KAUFMAN FM 2727 (2746-01-009)

Items: 120

County: KAUFMAN
Length: 8.3960 MILES
Highway: FM 2727
District: DALLAS
Control Number: 2746-01-009
DBE Goal: 0.0%
Project: C 2746-1-9
Guaranty: $100,000.00
Time: 381 WORKING DAYS
Engineer's Estimate: $18,042,937.69
Date: 04/03/2025 (1 year ago)
Contract Number: 4253004
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00064052
Project Description: RESTORE EXISTING PAVEMENT AND ADD SHOULDERS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
LANE SELMAN
NICHOLAS WADLINGTON
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (9)
E
Engineer's Estimate
$18,042,937.69
$16,864,509.37
Over/Under Est: -6.53% -$1,178,428.32
Over/Under Est: -4.12% -$743,509.65
Amt Left: 2.58% $434,918.67
Over/Under Est: -3.69% -$665,146.40
Amt Left: 3.04% $513,281.92
Delta: -0.45% -$78,363.25
Over/Under Est: 0.86% $155,472.35
Amt Left: 7.91% $1,333,900.67
Delta: -4.72% -$820,618.75
Over/Under Est: 8.99% $1,622,275.71
Amt Left: 16.61% $2,800,704.03
Delta: -8.06% -$1,466,803.36
Over/Under Est: 13.86% $2,500,983.36
Amt Left: 21.82% $3,679,411.68
Delta: -4.47% -$878,707.65
Over/Under Est: 18.24% $3,290,966.26
Amt Left: 26.5% $4,469,394.58
Delta: -3.85% -$789,982.90
Over/Under Est: 18.97% $3,422,783.32
Amt Left: 27.28% $4,601,211.64
Delta: -0.62% -$131,817.06
Over/Under Est: 26.29% $4,743,891.02
Amt Left: 35.12% $5,922,319.34
Delta: -6.15% -$1,321,107.70
Subcontractor Percentage Amount
A.L. CONSTRUCTION LLC 3.42% $571,243.35
TRP CONSTRUCTION GROUP, LLC 0.94% $157,008.41
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.73% $121,932.06
MARCOMS CONSTRUCTION LLC 0.64% $106,899.34
COLD CREEK CONSTRUCTION, LTD 0.47% $78,504.20
DUSTIN ALLEN, INC. 0.40% $66,812.09
PANOLA SIGN & BARRICADE, INC. 0.25% $41,757.55
Total: 6.85% $1,144,157.00

Bid Items & Bid Tabulations

120 Total 0 of 120
KAUFMAN  |  FM 2727  |  DALLAS  |  2746-01-009  |  04/03/2025  |  $18,042,937.69  |  C 2746-1-9  |  REHAB EXIST ROADWAY  |  381 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
BAKER & COMPANY CONSTRUCTION, LLC
A. K. GILLIS & SONS, LLC
D. L. LENNON INCORPORATED - CONTRACTOR
GREY SKY CONSTRUCTION LLC
TEXAS MATERIALS GROUP, INC.
GRANITE CONSTRUCTION COMPANY
ED BELL CONSTRUCTION COMPANY
HIGHWAY 19 CONSTRUCTION LLC
PREPARING ROW
STA 443.440 $750.000 $550.000 $272.000 $540.000 $1,188.000 $3,000.000 $2,000.000 $4,700.000 $1,924.000 $1,050.000
REMOV CONC (DRIVEWAYS)
SY 1,319.000 $18.300 $25.000 $12.350 $12.000 $12.000 $20.000 $46.177 $15.000 $31.500 $25.000
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
SY 16,642.000 $6.000 $8.500 $7.100 $9.020 $4.350 $11.000 $10.000 $5.000 $8.400 $3.800
RMV (19") TRT/UNTRT BASE & ASPH PAV
SY 8,599.000 $15.000 $9.000 $7.700 $18.700 $8.250 $20.000 $16.380 $15.000 $12.600 $5.400
RMV (0"-10") TRT/UNTRT BASE & ASPH PAV
SY 2,904.000 $11.750 $8.000 $8.900 $18.650 $7.250 $20.000 $9.110 $7.500 $9.450 $6.250
EXCAV (ROADWAY)
CY 4,461.000 $21.670 $40.000 $32.600 $20.000 $9.300 $20.000 $17.000 $14.000 $10.000 $24.000
