KAUFMAN IH0020 (6340-18-001)

Items: 76

County: KAUFMAN
Length: N/A
Highway: IH0020
District: DALLAS
Control Number: 6340-18-001
DBE Goal: N/A
Project: RMC - 634018001
Guaranty: N/A
Time: 730 W
Engineer's Estimate: $1,739,611.00
Date: 04/02/2019 (7 years ago)
Contract Number: N/A
Type: GUARD FENCE & CABLE BARRIER REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$1,739,611.00
$1,802,589.00
Over/Under Est: 3.62% $62,978.00
Over/Under Est: 37.46% $651,592.00
Amt Left: 32.65% $588,614.00
$2,829,440.00
Over/Under Est: 62.65% $1,089,829.00
Amt Left: 56.97% $1,026,851.00
Delta: -18.33% -$438,237.00

Bid Items & Bid Tabulations

76 Total 0 of 76
KAUFMAN  |  IH0020  |  DALLAS  |  6340-18-001  |  04/02/2019  |  $1,739,611.00  |  RMC - 634018001  |  GUARD FENCE & CABLE BARRIER REPAIR  |  730 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
FIREMAN EXCAVATING, INC.
MARCOM'S MOWING SERVICE, LLC
VANN/ELLI, INC.
REMOVING CONC (CURB)
LF 300.000 $3.750 $20.000 $12.500 $40.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 150.000 $160.000 $75.000 $230.000 $300.000
RIPRAP (MOW STRIP)(4 IN)
CY 100.000 $450.000 $450.000 $480.000 $550.000
MOBILIZATION (CALLOUT)
EA 51.000 $500.000 $50.000 $250.000 $1,000.000
CONC CURB (TY II)
LF 300.000 $30.000 $50.000 $32.800 $50.000
MTL W-BEAM GD FEN (TIM POST)
LF 500.000 $25.000 $25.000 $22.800 $24.000
MTL W-BEAM GD FEN (STEEL POST)
LF 500.000 $25.000 $30.000 $25.600 $31.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,150.000 $2,000.000 $1,950.000 $2,800.000
TRANSITION ADJUSTMENT
EA 1.000 $500.000 $3,000.000 $800.000 $1,000.000
SHORT RADIUS
LF 50.000 $28.000 $50.000 $50.000 $42.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,100.000 $1,200.000 $1,350.000 $1,800.000
REMOVE METAL BEAM GUARD FENCE
LF 200.000 $2.000 $10.000 $3.000 $2.000
GUARDRAIL END TREATMENT (INSTALL)
EA 25.000 $2,700.000 $3,000.000 $3,150.000 $3,000.000
CRASH CUSH ATTEN (REMOVE)
EA 5.000 $800.000 $5,000.000 $2,500.000 $2,500.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
EA 2.000 $12,000.000 $10,000.000 $22,300.000 $15,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 5.000 $18,000.000 $5,000.000 $25,100.000 $25,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 100.000 $8.000 $20.000 $30.000 $28.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 100.000 $8.000 $20.000 $30.000 $28.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 100.000 $8.000 $20.000 $30.000 $30.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 100.000 $19.000 $50.000 $30.000 $65.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 100.000 $20.000 $50.000 $30.000 $65.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 20,000.000 $15.000 $17.000 $16.500 $20.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 150.000 $30.000 $30.000 $35.000 $55.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 25.000 $25.000 $50.000 $35.000 $55.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 100.000 $22.000 $40.000 $45.000 $48.000
REM/REPAIR RAIL ELEMENT (CURVED RAIL)
LF 115.000 $22.000 $30.000 $45.000 $48.000
RAISE RAIL ELEMENT
LF 2,000.000 $5.000 $5.000 $4.000 $12.500
REALIGN EXISTING RAIL
LF 150.000 $10.000 $7.000 $13.500 $12.000
REM / REPL TIMBER POST W / O CONC FND
EA 1,500.000 $45.000 $50.000 $52.000 $60.000
REM / REPL STEEL POST W / O CONC FND
EA 21.000 $55.000 $50.000 $68.000 $85.000
REM / REPL TIMBER POST W / CONC FND
EA 50.000 $50.000 $50.000 $80.000 $70.000
REM / REPL STEEL POST W / CONC FND
EA 20.000 $45.000 $80.000 $80.000 $95.000
REALIGN POSTS
