Show Job Controls
Bid Cobra

KENEDY US 77 (0327-03-050)

Items: 147

County: KENEDY
Length: 1.8000 MILES
Highway: US 77
District: PHARR
Control Number: 0327-03-050
DBE Goal: 0.0%
Project: C 327-03-050
Guaranty: $100,000.00
Time: 491 WORKING DAYS
Engineer's Estimate: $72,543,107.10
Date: 04/04/2025 (1 year ago)
Contract Number: 4253202
Type: INTERSTATE DESIGNATION
Project ID: A00184795
Project Description: CONSTRUCT MAIN LANES & OVERPASSES (FUTURE I-69 CORRIDOR)
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
ANDRES ESPINOZA
GABRIEL VILLARREAL
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$72,543,107.10
$61,607,900.27
Over/Under Est: -15.07% -$10,935,206.83
Over/Under Est: -9.72% -$7,054,471.03
Amt Left: 6.3% $3,880,735.80
$66,334,000.00
Over/Under Est: -8.56% -$6,209,107.10
Amt Left: 7.67% $4,726,099.73
Delta: -1.29% -$845,363.93
Over/Under Est: -5.38% -$3,902,335.75
Amt Left: 11.42% $7,032,871.08
Delta: -3.48% -$2,306,771.35
$71,675,591.93
Over/Under Est: -1.2% -$867,515.17
Amt Left: 16.34% $10,067,691.66
Delta: -4.42% -$3,034,820.58
Subcontractor Percentage Amount
IZAGUIRRE CONSTRUCTION LLC 1.29% $794,741.91
SOIL TECH ADVANCE INC. 1.21% $745,455.59
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 0.91% $560,631.89
*AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. 0.43% $264,913.97
HIGHWAY BARRICADES AND SERVICES, LLC 0.33% $203,306.07
SCOTT DERR PAINTING CO, LLC 0.17% $104,733.43
LONG LEGACY ENTERPRISES, LLC 0.16% $98,572.64
TEXAS HIGHWAY SYSTEMS, INC. 0.08% $49,286.32
Total: 4.58% $2,821,641.82

Bid Items & Bid Tabulations

147 Total 0 of 147
KENEDY  |  US 77  |  PHARR  |  0327-03-050  |  04/04/2025  |  $72,543,107.10  |  C 327-03-050  |  INTERSTATE DESIGNATION  |  491 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOREMOST PAVING, INC.
ANDERSON COLUMBIA CO., INC.
POSILLICO CIVIL, INC.
PULICE CONSTRUCTION, INC.
CK NEWBERRY, LLC
PREPARING ROW
STA 126.000 $15,000.000 $8,925.000 $1,500.000 $19,500.000 $54,365.000 $20,000.000
REMOV CONC (MOWSTRIP)
LF 9,744.000 $17.500 $6.550 $5.000 $5.500 $7.280 $4.000
EXCAV (ROADWAY)
CY 78,891.000 $6.000 $5.450 $7.000 $4.750 $5.890 $14.000
EMBANK (FNL)(DC)(TY C)
CY 500,237.000 $30.000 $6.790 $33.000 $8.250 $34.830 $10.000
FURN & PLACE TOPSOIL (VEH)
CY 50.000 $50.000 $50.530 $100.000 $50.000 $27.100 $150.000
STRAW/HAY MLCH SEED(PERM_RURAL_SAND)
SY 287,403.000 $1.000 $0.680 $0.700 $0.480 $0.440 $0.500
STRAW/HAY MLCH SEED (TEMP_WARM)
SY 143,702.000 $1.000 $0.300 $0.300 $0.470 $0.400 $0.500
STRAW/HAY MLCH SEED (TEMP_COOL)
SY 143,702.000 $1.000 $0.300 $0.300 $0.470 $0.400 $0.500
VEGETATIVE WATERING
TGL 2,338.000 $40.000 $64.000 $28.000 $55.000 $54.090 $30.000
FL BS (RDWY DEL)(TY E GR 4)(FNL POS)
CY 30,645.000 $50.000 $44.000 $48.000 $50.000 $56.150 $65.000
GEOGRID BASE REINFORCEMENT (TYPE 2)
SY 51,900.000 $2.000 $1.440 $1.750 $1.500 $1.230 $1.500
REWORK BS MTL (TY B)(8")(DENS CONT)
SY 96,553.000 $2.000 $1.420 $2.340 $2.000 $3.520 $7.000
CEMENT
TON 4,873.000 $200.000 $200.000 $200.000 $210.000 $190.160 $225.000
CEMENT TRT (SUBGRADE)(12")
SY 183,385.000 $2.750 $2.680 $3.800 $1.650 $2.950 $2.000
CEMENT TRT (EXIST MATL & NEW BASE)(11")
SY 64,471.000 $3.000 $3.740 $4.700 $2.000 $2.960 $2.500
CEMENT TRT (EXIST MATL & NEW BASE)(14")
SY 111,239.000 $3.000 $2.370 $3.400 $2.200 $2.960 $3.000
SLV, HAUL & STKPL RCL APH PV (8 TO 10")
