Show Job Controls
Bid Cobra

KENDALL VA (0915-11-032)

Items: 39

County: KENDALL
Length: N/A
Highway: VA
District: SAN ANTONIO
Control Number: 0915-11-032
DBE Goal: N/A
Project: C 915-11-32
Guaranty: N/A
Time: 85 WORKING DAYS
Engineer's Estimate: $617,257.45
Date: 01/07/2022 (4 years ago)
Contract Number: N/A
Type: STATE PARK IMPROVEMENTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$617,257.45
$723,891.20
Over/Under Est: 17.28% $106,633.75
Over/Under Est: 20.5% $126,546.60
Amt Left: 2.75% $19,912.85
Over/Under Est: 62.23% $384,106.20
Amt Left: 38.33% $277,472.45
Delta: -34.63% -$257,559.60

Bid Items & Bid Tabulations

39 Total 0 of 39
KENDALL  |  VA  |  SAN ANTONIO  |  0915-11-032  |  01/07/2022  |  $617,257.45  |  C 915-11-32  |  STATE PARK IMPRVS  |  85 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LCR TOTAL TRANSPORT LLC
TEXAS MATERIALS GROUP, INC.
LONE STAR PAVING COMPANY
BLADING
HR 120.000 $120.000 $140.000 $122.250 $300.000
COMPOST MANUF TOPSOIL (4")
SY 1,335.000 $3.000 $3.000 $11.150 $1.500
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 1,335.000 $0.150 $1.100 $1.000 $1.000
DRILL SEED (TEMP)(WARM OR COOL)
SY 1,335.000 $0.130 $0.900 $0.750 $0.750
VEGETATIVE WATERING
MG 20.830 $25.000 $30.000 $50.000 $40.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 1,335.000 $0.900 $2.250 $2.000 $2.000
ASPH (AC-15P)
GAL 25,144.000 $3.740 $3.700 $4.500 $3.500
AGGR(TY-PB GR-4 SAC-B)
CY 762.000 $135.000 $132.500 $180.000 $140.000
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
TON 1,000.000 $100.000 $88.000 $87.000 $140.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 3,600.000 $42.000 $55.000 $45.000 $75.000
RIPRAP (CONC)(4 IN)
CY 12.000 $420.000 $540.000 $975.000 $1,200.000
MOBILIZATION
LS 1.000 $37,052.000 $61,000.000 $70,000.000 $83,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $5,000.000 $1,650.000 $2,000.000 $8,300.000
ROCK FILTER DAMS (INSTALL) (TY 5)
LF 75.000 $36.000 $71.500 $65.000 $65.000
ROCK FILTER DAMS (REMOVE)
LF 75.000 $8.200 $16.500 $15.000 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 333.000 $20.000 $15.500 $14.000 $14.000
CONSTRUCTION EXITS (REMOVE)
SY 333.000 $4.000 $4.500 $4.000 $4.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,340.000 $2.250 $3.000 $2.550 $2.550
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,340.000 $0.700 $1.000 $0.800 $0.800
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 200.000 $70.000 $200.000 $125.000 $500.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 61.750 $24.000 $26.000 $31.000 $70.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 10.000 $530.000 $605.000 $725.000 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $500.000 $860.000 $1,030.000 $1,000.000
REMOVE SM RD SN SUP&AM
EA 1.000 $100.000 $75.000 $89.000 $300.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,124.000 $2.500 $2.000 $1.000 $1.000
REFL PAV MRK TY II (W) 4" (DOT)
LF 114.000 $0.850 $0.750 $1.950 $1.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 15,370.000 $0.140 $0.250 $0.800 $0.400
REFL PAV MRK TY II (W) 24" (SLD)
LF 288.000 $2.700 $5.500 $6.000 $6.000
REFL PAV MRK TY II (W) (NUMBER)
EA 10.000 $70.000 $275.000 $100.000 $200.000
REFL PAV MRK TY II (W) (WORD)
EA 69.000 $80.000 $110.000 $100.000 $150.000
REFL PAV MRK TY II (W) 18" (YLD TRI)
EA 24.000 $25.000 $27.500 $20.000 $35.000
REFL PAV MRK TY II (W) 36" (YLD TRI)
EA 7.000 $20.000 $33.000 $25.000 $50.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 21,383.000 $0.130 $0.250 $0.500 $0.400
REFL PAV MRK TY II (Y) 24" (SLD)
LF 315.000 $2.850 $5.500 $6.000 $5.000
PRE PM TY B(ACC PRK)(BL&WH)(W/BORDR)LG
EA 28.000 $210.000 $715.000 $200.000 $250.000
REFL PAV MRKR TY II-A-A
EA 400.000 $4.000 $5.500 $5.000 $5.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 90.000 $79.000 $100.000 $55.000 $200.000
TMA (STATIONARY)
DAY 8.000 $200.000 $230.000 $220.000 $625.000
TMA (MOBILE OPERATION)
DAY 10.000 $240.000 $100.000 $250.000 $500.000
Totals: $617,257.450 $723,891.200 $743,804.050 $1,001,363.650