KAUFMAN MR0682 (6463-86-001)

Items: 101

County: KAUFMAN
Length: 0.3640 MILES
Highway: MR0682
District: DALLAS
Control Number: 6463-86-001
DBE Goal: N/A
Project: RMC - A00207367
Guaranty: $87,000.00
Time: 160 WORKING DAYS
Engineer's Estimate: $4,381,737.30
Date: 06/04/2025 (1 year ago)
Contract Number: 6254001
Type: NEW LOCATION OF NON-FREEWAY
Project ID: A00207367
Project Description: NEW ROADWAY, BOX CULVERT, TURN LANES, DITCH GRADING, PAVEMENT MARKINGS, & SIGNING
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
LANE SELMAN
NICHOLAS WADLINGTON
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$4,381,737.30
$4,164,553.25
Over/Under Est: -4.96% -$217,184.05
Over/Under Est: 0.97% $42,686.05
Amt Left: 6.24% $259,870.10
Over/Under Est: 22.3% $977,008.20
Amt Left: 28.68% $1,194,192.25
Delta: -21.12% -$934,322.15
Subcontractor Percentage Amount
PEACHTREE CONSTRUCTION, LTD. 14.43% $593,536.33
UNIFIED PLUMBING & UTILITY CONTRACTORS, LLC 7.38% $303,554.96
J. RUEDAS TRUCKING, LLC 3.23% $132,856.71
BAKER & COMPANY CONSTRUCTION, LLC 2.39% $98,305.74
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 1.21% $49,769.85
FOWLER UNLIMITED, LLC 0.61% $25,090.59
DALLAS LITE AND BARRICADE, INC. 0.51% $20,977.38
TEXOP CONSTRUCTION 0.18% $7,403.78
RANGELINE PIPELINE SERVICES, LLC 0.00% $0.00
Total: 29.94% $1,231,495.34

Bid Items & Bid Tabulations

101 Total 0 of 101
KAUFMAN  |  MR0682  |  DALLAS  |  6463-86-001  |  06/04/2025  |  $4,381,737.30  |  RMC - A00207367  |  NEW LOCATION OF NON-FREEWAY  |  160 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GRANITE CONSTRUCTION COMPANY
ED BELL CONSTRUCTION COMPANY
GREY SKY CONSTRUCTION LLC
PREPARING ROW
STA 21.810 $13,500.000 $19,000.000 $14,000.000 $20,000.000
REMOV CONC (PAV)
SY 224.000 $55.000 $20.000 $30.000 $50.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 95.000 $30.000 $25.000 $30.000 $50.000
REMOV CONC (CURB)
LF 35.000 $50.000 $15.000 $50.000 $50.000
REMOV CONC (CURB & GUTTER)
LF 199.000 $50.000 $25.000 $50.000 $50.000
REMOV CONC (FLUME)
SY 11.000 $130.000 $45.000 $100.000 $50.000
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
SY 29.000 $20.000 $15.000 $35.000 $20.000
RMV (8"-12") TRT/UNTRT BASE & ASPH PAV
SY 301.000 $20.000 $17.000 $45.000 $30.000
RMV (14"-18") TRT/UNTRT BASE & ASPH PAV
SY 1,097.000 $20.000 $24.000 $25.000 $40.000
EXCAV (ROADWAY)
CY 5,335.000 $30.000 $30.000 $8.000 $30.000
EXCAV (CHANNEL)
CY 5,875.000 $25.000 $27.000 $17.000 $50.000
SUBGR WIDEN (OC)
STA 3.850 $1,200.000 $10,000.000 $1,500.000 $650.000
EMBANK (FNL)(OC)(TY A)
CY 204.000 $25.000 $40.000 $75.000 $80.000
EMBANK (FNL)(OC)(TY C)
CY 1,863.000 $30.000 $25.000 $20.000 $80.000
BACKFILL (TY A OR B)
STA 21.810 $402.000 $600.000 $600.000 $650.000
ROAD GRADER WORK (ORD COMP)
STA 21.810 $200.000 $350.000 $100.000 $450.000
FURN & PLACE TOPSOIL (4")
SY 10,327.000 $4.500 $2.000 $4.000 $10.000
BLOCK SODDING
SY 2,517.000 $10.000 $4.500 $5.000 $10.000
DRILL SEED (TEMP_WARM_COOL)
SY 3,408.000 $0.330 $0.400 $0.150 $1.000
HYDRO MULCH SEED (PERM_URBAN_CLAY)
SY 10,327.000 $1.000 $0.450 $1.050 $1.000
VEGETATIVE WATERING
TGL 2,418.000 $10.000 $0.010 $3.000 $20.000