SUBGR WIDEN (OC)
STA 401.010 $200.000 $300.000 $407.000 $275.000 $535.000 $250.000 $365.000 $200.000 $525.000 $375.000
EMBANK (FNL)(OC)(TY C)
CY 8,950.000 $30.000 $35.000 $31.600 $20.000 $12.250 $30.000 $32.000 $22.000 $27.500 $30.000
BACKFILL (TY A OR B)
STA 449.440 $300.000 $280.000 $238.000 $300.000 $490.000 $250.000 $285.000 $170.000 $525.000 $500.000
ROAD GRADER WORK (ORD COMP)
STA 443.440 $250.000 $250.000 $195.000 $375.000 $365.000 $250.000 $205.000 $150.000 $525.000 $350.000
DRILL SEED (PERM_RURAL_CLAY)
SY 351,707.000 $0.250 $0.130 $0.280 $0.250 $0.250 $0.350 $0.250 $0.120 $0.190 $0.250
DRILL SEED (TEMP_WARM_COOL)
SY 351,707.000 $0.250 $0.130 $0.180 $0.250 $0.200 $0.350 $0.210 $0.130 $0.170 $0.250
VEGETATIVE WATERING
TGL 104,650.000 $1.000 $0.100 $1.000 $0.010 $0.010 $2.000 $0.010 $0.010 $0.100 $50.000
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
SY 15,101.000 $14.000 $17.000 $19.900 $16.690 $22.000 $16.000 $18.000 $20.000 $14.000 $16.750
FL BS (CMP IN PLC)(TY D GR 1-2) (10")
SY 141,453.000 $25.000 $29.000 $27.350 $27.030 $34.000 $20.000 $29.000 $25.000 $23.000 $21.750
REWORK BS MTL (TY C)(10")(ORD COMP)
SY 98,015.000 $4.000 $1.300 $5.250 $3.000 $4.000 $6.000 $5.250 $5.000 $5.000 $1.950
CEMENT
TON 893.000 $295.000 $245.000 $275.000 $216.000 $230.000 $265.000 $260.000 $250.000 $244.000 $225.000
CEMENT TRT (EXIST MATL)(6")
SY 136,200.000 $3.000 $2.200 $5.220 $3.000 $4.000 $6.000 $2.600 $4.000 $3.000 $3.150
CEMENT TRT (NEW BASE)(6")
SY 15,101.000 $5.000 $2.200 $5.400 $3.000 $4.000 $12.000 $2.600 $5.000 $3.500 $3.450
PRIME COAT(MC-30 OR AE-P)
GAL 42,436.000 $6.920 $4.500 $6.100 $6.000 $4.320 $3.000 $5.500 $4.300 $4.840 $5.000
ASPH (CRS-2P)
GAL 85,818.000 $7.000 $3.500 $5.320 $5.220 $3.610 $3.000 $4.850 $4.300 $4.840 $4.500
ASPH (RC-250)
GAL 13,212.000 $11.000 $4.500 $5.950 $5.830 $4.220 $3.000 $4.700 $6.000 $7.760 $5.000
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 19,811.000 $7.000 $4.500 $8.250 $5.560 $3.860 $3.000 $5.050 $4.750 $5.390 $4.500
AGGR (TY-B, GR-3)(SAC-B)
CY 1,195.000 $200.000 $180.000 $121.400 $172.240 $93.250 $225.000 $248.000 $225.000 $240.900 $235.000
AGGR (TY-B, GR-4)(SAC-B)
CY 1,361.000 $190.000 $180.000 $121.400 $162.250 $83.250 $225.000 $220.000 $190.000 $201.300 $235.000
AGGR (TY-B, GR-5)(SAC-B)
CY 580.000 $215.000 $100.000 $110.900 $154.240 $0.010 $225.000 $149.000 $220.000 $227.700 $175.000
AGGR (TY-L, GR-5)(SAC-B)
CY 580.000 $215.000 $150.000 $121.000 $154.240 $63.000 $225.000 $149.000 $218.000 $218.900 $180.000
SP MIXES SP-C SAC-B PG64-22
TON 23,345.000 $145.000 $140.000 $144.850 $135.950 $145.000 $160.000 $151.000 $170.000 $155.550 $164.000
TEMPORARY SPL SHORING
SF 2,604.000 $60.000 $50.000 $21.900 $5.000 $65.000 $65.000 $34.633 $50.000 $99.970 $55.000
RIPRAP (CONC)(5 IN)
CY 74.000 $850.000 $660.000 $880.000 $625.000 $625.000 $650.000 $1,038.000 $500.000 $969.870 $750.000
RIPRAP (MOW STRIP)(4 IN)
