Show Job Controls
Bid Cobra

KAUFMAN IH0020 (6319-42-001)

Items: 67

County: KAUFMAN
Length: N/A
Highway: IH0020
District: DALLAS
Control Number: 6319-42-001
DBE Goal: N/A
Project: RMC - 631942001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $1,087,219.50
Date: 10/03/2017 (8 years ago)
Contract Number: N/A
Type: GUARD FENCE & CABLE BARRIER REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$1,087,219.50
$1,196,615.25
Over/Under Est: 10.06% $109,395.75
Over/Under Est: 53.77% $584,592.50
Amt Left: 39.71% $475,196.75

Bid Items & Bid Tabulations

67 Total 0 of 67
KAUFMAN  |  IH0020  |  DALLAS  |  6319-42-001  |  10/03/2017  |  $1,087,219.50  |  RMC - 631942001  |  GUARD FENCE & CABLE BARRIER REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
VANN/ELLI, INC.
MARCOM'S MOWING SERVICE, LLC
REMOVING CONC (CURB)
LF 300.000 $30.000 $10.000 $50.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 150.000 $160.000 $250.000 $148.000
RIPRAP (MOW STRIP)(4 IN)
CY 100.000 $450.000 $450.000 $400.000
MOBILIZATION (CALLOUT)
EA 51.000 $500.000 $100.000 $500.000
CONC CURB (TY II)
LF 300.000 $50.000 $28.000 $60.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,000.000 $20.000 $19.000 $22.500
MTL W-BEAM GD FEN (STEEL POST)
LF 1,000.000 $20.000 $21.000 $24.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,300.000 $1,610.000 $1,850.000
TRANSITION ADJUSTMENT
EA 1.000 $520.000 $600.000 $1,850.000
SHORT RADIUS
LF 35.000 $70.000 $28.000 $50.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,500.000 $1,100.000 $1,200.000
REMOVE METAL BEAM GUARD FENCE
LF 553.000 $3.500 $2.000 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $2,250.000 $2,700.000 $3,300.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 100.000 $15.000 $35.000 $60.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 100.000 $17.000 $35.000 $30.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 9,150.000 $18.000 $10.500 $21.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 150.000 $25.000 $30.000 $40.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 25.000 $30.000 $30.000 $100.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 50.000 $25.000 $19.250 $35.000
REM/REPAIR RAIL ELEMENT (CURVED RAIL)
LF 115.000 $25.000 $19.250 $35.000
RAISE RAIL ELEMENT
LF 2,000.000 $2.000 $3.000 $8.000
REALIGN EXISTING RAIL
LF 150.000 $10.000 $10.000 $10.000
REM / REPL TIMBER POST W / O CONC FND
EA 600.000 $30.000 $45.000 $55.000
REM / REPL STEEL POST W / O CONC FND
EA 21.000 $100.000 $55.000 $200.000
REM / REPL TIMBER POST W / CONC FND
EA 4.000 $100.000 $50.000 $100.000
REM / REPL STEEL POST W / CONC FND
EA 20.000 $125.000 $60.000 $100.000
REALIGN POSTS
EA 585.000 $2.000 $15.000 $20.000
REMOVE & REPLACE BLOCKOUT
EA 251.000 $25.000 $20.000 $18.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 4,973.000 $25.000 $16.000 $25.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 423.000 $38.000 $80.000 $125.000
REPLACE TERMINAL ANCHOR POSTS
EA 2.000 $100.000 $500.000 $250.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 10.000 $2,600.000 $2,700.000 $4,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 50.000 $1,100.000 $800.000 $1,000.000
REM & RESET SGT IMPACT HEAD
EA 135.000 $80.000 $100.000 $250.000
REPLACE SGT CABLE ASSEMBLY
EA 70.000 $80.000 $50.000 $125.000
REPLACE SGT CABLE ANCHOR
EA 68.000 $100.000 $50.000 $125.000
REPLACE SGT STRUT
EA 49.000 $90.000 $50.000 $125.000
REPLACE SGT OBJECT MARKER
EA 50.000 $22.000 $40.000 $50.000
REPAIR STEEL POST WITH BASE PLATE
EA 300.000 $185.000 $200.000 $250.000
REMOVE & REPLACE STL BLOCKOUT
EA 600.000 $110.000 $25.000 $30.000
REPLACE POSTS (TL-3)
EA 216.000 $100.000 $100.000 $110.000
REPLACE POSTS (TL-4)
EA 2,000.000 $25.000 $120.000 $125.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 10.000 $227.000 $300.000 $500.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 43.000 $180.000 $300.000 $250.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 10.000 $235.000 $100.000 $125.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 50.000 $520.000 $100.000 $125.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 10.000 $550.000 $2,000.000 $2,100.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 30.000 $230.000 $2,000.000 $2,100.000
REPLACE CABLE (TL-3)
LF 500.000 $30.000 $3.000 $5.000
REPLACE CABLE (TL-4)
LF 1,000.000 $75.000 $3.000 $5.000
CHECK / RE-TENSION CABLE
EA 160.000 $20.000 $150.000 $500.000
POST AND CABLE FENCE (REMOVAL)
LF 50.000 $10.000 $2.000 $30.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 1,000.000 $10.000 $5.000 $10.000
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 15.000 $17.000 $200.000 $200.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 25.000 $60.000 $50.000 $75.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 1.000 $120.000 $200.000 $1,000.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 1,500.000 $7.000 $3.000 $5.000
POST AND CABLE FENCE (REPAIR)
LF 650.000 $3.000 $5.000 $10.000
REPAIR REACT (CYLINDERS)
EA 4.000 $1,000.000 $2,800.000 $3,000.000
REPAIR (BEAT - SSCC)
EA 1.000 $2,500.000 $3,000.000 $3,000.000
REPAIR (TRACC) (BAY)
EA 36.000 $550.000 $1,100.000 $825.000
REMOVE & RESET IMPACT HEAD(BEAT - SSCC)
EA 2.000 $1,000.000 $1,000.000 $500.000
REMOVE & REPLACE BEAT - SSCC
LF 100.000 $10.000 $50.000 $500.000
REMOVE & REPLACE IMPACT HEAD(BEAT-SSCC)
EA 2.000 $1,500.000 $1,500.000 $1,500.000
REPAIR (BEAT - SSCC)
LF 50.000 $10.000 $100.000 $300.000
REPAIR (STEEL POST W/ W-BEAM - T101)
LF 1,000.000 $35.000 $100.000 $125.000
REPAIR(STEEL POST W/ CHANNEL IRON RAIL)
LF 200.000 $50.000 $55.000 $125.000
Totals: $1,087,219.500 $1,196,615.250 $1,671,812.000