SY 96,553.000 $3.500 $4.830 $6.500 $5.350 $3.030 $6.000
PRIME COAT (MC-30)
GAL 3,381.000 $5.500 $9.000 $9.000 $6.000 $3.910 $6.000
SP MIXES SP-B SAC-B PG64-22
TON 40,963.000 $115.000 $108.000 $107.000 $105.000 $136.430 $130.000
SP MIXES SP-D SAC-A PG76-22
TON 5,274.000 $130.000 $109.000 $145.000 $125.000 $141.290 $160.000
SP MIXES SP-D SAC-B PG76-22
TON 9,141.000 $130.000 $129.000 $124.000 $110.000 $137.630 $140.000
STONE-MTRX-ASPH SMA-F SAC-A PG76-22
TON 9,141.000 $150.000 $155.000 $158.000 $105.000 $176.180 $180.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 1,263.000 $100.000 $45.400 $14.000 $64.000 $42.740 $50.000
PLANE & TEXT ASPH CONC PAV(1.5")
SY 891.000 $6.000 $31.240 $11.000 $5.500 $13.540 $10.000
STRUCT EXCAV (BOX)
CY 326.000 $50.000 $10.000 $10.000 $100.000 $74.740 $20.000
STRUCT EXCAV (PIPE)
CY 103.000 $85.000 $10.000 $30.000 $42.000 $74.990 $50.000
CUT & RESTORE CONC PAVING
SY 179.000 $125.000 $200.000 $180.000 $300.000 $358.580 $200.000
CEM STABIL BKFL
CY 891.000 $250.000 $200.000 $200.000 $75.000 $148.540 $200.000
TRENCH EXCAVATION PROTECTION
LF 507.000 $20.000 $1.000 $10.000 $1.000 $23.260 $10.000
TEMPORARY SPL SHORING
SF 327.000 $1.000 $100.000 $50.000 $100.000 $61.040 $75.000
PRESTR CONC PIL (18 IN SQ)
LF 5,500.000 $200.000 $161.000 $165.000 $215.000 $184.410 $225.000
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 14.000 $120.000 $95.000 $36.000 $95.000 $82.300 $200.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 84.000 $180.000 $145.000 $300.000 $145.000 $168.660 $250.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 96.000 $240.000 $225.000 $235.000 $250.000 $304.800 $325.000
CL B CONC (FLUME)
CY 32.000 $700.000 $1,300.000 $840.000 $400.000 $914.890 $650.000
CL C CONC (ABUT)
CY 414.000 $1,800.000 $2,402.000 $2,500.000 $850.000 $1,088.500 $2,000.000
REINF CONC SLAB
SF 30,400.000 $30.000 $30.000 $32.000 $25.000 $25.680 $45.000
RETAINING WALL (MSE) (ASHLAR STONE FIN)
SF 242,247.000 $80.000 $98.370 $53.700 $112.000 $34.950 $85.000
PRESTR CONC GIRDER (TX54)
LF 3,782.500 $250.000 $295.000 $288.000 $240.000 $204.500 $250.000
RIPRAP (CONC)(4 IN)
CY 224.000 $500.000 $650.000 $770.000 $435.000 $416.560 $725.000
RIPRAP (MOW STRIP)(4 IN)
CY 904.000 $490.000 $671.000 $800.000 $475.000 $426.420 $750.000
RAIL (TY SSTR)
LF 14,010.600 $65.000 $57.850 $65.000 $60.000 $55.790 $100.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 548.000 $225.000 $280.000 $290.000 $185.000 $243.880 $225.000
CONC BOX CULV (3 FT X 3 FT)
LF 203.000 $400.000 $700.000 $440.000 $495.000 $361.970 $400.000
RC PIPE (CL III)(18 IN)(MOD)
LF 148.000 $100.000 $100.000 $430.000 $490.000 $160.900 $125.000
RC PIPE (CL III)(24 IN)(MOD)
LF 7,709.000 $115.000 $102.000 $125.000 $85.000 $100.710 $135.000
RC PIPE (CL III)(30 IN)(MOD)
LF 1,025.000 $150.000 $130.000 $185.000 $110.000 $131.120 $150.000
INLET (COMPL)(PSL)(RC)(3FTX3FT)
EA 16.000 $5,000.000 $6,100.000 $5,000.000 $5,000.000 $6,007.660 $10,000.000
INLET (COMPL)(PSL)(RC)(4FTX4FT)
EA 4.000 $8,000.000 $6,700.000 $6,200.000 $5,500.000 $6,883.940 $10,000.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 12.000 $6,500.000 $8,400.000 $5,300.000 $5,750.000 $7,291.530 $10,000.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
EA 3.000 $8,700.000 $9,100.000 $6,400.000 $6,250.000 $8,301.730 $10,000.000
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
