PREPARING ROW
|
STA
|
9.000
|
$3,000.000
|
$4,000.000
|
$4,410.000
|
$5,500.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
533.000
|
$9.000
|
$14.950
|
$10.000
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,172.000
|
$10.000
|
$14.530
|
$18.000
|
$25.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
590.000
|
$13.000
|
$11.950
|
$15.000
|
$20.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
3,160.000
|
$1.300
|
$1.960
|
$3.200
|
$8.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
339.000
|
$0.230
|
$2.650
|
$2.100
|
$2.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
3,160.000
|
$0.160
|
$0.890
|
$0.400
|
$0.380
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
3,160.000
|
$0.180
|
$0.410
|
$0.300
|
$0.280
|
|
|
VEGETATIVE WATERING
|
MG
|
27.000
|
$22.140
|
$40.850
|
$46.720
|
$30.000
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY F)
|
SY
|
3,499.000
|
$5.000
|
$3.310
|
$1.750
|
$1.650
|
|
|
PROOF ROLLING
|
HR
|
112.000
|
$100.000
|
$58.410
|
$32.000
|
$70.000
|
|
|
FL BS (CIP)(TY D GR 1-2, OR 5)FINAL POS
|
CY
|
505.000
|
$55.000
|
$79.100
|
$75.000
|
$90.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
364.000
|
$4.000
|
$4.340
|
$4.500
|
$7.290
|
|
|
AGGR (TY-PB GR-4)
|
CY
|
15.000
|
$81.000
|
$510.600
|
$530.000
|
$513.140
|
|
|
ASPH (AC-15P OR CRS-2P)
|
GAL
|
764.000
|
$4.000
|
$6.630
|
$6.900
|
$8.100
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
883.000
|
$2.800
|
$9.190
|
$9.500
|
$12.690
|
|
|
CEM STABIL BKFL
|
CY
|
238.000
|
$80.000
|
$127.110
|
$179.000
|
$175.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
141.000
|
$15.230
|
$103.850
|
$42.400
|
$65.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
74.000
|
$105.000
|
$241.610
|
$183.000
|
$300.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
296.000
|
$200.000
|
$471.790
|
$400.000
|
$500.000
|
|
|
CL C CONC (ABUT)
|
CY
|
64.800
|
$960.000
|
$825.930
|
$1,080.000
|
$1,500.000
|
|
|
CL C CONC (CAP)
|
CY
|
13.600
|
$1,150.000
|
$2,133.300
|
$1,800.000
|
$5,000.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
28.400
|
$1,050.000
|
$1,092.300
|
$1,110.000
|
$1,500.000
|
|
|
REINF CONC SLAB
|
SF
|
9,430.000
|
$18.000
|
$19.480
|
$23.000
|
$32.000
|
|
|
APPROACH SLAB
|
CY
|
96.600
|
$560.000
|
$476.020
|
$688.000
|
$750.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
1,221.060
|
$145.000
|
$207.100
|
$233.500
|
$340.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
11.000
|
$440.000
|
$462.230
|
$550.000
|
$550.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
236.000
|
$420.000
|
$277.460
|
$550.000
|
$550.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(8 IN)
|
CY
|
30.000
|
$350.000
|
$229.260
|
$164.000
|
$200.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
17.000
|
$418.000
|
$471.470
|
$700.000
|
$750.000
|
|
|
RAIL (TY T223)
|
LF
|
470.000
|
$120.000
|
$95.520
|
$82.800
|
$175.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
97.000
|
$120.000
|
$136.200
|
$150.000
|
$135.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
44.000
|
$88.000
|
$80.860
|
$96.500
|
$150.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,000.000
|
$1,511.300
|
$2,000.000
|
$3,500.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$62,000.000
|
$59,528.900
|
$95,000.000
|
$125,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$134,281.280
|
$183,000.000
|
$153,000.000
|
$130,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$8,000.000
|
$5,000.000
|
$1,940.000
|
$5,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
43.000
|
$24.000
|
$35.540
|
$29.700
|
$28.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
186.000
|
$29.070
|
$39.140
|
$33.900
|
$37.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
32.000
|
$60.000
|
$100.900
|
$74.200
|
$70.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
261.000
|
$8.600
|
$10.510
|
$14.800
|
$14.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$22.300
|
$20.220
|
$19.100
|
$18.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$6.660
|
$8.070
|
$2.100
|
$2.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
80.000
|