FL BS (CMP IN PLC)(TY D GR 1-2) (10")
SY 7,598.000 $20.000 $35.000 $30.000 $30.000
PRIME COAT (MC-30)
GAL 1,514.000 $11.000 $11.000 $12.000 $10.000
SP MIXES SP-B PG64-22
TON 2,914.000 $160.000 $143.000 $143.500 $180.000
SP MIXES SP-C SAC-B PG64-22
TON 832.000 $175.000 $155.000 $166.750 $220.000
TACK COAT
GAL 454.000 $5.760 $2.000 $2.000 $10.000
TRENCH EXCAVATION PROTECTION
LF 1,256.000 $21.000 $1.000 $6.000 $10.000
RIPRAP (MOW STRIP)(4 IN)
CY 45.000 $800.000 $600.000 $900.000 $550.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 2,152.000 $370.000 $140.000 $215.000 $185.000
CONC BOX CULV (10 FT X 8 FT)
LF 280.000 $1,200.000 $1,885.000 $1,000.000 $1,650.000
RC PIPE (CL III)(24 IN)
LF 108.000 $150.000 $200.000 $150.000 $120.000
RC PIPE (CL III)(36 IN)
LF 310.000 $250.000 $225.000 $170.000 $165.000
RC PIPE (CL III)(42 IN)
LF 141.000 $420.000 $275.000 $220.000 $250.000
JCTBOX(COMPL)(PJB)(5FTX5FT)
EA 2.000 $6,000.000 $5,400.000 $10,000.000 $12,500.000
INLET (COMPL)(PCO)(5FT)(NONE)
EA 1.000 $6,000.000 $5,400.000 $12,000.000 $12,500.000
INLET (COMPL)(PCO)(5FT)(LEFT)
EA 1.000 $8,000.000 $5,600.000 $13,000.000 $12,500.000
INL(CMP)(PAZD-CZ)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $8,000.000 $6,000.000 $10,000.000 $12,500.000
WINGWALL (PW - 1) (HW=8 FT)
EA 1.000 $35,000.000 $45,000.000 $55,000.000 $65,000.000
WINGWALL (PW - 1) (HW=9 FT)
EA 2.000 $42,500.000 $55,000.000 $75,000.000 $75,000.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $2,080.000 $2,500.000 $1,500.000 $2,250.000
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 1.000 $6,000.000 $4,000.000 $6,000.000 $3,500.000
SET (TY II) (42 IN) (RCP) (6: 1) (P)
EA 1.000 $5,000.000 $8,000.000 $7,500.000 $8,500.000
ADJUSTING MANHOLES
EA 1.000 $1,500.000 $1,500.000 $3,000.000 $2,500.000
REMOV STR (INLET)
EA 4.000 $1,000.000 $2,000.000 $2,000.000 $2,500.000
REMOV STR (MANHOLE)
EA 3.000 $1,500.000 $2,000.000 $3,000.000 $2,500.000
REMOV STR (HEADWALL)
EA 2.000 $2,448.000 $2,000.000 $10,000.000 $2,500.000
REMOV STR (PIPE)
LF 2,768.000 $5.000 $10.000 $50.000 $50.000
REMOV STR (BOX CULVERT)
LF 228.000 $322.000 $100.000 $125.000 $200.000
REMOVE STR (BOLLARD)
EA 2.000 $432.000 $250.000 $250.000 $500.000
MOBILIZATION
LS 1.000 $398,340.000 $415,000.000 $450,000.000 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $15,000.000 $3,478.630 $20,000.000 $15,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $10,000.000 $7,500.000 $20,000.000
TMA (STATIONARY)
DAY 60.000 $450.000 $183.330 $150.000 $250.000
TMA (MOBILE OPERATION)
DAY 2.000 $214.000 $900.000 $1,000.000 $550.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 28.000 $30.000 $50.000 $60.000 $50.000
CONSTRUCTION EXITS (REMOVE)
SY 28.000 $15.000 $20.000 $30.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,153.000 $5.000 $3.600 $3.000 $4.000
TEMP SDMT CONT FENCE (INLET PROTECTION)
LF 86.000 $8.000 $8.000 $6.000 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,239.500 $3.000 $1.200 $2.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 500.000 $7.000 $6.000 $6.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 500.000 $3.000 $1.250 $3.000 $9.000
CONC CURB & GUTTER (TY II)