EA 2.000 $9,000.000 $11,000.000 $7,300.000 $7,500.000 $6,819.470 $10,000.000
INLET (COMPL)(DROP)
EA 8.000 $6,000.000 $4,500.000 $2,600.000 $6,750.000 $6,782.230 $10,000.000
INLET(COMPL)(TY MSE1)
EA 42.000 $6,000.000 $17,100.000 $3,900.000 $5,500.000 $5,434.920 $10,000.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $25,000.000 $70,000.000 $32,000.000 $12,500.000 $22,739.410 $50,000.000
SET (TY I)(S= 3 FT)(HW= 5 FT)(6:1)(C)
EA 1.000 $16,000.000 $32,000.000 $19,000.000 $12,500.000 $15,374.230 $20,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 4.000 $2,750.000 $1,900.000 $2,300.000 $2,000.000 $2,039.090 $2,500.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 9.000 $3,000.000 $2,000.000 $2,500.000 $2,500.000 $2,716.600 $2,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 2.000 $3,000.000 $2,600.000 $2,500.000 $2,750.000 $2,486.710 $2,750.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 1.000 $3,000.000 $2,700.000 $4,100.000 $3,000.000 $3,682.210 $3,250.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 4.000 $4,200.000 $3,700.000 $3,140.000 $3,200.000 $4,645.770 $3,500.000
REMOV STR (SET)
EA 18.000 $1,500.000 $800.000 $590.000 $170.000 $830.670 $1,000.000
REMOV STR (PIPE)
LF 707.000 $25.000 $30.000 $27.000 $12.500 $25.030 $20.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $200,000.000 $40,000.000 $84,000.000 $45,000.000 $81,626.860 $200,000.000
MOBILIZATION
LS 1.000 $7,723,205.150 $5,000,000.000 $5,900,000.000 $6,003,383.200 $6,848,199.210 $7,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 25.000 $20,000.000 $6,500.000 $5,000.000 $11,000.000 $3,272.440 $50,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $22,000.000 $7,500.000 $34,200.000 $12,000.000 $19,968.080 $30,000.000
TMA (STATIONARY)
DAY 1,173.000 $200.000 $22.000 $220.000 $58.000 $259.900 $325.000
TMA (MOBILE OPERATION)
DAY 157.000 $350.000 $0.010 $735.000 $250.000 $537.960 $325.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,590.000 $55.000 $36.750 $39.000 $49.000 $53.670 $50.000
ROCK FILTER DAMS (REMOVE)
LF 1,590.000 $15.000 $21.750 $23.000 $14.000 $15.000 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $50.000 $50.860 $72.000 $50.000 $52.990 $50.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $15.000 $26.980 $40.000 $15.000 $16.830 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 16,794.000 $3.500 $3.250 $3.500 $4.850 $4.190 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 16,794.000 $1.000 $1.450 $1.500 $1.250 $0.940 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,600.000 $7.500 $6.250 $6.500 $7.000 $9.110 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,600.000 $2.000 $1.650 $1.750 $2.000 $1.110 $2.000
CONSTRUCTING DETOURS
SY 49,808.000 $40.000 $66.570 $78.000 $78.000 $76.770 $80.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 30,330.000 $45.000 $33.290 $33.000 $62.000 $42.830 $60.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 65,430.000 $15.000 $4.450 $5.000 $4.000 $4.360 $10.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 180.000 $40.000 $11.180 $11.000 $15.000 $7.960 $60.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 30,330.000 $15.000 $14.180 $17.000 $5.000 $9.740 $15.000
PORT CTB (PINNING)
EA 316.000 $5.000 $174.870 $102.000 $30.000 $40.360 $100.000
DRIVEWAYS (ACP)
SY 378.000 $50.000 $123.020 $76.000 $30.000 $66.040 $100.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 47,225.000 $0.150 $0.450 $0.250 $0.310 $0.210 $0.200
