB RAMPS (TY 22)
SY 47.000 $170.000 $119.960 $163.450 $300.000 $300.000 $400.000 $1.000
CONC SIDEWALKS (SPECIAL)
SY 948.000 $240.000 $83.120 $64.950 $72.000 $150.000 $350.000 $200.000
CONDT (PVC) (SCH 80) (3")
LF 44.000 $22.000 $48.230 $42.000 $42.000 $50.000 $50.000 $47.730
ELEC CONDR (NO.6) BARE
LF 44.000 $3.000 $2.350 $2.050 $4.000 $10.000 $3.000 $2.640
REMOVE GROUND BOX
EA 6.000 $425.000 $506.430 $441.000 $1,400.000 $200.000 $500.000 $546.890
INSTL GROUND BOX (W/SECURE LID)
EA 6.000 $1,650.000 $2,532.140 $2,205.000 $3,000.000 $2,500.000 $2,500.000 $2,787.690
RELOCATE SM RD SN SUP&AM TY S80
EA 20.000 $750.000 $572.750 $498.750 $850.000 $500.000 $475.000 $475.000
REMOVE SM RD SN SUP&AM
EA 1.000 $110.000 $120.580 $105.000 $850.000 $500.000 $100.000 $100.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 560.000 $0.300 $1.210 $1.050 $2.000 $1.130 $1.000 $1.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 537.000 $0.600 $1.210 $1.050 $3.000 $1.000 $1.000 $1.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 143.000 $4.000 $7.230 $6.300 $3.000 $6.890 $6.000 $6.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 12.000 $85.000 $180.870 $157.500 $85.000 $160.000 $150.000 $150.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 4.000 $115.000 $180.870 $157.500 $100.000 $200.000 $150.000 $150.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 360.000 $0.300 $1.210 $1.050 $2.000 $1.150 $1.000 $1.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 2,791.000 $0.300 $1.210 $1.050 $2.000 $0.900 $1.000 $1.000
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
LF 58.000 $3.000 $7.230 $6.300 $2.250 $1.000 $6.000 $6.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 2,529.000 $0.750 $2.410 $2.100 $3.500 $1.800 $2.000 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 882.000 $0.950 $1.810 $1.600 $2.250 $1.500 $1.500 $1.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,668.000 $7.150 $8.740 $7.600 $12.500 $9.000 $7.250 $7.250
PAVEMENT SLER 6"
LF 90.000 $0.200 $0.600 $0.550 $2.250 $0.500 $0.500 $0.500
PAVEMENT SLER 8"
LF 45.000 $0.400 $0.600 $0.550 $2.500 $1.000 $0.500 $0.500
PAVEMENT SLER 24"
LF 1,668.000 $2.000 $3.010 $2.650 $2.750 $5.000 $2.500 $2.500
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 1,120.000 $0.600 $0.900 $0.800 $1.500 $2.500 $0.750 $0.750
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 665.000 $0.600 $0.900 $0.800 $1.500 $2.500 $0.750 $0.750
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 5,481.000 $0.500 $0.900 $0.800 $1.500 $2.000 $0.750 $0.750
PREFAB PM TY C (W)(ARROW)
EA 6.000 $200.000 $361.740 $315.000 $250.000 $250.000 $300.000 $300.000
PREFAB PM TY C (W)(WORD)
EA 6.000 $210.000 $422.020 $367.500 $260.000 $350.000 $350.000 $350.000
PREFAB PM TY C (Y)(MED NOSE)
EA 1.000 $285.000 $542.600 $472.500 $340.000 $500.000 $450.000 $450.000
REFL PAV MRKR TY I-C
EA 44.000 $4.000 $7.840 $6.850 $8.000 $6.250 $6.500 $6.500
REFL PAV MRKR TY II-A-A
EA 210.000 $4.000 $7.840 $6.850 $8.000 $6.250 $6.500 $6.500
ELIM EXT PM & MRKS (24")
LF 479.000 $3.000 $4.820 $4.200 $5.000 $5.500 $4.000 $4.000
PAV SURF PREP FOR MRK (6")
LF 90.000 $0.070 $0.240 $0.200 $1.000 $0.100 $0.200 $0.200
PAV SURF PREP FOR MRK (8")
LF 45.000 $0.150 $0.360 $0.300 $1.000 $1.250 $0.300 $0.300
PED SIG SEC (LED)(2 INDICATIONS)
EA 5.000 $675.000 $795.810 $693.000 $1,400.000 $1,400.000 $690.320 $767.420
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 171.000 $3.000 $3.200 $2.800 $6.000 $7.000 $3.000 $5.500
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
LF 169.000 $2.000 $2.050 $1.800 $4.000 $7.000 $1.780 $3.650
PEDESTRIAN PUSH BUTTON POLE
EA 3.000 $2,100.000 $3,135.030 $2,730.000 $2,050.000 $5,000.000 $2,719.440 $2,257.170
REMOVE PED POLE ASSEMBLY
EA 4.000 $500.000 $295.420 $257.250 $1,000.000 $1,000.000 $256.260 $1,298.760
PED DETECT PUSH BUTTON (STANDARD)
EA 13.000 $840.000 $1,241.950 $1,081.500 $1,500.000 $625.000 $1,077.320 $1,290.630
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 9.000 $110.000 $48.230 $42.000 $475.000 $150.000 $41.840 $158.130
UNDERSEAL COURSE
GAL 5,117.000 $3.000 $3.500 $4.200 $4.000 $5.000 $5.000 $3.250
HYDROSTATIC PRESSURE TEST
EA 2.000 $1,500.000 $1,501.250 $994.000 $9,350.000 $14,000.000 $3,250.000 $2,000.000
PIPE WTR MAIN (PVC/C-900) (8IN.)
LF 205.000 $40.000 $145.100 $61.400 $75.000 $150.000 $240.000 $350.000
DUCTILE IRON FITTINGS
TON 1.000 $3,000.000 $5,224.010 $17,157.000 $16,500.000 $30,000.000 $10,000.000 $1.000
GATE VALVE & BOX (COMPLETE) (8")
EA 5.000 $2,000.000 $2,749.090 $4,242.150 $4,000.000 $6,000.000 $3,800.000 $3,500.000
TRENCH EXCAVATION PROTECTION
LF 410.000 $1.000 $4.970 $4.000 $3.000 $75.000 $10.000 $1.000
FIRE HYDRANT ASSEMBLY
EA 1.000 $6,675.000 $6,497.010 $8,139.100 $13,150.000 $30,000.000 $8,000.000 $5,000.000
REMOVE EXISTING WATER LINE (2")
LF 10.000 $18.000 $7.050 $20.800 $75.000 $3,000.000 $60.000 $15.000
TIE-IN (COMPLETE)(6")
EA 4.000 $1,510.000 $4,508.880 $2,656.500 $8,000.000 $7,000.000 $6,500.000 $6,000.000
RECONNECT SHORT SERVICE
EA 1.000 $400.000 $1,249.970 $2,007.600 $3,000.000 $30,000.000 $4,500.000 $2,500.000
16" STEEL CASING
LF 30.000 $295.000 $180.070 $104.150 $235.000 $1,000.000 $260.000 $125.000
Totals: $4,462,547.000 $4,297,619.661 $4,711,430.760 $5,117,294.200 $5,121,874.320 $6,126,351.400 $6,238,615.020
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
ENVIRONMENTAL: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $25,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,000.00
Total: $41,000.00