LF 354.000 $140.000 $37.680 $75.000 $85.000
DRIVEWAYS (CONC)
SY 252.000 $140.000 $107.250 $175.000 $100.000
CONC SIDEWALKS (4")
SY 43.000 $90.000 $92.090 $175.000 $72.000
CURB RAMPS (TY 7)
EA 2.000 $3,000.000 $2,625.830 $3,750.000 $3,850.000
MTL W-BEAM GD FEN (TIM POST)
LF 236.000 $30.000 $39.000 $32.250 $50.000
SHORT RADIUS (28")
LF 187.000 $35.000 $51.000 $32.250 $85.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,390.000 $1,525.000 $1,400.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 26.000 $30.000 $4.000 $35.000 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,500.000 $3,100.000 $3,400.000 $3,850.000
CHAIN LINK FENCE (REMOVE)
LF 290.000 $5.000 $6.250 $12.500 $20.000
REMOVE AND INSTALL EXISTING GATE
EA 1.000 $2,000.000 $6,252.920 $3,000.000 $10,000.000
WIRE FENCE (REMOVE)
LF 583.000 $20.000 $2.250 $2.750 $3.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 14.000 $1,200.000 $775.000 $850.000 $1,500.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 5.000 $95.000 $55.000 $60.000 $100.000
INSTL OM ASSM (OM-3R)(WFLX)SRF(BI)
EA 19.000 $300.000 $450.000 $485.000 $100.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 456.000 $2.000 $3.000 $2.150 $6.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 124.000 $10.000 $26.000 $16.700 $20.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 4.000 $175.000 $750.000 $215.000 $250.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 2.000 $250.000 $750.000 $350.000 $500.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $200.000 $750.000 $270.000 $250.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 46.000 $10.000 $26.000 $14.000 $20.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 3,299.000 $1.000 $1.500 $1.350 $3.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 3,567.000 $1.000 $1.500 $1.350 $3.000
REFL PAV MRKR TY I-C
EA 18.000 $6.000 $10.000 $27.000 $6.000
REFL PAV MRKR TY II-A-A
EA 63.000 $6.000 $10.000 $27.000 $6.000
FULL - WIDTH MOWING
CYC 3.000 $2,000.000 $550.000 $2,500.000 $5,000.000
WATER MAIN PIPE(PVC)(12IN)(DR 18)(C900)
LF 174.000 $250.000 $150.000 $525.000 $200.000
CASING STEEL (30IN)
LF 47.000 $400.000 $600.000 $945.000 $850.000
CASING STEEL (24IN)
LF 234.000 $160.000 $575.000 $630.000 $650.000
WATER MAIN PIPE (PVC)(18IN)(DR18)(C900)
LF 198.000 $350.000 $250.000 $630.000 $250.000
12” GATE VALVE
EA 1.000 $6,000.000 $15,000.000 $7,350.000 $12,500.000
18” GATE VALVE (VERTICAL)
EA 1.000 $25,000.000 $35,000.000 $36,750.000 $30,000.000
5’ DROP MANHOLE (PRE-CAST)
EA 3.000 $4,000.000 $15,000.000 $21,000.000 $15,000.000
18” X 18” CUT-IN-TEE
EA 1.000 $20,000.000 $25,000.000 $21,000.000 $20,000.000
18” HORIZONTAL BEND
EA 3.000 $2,000.000 $5,000.000 $6,300.000 $20,000.000
12” HORIZONTAL BEND
EA 2.000 $2,000.000 $4,000.000 $3,675.000 $12,500.000
18”X12” REDUCER
EA 1.000 $2,000.000 $3,000.000 $9,450.000 $15,000.000
12” TO 8” REDUCER
EA 1.000 $2,000.000 $2,700.000 $6,300.000 $12,500.000
PIPE (PVC)(SDR-26)(15IN)
LF 345.000 $150.000 $250.000 $262.500 $150.000
FIRE HYDRANT REMOVE AND REPLACE
EA 2.000 $1,500.000 $10,000.000 $15,750.000 $20,000.000
Totals: $4,381,737.300 $4,164,553.250 $4,424,423.350 $5,358,745.500