$86.490
|
$56.170
|
$73.500
|
$82.060
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
738.000
|
$2.440
|
$4.240
|
$3.700
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
738.000
|
$0.620
|
$0.610
|
$1.600
|
$1.500
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
80.000
|
$120.000
|
$204.240
|
$144.000
|
$125.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
9.000
|
$3,800.000
|
$2,757.280
|
$2,860.000
|
$5,500.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,050.000
|
$34.000
|
$65.000
|
$16.500
|
$50.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
960.000
|
$4.630
|
$4.020
|
$3.100
|
$25.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
1,050.000
|
$7.070
|
$11.600
|
$16.500
|
$25.000
|
|
|
DRIVEWAYS (ACP)(TYPE 1)
|
SY
|
218.000
|
$32.000
|
$80.050
|
$67.900
|
$90.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
87.500
|
$25.000
|
$45.130
|
$46.900
|
$55.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,400.000
|
$2,088.220
|
$2,520.000
|
$2,200.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
500.000
|
$3.000
|
$2.510
|
$2.600
|
$4.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$195.000
|
$313.810
|
$326.000
|
$350.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,000.000
|
$3,635.070
|
$3,770.000
|
$4,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,500.000
|
$510.600
|
$1,060.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$730.000
|
$510.610
|
$795.000
|
$750.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL2)
|
EA
|
4.000
|
$7,500.000
|
$8,000.000
|
$9,290.000
|
$10,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
1.000
|
$250.000
|
$239.080
|
$286.000
|
$450.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
1.000
|
$670.000
|
$887.650
|
$641.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$860.000
|
$1,019.770
|
$769.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,000.000
|
$1,489.430
|
$1,050.000
|
$1,500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
5.000
|
$90.000
|
$127.650
|
$101.000
|
$125.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
16.000
|
$18.800
|
$18.260
|
$31.800
|
$25.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
20.000
|
$21.000
|
$14.510
|
$10.600
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
16.000
|
$26.310
|
$23.050
|
$31.800
|
$35.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
4,127.000
|
$0.270
|
$0.760
|
$0.800
|
$0.750
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
24.000
|
$6.000
|
$51.060
|
$53.000
|
$50.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
800.000
|
$0.280
|
$2.040
|
$2.100
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
514.000
|
$0.620
|
$3.070
|
$3.200
|
$3.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
6,740.000
|
$0.130
|
$0.200
|
$0.210
|
$0.200
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
3,370.000
|
$0.590
|
$2.450
|
$2.550
|
$2.400
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
3,370.000
|
$0.590
|
$2.450
|
$2.550
|
$2.400
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
68.000
|
$3.300
|
$20.430
|
$21.200
|
$20.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
4,736.000
|
$0.350
|
$1.500
|
$1.550
|
$1.470
|
|
|
FULL - WIDTH MOWING
|
CYC
|
4.000
|
$2,500.000
|
$1,225.450
|
$1,120.000
|
$1,000.000
|
|
|
LITTER REMOVAL
|
CYC
|
10.000
|
$600.000
|
$714.850
|
$338.000
|
$1,000.000
|
|
|
TACK COAT
|
GAL
|
265.000
|
$3.000
|
$4.080
|
$4.250
|
$3.240
|
|
|
SP MIXES SP-C SAC-B PG70-22 (EXEMPT)
|
TON
|
508.000
|
$88.000
|
$194.030
|
$201.000
|
$198.780
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
2.000
|
$250.000
|
$459.540
|
$113.000
|
$250.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
18.000
|
$73.000
|
$153.180
|
$106.000
|
$150.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,000.000
|
$15,000.000
|
$12,100.000
|
$8,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
4.000
|
$180.000
|
$318.410
|
$194.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
11.000
|
$220.000
|
$357.420
|
$194.000
|
$1,000.000
|
|
Totals: |
$1,477,040.150
|
$1,836,910.477
|
$1,904,719.700
|
$2,496,480.990
|