KAUFMAN IH0020 (6481-82-001)

Items: 38

County: KAUFMAN
Length: 0.0100 MILES
Highway: IH0020
District: DALLAS
Control Number: 6481-82-001
DBE Goal: N/A
Project: RMC - A00214578
Guaranty: $28,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,412,845.00
Date: 07/02/2025 (11 months ago) Changed
Contract Number: 7254205
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00214578
Project Description: GUARD FENCE & CABLE BARRIER REPAIR
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
LANE SELMAN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$1,412,845.00
$608,290.00
Over/Under Est: -56.95% -$804,555.00
Over/Under Est: -37.03% -$523,172.75
Amt Left: 46.26% $281,382.25
Over/Under Est: -35.28% -$498,466.25
Amt Left: 50.32% $306,088.75
Delta: -2.78% -$24,706.50
Over/Under Est: -33.76% -$476,965.00
Amt Left: 53.85% $327,590.00
Delta: -2.35% -$21,501.25
$1,260,517.50
Over/Under Est: -10.78% -$152,327.50
Amt Left: 107.22% $652,227.50
Delta: -34.69% -$324,637.50

Bid Items & Bid Tabulations

38 Total 0 of 38
KAUFMAN  |  IH0020  |  DALLAS  |  6481-82-001  |  07/02/2025  |  $1,412,845.00  |  RMC - A00214578  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FIREMAN EXCAVATING, INC.
AUSTIN BARRICADE COMPANY, L.L.C.
ROSS SA ENTERPRISE LLC
BK FIELD OPERATIONS LLC
RHINO EQUITY, LLC
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 50.000 $200.000 $75.000 $55.000 $50.000 $75.000 $65.000
MOBILIZATION (CALLOUT)
EA 450.000 $2,000.000 $1.000 $0.150 $0.250 $1.000 $100.000
TMA (STATIONARY)
DAY 365.000 $250.000 $1.000 $0.150 $0.250 $1.000 $1.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 50.000 $18.000 $20.000 $25.000 $35.000 $100.000 $22.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 150.000 $18.000 $20.000 $25.000 $35.000 $50.000 $22.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 4,000.000 $10.000 $38.000 $24.000 $20.000 $45.000 $15.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 50.000 $35.000 $50.000 $50.000 $50.000 $150.000 $25.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 25.000 $350.000 $50.000 $50.000 $800.000 $1.000 $350.000
REPLACE SHORT RADIUS SYS (TL-2)
EA 10.000 $75.000 $200.000 $5.000 $200.000 $2,000.000 $1.000
REPLACE TIMBER POST W/O CONC FND
EA 300.000 $5.000 $100.000 $50.000 $150.000 $1.000 $100.000
REPLACE STEEL POST W/O CONC FND
EA 50.000 $5.000 $100.000 $75.000 $1.000 $1.000 $80.000
REPLACE STEEL POST W/ CONC FND
EA 10.000 $30.000 $10.000 $75.000 $1.000 $1.000 $80.000
REALIGN POSTS
EA 600.000 $27.000 $1.000 $1.000 $25.000 $1.000 $5.000
REM OBSOLETE GET & REPL W/ SGT
EA 50.000 $3,200.000 $6,000.000 $6,500.000 $3,200.000 $5,000.000 $4,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 50.000 $1,000.000 $500.000 $450.000 $500.000 $500.000 $600.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,500.000 $5.000 $20.000 $22.000 $5.000 $50.000 $45.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 150.000 $100.000 $20.000 $150.000 $50.000 $30.000 $75.000
REPLACE BLOCKOUT
EA 400.000 $1.000 $10.000 $25.000 $5.000 $1.000 $30.000
REPAIR STEEL POST WITH BASE PLATE
EA 50.000 $100.000 $100.000 $80.000 $250.000 $1.000 $50.000
RESET SGT IMPACT HEAD
EA 40.000 $200.000 $50.000 $100.000 $250.000 $100.000 $500.000
REPLACE SGT OBJECT MARKER
EA 50.000 $20.000 $25.000 $25.000 $1.000 $1.000 $30.000
REPLACE SGT CABLE ANCHOR
EA 60.000 $20.000 $25.000 $50.000 $1.000 $1.000 $120.000
REPLACE SGT CABLE ASSEMBLY
EA 60.000 $20.000 $25.000 $50.000 $1.000 $1.000 $150.000
REPLACE SGT STRUT
EA 20.000 $20.000 $25.000 $50.000 $1.000 $1.000 $110.000
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 22.000 $850.000 $300.000 $500.000 $500.000 $750.000 $1,200.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 700.000 $12.000 $15.000 $30.000 $40.000 $50.000 $50.000
REPLACE POSTS (TL-4)(GIBRALTAR)
EA 1,600.000 $10.000 $1.000 $155.000 $180.000 $150.000 $265.000
REPLACE POSTS (TL-4)(TRINITY)
EA 200.000 $10.000 $1.000 $150.000 $125.000 $175.000 $265.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 50.000 $25.000 $100.000 $150.000 $25.000 $100.000 $400.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 25.000 $800.000 $1.000 $50.000 $200.000 $1.000 $100.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 30.000 $500.000 $100.000 $300.000 $1,200.000 $600.000 $1,800.000
REPLACE CABLE (TL-4)
LF 500.000 $5.000 $3.000 $3.000 $1.000 $1.000 $3.000
CHECK / RE-TENSION CABLE (TL-4)
EA 600.000 $7.000 $1.000 $1.000 $200.000 $1.000 $200.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 10.000 $7.000 $100.000 $50.000 $25.000 $1.000 $5.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 5.000 $10.000 $100.000 $25.000 $10.000 $1.000 $1.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 25.000 $2.000 $10.000 $30.000 $10.000 $1.000 $0.500
POST AND CABLE FENCE (REPAIR)
LF 100.000 $2.000 $5.000 $8.000 $1.000 $5.000 $0.500
REPAIR (STEEL POST W/CHANNEL IRON RAIL)
LF 25.000 $15.000 $50.000 $25.000 $1.000 $1.000 $1.000
Totals: $1,412,845.000 $608,290.000 $889,672.250 $914,378.750 $935,880.000 $1,260,517.500