MTL W-BEAM GD FEN (TIM POST)
LF 2,125.000 $25.000 $43.000 $24.000 $23.000 $26.110 $24.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 14.000 $1,650.000 $2,450.000 $2,850.000 $1,900.000 $2,153.930 $2,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,650.000 $2,000.000 $1,590.000 $1,500.000 $1,209.040 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 700.000 $6.000 $9.000 $3.700 $3.500 $2.030 $3.500
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $225.000 $700.000 $290.000 $275.000 $254.000 $275.000
CABLE BARRIER SYSTEM (INSTALL)(TL-4)
LF 10,773.000 $15.000 $15.600 $19.000 $17.450 $15.850 $18.000
CABLE BARRIER TERM SEC (INSTL)(TL-4)
EA 8.000 $4,000.000 $3,120.000 $3,450.000 $3,250.000 $3,169.940 $3,250.000
CABLE BARRIER (REMOVE)
LF 8,844.000 $6.000 $3.750 $5.000 $4.500 $3.810 $5.000
CABLE BARRIER TERMINAL SECTION (REMOVE)
EA 7.000 $400.000 $370.000 $800.000 $750.000 $375.920 $800.000
GUARDRAIL END TREATMENT (INSTALL)
EA 15.000 $3,500.000 $2,900.000 $3,636.000 $3,420.000 $2,946.420 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $450.000 $320.000 $290.000 $275.000 $325.120 $300.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 13.000 $1,300.000 $1,400.000 $800.000 $750.000 $1,422.410 $800.000
CRASH CUSH ATTEN (REMOVE)
EA 7.000 $1,300.000 $785.000 $740.000 $700.000 $797.560 $725.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 7.000 $15,000.000 $7,800.000 $8,760.000 $8,250.000 $7,924.850 $15,000.000
CHAIN LINK FENCE (INSTALL) (8')
LF 464.000 $70.000 $42.750 $50.000 $46.000 $43.430 $50.000
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 4.000 $1,400.000 $2,460.000 $2,600.000 $2,760.000 $1,524.010 $1,500.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 12.000 $4,700.000 $4,875.000 $5,170.000 $5,470.000 $5,384.830 $5,500.000
CONDT (PVC) (SCH 40) (2")
LF 3,913.000 $12.000 $10.000 $11.000 $11.200 $13.210 $13.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 331.000 $33.000 $28.000 $30.000 $31.400 $40.640 $40.000
CONDT (RM) (3/4")
LF 380.000 $18.000 $21.000 $22.000 $23.500 $21.340 $21.000
ELEC CONDR (NO.8) BARE
LF 4,840.000 $1.500 $1.700 $1.800 $1.900 $1.630 $2.000
ELEC CONDR (NO.8) INSULATED
LF 11,814.000 $1.500 $1.750 $1.800 $1.950 $1.780 $2.000
GROUND BOX TY A (122311)W/APRON
EA 12.000 $1,000.000 $999.000 $1,060.000 $1,120.000 $1,219.210 $1,200.000
ELC SRV TY A 240/480 060(SS)SS(T)TP(O)
EA 2.000 $5,000.000 $6,500.000 $6,900.000 $7,295.000 $7,112.040 $7,000.000
ALUMINUM SIGNS (TY G)
SF 771.000 $31.000 $30.000 $30.000 $30.000 $29.770 $27.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 34.000 $692.000 $790.000 $900.000 $850.000 $802.640 $850.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 6.000 $915.000 $845.000 $1,050.000 $985.000 $858.530 $985.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 13.000 $806.000 $1,070.000 $1,110.000 $1,050.000 $1,087.130 $1,050.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 6.000 $875.000 $1,100.000 $1,380.000 $1,300.000 $1,117.610 $1,300.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $2,500.000 $500.000 $2,500.000 $2,350.000 $2,133.610 $2,350.000
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 6.000 $4,000.000 $3,995.000 $9,400.000 $8,850.000 $4,058.940 $9,000.000
RELOCATE SM RD SN SUP&AM TY S80
EA 13.000 $650.000 $785.000 $635.000 $600.000 $797.560 $600.000