EA 585.000 $20.000 $11.000 $20.000 $20.000
REMOVE & REPLACE BLOCKOUT
EA 500.000 $10.000 $12.000 $20.000 $50.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 2,000.000 $30.000 $50.000 $22.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 423.000 $80.000 $60.000 $70.000 $100.000
REPLACE TERMINAL ANCHOR POSTS
EA 5.000 $100.000 $20.000 $190.000 $700.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 80.000 $2,800.000 $2,200.000 $3,150.000 $3,200.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 50.000 $800.000 $1,200.000 $870.000 $1,150.000
REM & RESET SGT IMPACT HEAD
EA 20.000 $150.000 $200.000 $200.000 $200.000
REPLACE SGT CABLE ASSEMBLY
EA 70.000 $60.000 $80.000 $150.000 $75.000
REPLACE SGT CABLE ANCHOR
EA 40.000 $80.000 $100.000 $150.000 $75.000
REPLACE SGT STRUT
EA 30.000 $80.000 $70.000 $150.000 $75.000
REPLACE SGT OBJECT MARKER
EA 50.000 $40.000 $30.000 $60.000 $75.000
REPAIR STEEL POST WITH BASE PLATE
EA 300.000 $200.000 $300.000 $325.000 $400.000
REMOVE & REPLACE STL BLOCKOUT
EA 600.000 $25.000 $40.000 $42.000 $50.000
REPLACE POSTS (TL-3)
EA 100.000 $100.000 $100.000 $150.000 $140.000
REPLACE POSTS (TL-4)
EA 2,500.000 $50.000 $120.000 $151.000 $150.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 10.000 $300.000 $175.000 $300.000 $400.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 50.000 $130.000 $175.000 $300.000 $400.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 10.000 $700.000 $100.000 $125.000 $100.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 100.000 $405.000 $100.000 $125.000 $100.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 10.000 $1,350.000 $750.000 $2,300.000 $2,500.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 30.000 $1,000.000 $1,000.000 $2,300.000 $2,500.000
REPLACE CABLE (TL-3)
LF 500.000 $4.000 $3.000 $4.000 $4.000
REPLACE CABLE (TL-4)
LF 500.000 $4.000 $3.000 $4.000 $4.000
CHECK / RE-TENSION CABLE
EA 200.000 $80.000 $150.000 $125.000 $300.000
POST AND CABLE FENCE (REMOVAL)
LF 50.000 $4.000 $3.000 $6.000 $2.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 500.000 $10.000 $7.000 $7.500 $6.500
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 25.000 $70.000 $50.000 $200.000 $300.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 50.000 $70.000 $60.000 $80.000 $65.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 1.000 $90.000 $100.000 $250.000 $500.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 500.000 $5.000 $5.000 $4.000 $3.000
POST AND CABLE FENCE (REPAIR)
LF 200.000 $4.000 $4.000 $10.000 $5.000
REPAIR REACT (CYLINDERS)
EA 4.000 $2,800.000 $3,000.000 $3,800.000 $4,000.000
REMOVE AND REPLACE (SMTC) (N)
EA 5.000 $16,000.000 $5,000.000 $25,100.000 $32,000.000
REPAIR (BEAT - SSCC)
EA 1.000 $3,000.000 $4,000.000 $8,500.000 $6,500.000
REPAIR (TRACC) (BAY)
EA 10.000 $650.000 $500.000 $1,380.000 $2,500.000
REPAIR (SMTC) (N)
LF 162.400 $165.000 $10.000 $500.000 $400.000
REMOVE & RESET IMPACT HEAD(BEAT - SSCC)
EA 2.000 $1,000.000 $2,000.000 $1,000.000 $1,000.000
REMOVE & REPLACE BEAT - SSCC
LF 100.000 $50.000 $10.000 $72.000 $500.000
REMOVE & REPLACE IMPACT HEAD(BEAT-SSCC)
EA 2.000 $3,500.000 $3,000.000 $2,250.000 $2,000.000
REPAIR (BEAT - SSCC)
LF 50.000 $100.000 $7.000 $200.000 $500.000
REPAIR (STEEL POST W/ W-BEAM - T101)
LF 1,000.000 $105.000 $35.000 $118.000 $150.000
REPAIR(STEEL POST W/ CHANNEL IRON RAIL)
LF 200.000 $55.000 $100.000 $150.000 $100.000
TMA (STATIONARY)
EA 1.000 $18,000.000 $40,000.000 $5,500.000 $45,000.000
Totals: $1,739,611.000 $1,802,589.000 $2,391,203.000 $2,829,440.000