REMOVE SM RD SN SUP&AM
EA 22.000 $80.000 $125.900 $80.000 $75.000 $91.440 $100.000
INSTALL LRSS (STRUCT STEEL)
LB 4,448.000 $6.250 $5.750 $7.000 $5.750 $6.400 $6.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 76.000 $50.000 $53.250 $80.000 $75.000 $54.100 $80.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 137.000 $35.000 $22.000 $19.000 $18.000 $22.350 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 38.000 $30.000 $29.250 $34.000 $32.000 $29.720 $35.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 24.000 $30.000 $22.000 $21.000 $20.000 $22.350 $22.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 35.000 $30.000 $28.000 $34.000 $82.000 $28.450 $32.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 1.000 $200.000 $200.000 $210.000 $200.000 $203.200 $200.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 1.000 $300.000 $300.000 $318.000 $300.000 $304.800 $300.000
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 306.000 $4.000 $5.000 $5.300 $5.000 $5.080 $5.580
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 86,773.000 $0.500 $0.420 $0.450 $0.420 $0.430 $0.500
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 6,136.000 $1.000 $0.640 $0.700 $0.640 $0.650 $0.700
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 24.000 $0.700 $30.000 $32.000 $30.000 $30.480 $30.000
WK ZN PAV MRK REMOV (W)6"(BKN W/MRKR)
LF 13,988.000 $5.000 $0.840 $0.900 $0.840 $0.850 $1.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 88,368.000 $0.500 $0.420 $0.450 $0.420 $0.430 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 32,767.000 $0.250 $1.270 $2.000 $2.000 $3.510 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,155.000 $1.500 $0.880 $0.900 $0.880 $0.890 $1.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 895.000 $6.500 $1.100 $1.150 $1.100 $1.120 $1.100
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 130.000 $11.000 $25.000 $27.000 $25.000 $25.400 $25.000
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
LF 10,865.000 $0.650 $0.880 $0.900 $0.880 $0.890 $1.000
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 46,970.000 $0.780 $0.760 $0.800 $0.760 $0.770 $0.750
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 46,135.000 $0.780 $0.760 $0.800 $0.760 $0.770 $0.750
PREFAB PM TY C (W)(LN REDUCT ARROW)
EA 2.000 $500.000 $600.000 $635.000 $600.000 $609.610 $600.000
REFL PAV MRKR TY II-A-A
EA 28.000 $5.500 $15.000 $16.000 $15.000 $15.240 $20.000
REFL PAV MRKR TY II-C-R
EA 754.000 $5.500 $7.500 $8.000 $7.500 $7.620 $10.000
ELIM EXT PM & MRKS (4")
LF 10,217.000 $0.750 $0.500 $0.500 $0.500 $0.510 $0.500
ELIM EXT PM & MRKS (ARROW)
EA 1.000 $220.000 $100.000 $105.000 $100.000 $101.600 $100.000
ELIM EXT PM & MRKS (WORD)
EA 1.000 $220.000 $100.000 $105.000 $100.000 $101.600 $100.000
BONDING COURSE
GAL 30,309.000 $3.500 $2.780 $4.800 $5.500 $4.570 $4.000
INTRLCK ART CONC BLKS (4" MIN)
SF 13,600.000 $12.000 $45.000 $19.000 $8.000 $14.830 $45.000
Totals: $72,543,107.100 $61,607,900.270 $65,488,636.070 $66,334,000.000 $68,640,771.354 $71,675,591.930
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $20,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $20,000.00
CONTRACTOR FORCE ACCOUNT WORK (PART) $15,000.00
MATERIAL FURNISHED BY THE STATE (PART) $40,500.00
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (PART) $9,550.00
Total: $105,050.00