CY 78.000 $600.000 $660.000 $633.000 $625.000 $625.000 $550.000 $1,038.000 $550.000 $1,171.280 $550.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 753.000 $163.500 $130.000 $135.000 $285.400 $290.000 $185.000 $225.000 $250.000 $269.240 $180.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,651.000 $225.500 $130.000 $132.700 $285.400 $290.000 $170.000 $225.000 $255.000 $254.330 $180.000
RAIL (TY T631)
LF 362.000 $95.000 $80.000 $85.000 $102.450 $152.000 $250.000 $107.000 $77.000 $102.850 $140.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 10.000 $769.000 $1,000.000 $632.500 $975.000 $975.000 $1,000.000 $900.000 $600.000 $1,019.640 $800.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 30.000 $798.000 $1,100.000 $688.000 $1,075.000 $1,075.000 $1,100.000 $945.000 $620.000 $1,030.430 $750.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 6.000 $825.000 $1,200.000 $825.000 $1,125.000 $1,125.000 $1,200.000 $1,025.000 $750.000 $1,070.240 $800.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 15.000 $880.000 $1,200.000 $908.000 $1,175.000 $1,175.000 $1,500.000 $1,050.000 $850.000 $1,115.070 $1,000.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 33.000 $915.000 $1,300.000 $963.000 $1,225.000 $1,225.000 $1,600.000 $1,250.000 $875.000 $1,164.570 $1,100.000
CONC BOX CULV (8 FT X 6 FT)(EXTEND)
LF 28.000 $975.000 $1,500.000 $1,045.000 $1,375.000 $1,375.000 $2,000.000 $1,700.000 $900.000 $1,361.450 $1,200.000
CONC BOX CULV (10 FT X 5 FT)(EXTEND)
LF 19.000 $1,250.000 $1,500.000 $1,320.000 $1,400.000 $1,400.000 $2,000.000 $2,125.000 $1,100.000 $1,632.050 $1,500.000
RC PIPE (CL III)(18 IN)
LF 4,670.000 $65.000 $53.000 $60.250 $50.000 $50.000 $70.000 $69.000 $65.000 $89.250 $50.000
RC PIPE (CL III)(24 IN)
LF 1,228.000 $95.000 $90.000 $85.000 $85.000 $85.000 $95.000 $160.000 $80.000 $137.080 $70.000
RC PIPE (CL III)(30 IN)
LF 20.000 $135.000 $125.000 $126.000 $120.000 $120.000 $185.000 $228.000 $110.000 $191.110 $88.000
RC PIPE (CL III)(36 IN)
LF 40.000 $150.000 $175.000 $156.000 $165.000 $165.000 $200.000 $327.000 $130.000 $247.540 $182.000
RC PIPE (CL IV)(24 IN)
LF 90.000 $135.000 $110.000 $108.000 $105.000 $105.000 $165.000 $183.000 $160.000 $811.760 $148.000
RC PIPE (CL IV)(36 IN)
LF 30.000 $158.000 $220.000 $194.000 $200.000 $200.000 $185.000 $344.000 $250.000 $1,002.890 $198.000
RC PIPE (CL IV)(48 IN)
LF 13.000 $175.000 $350.000 $532.000 $330.000 $330.000 $350.000 $459.000 $400.000 $1,034.250 $314.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 6.000 $6,325.000 $7,500.000 $6,050.000 $7,000.000 $7,000.000 $3,500.000 $5,700.000 $6,000.000 $7,167.140 $6,000.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 4.000 $8,000.000 $11,000.000 $9,625.000 $10,000.000 $10,000.000 $5,500.000 $9,200.000 $8,500.000 $11,567.270 $9,000.000
HEADWALL (CH - PW - S) (DIA= 36 IN)
EA 2.000 $8,500.000 $12,000.000 $10,175.000 $11,000.000 $11,000.000 $5,500.000 $9,795.000 $8,500.000 $10,247.660 $14,000.000
HEADWALL (CH - PW - S) (DIA= 48 IN)
EA 2.000 $9,000.000 $15,000.000 $14,025.000 $14,000.000 $14,000.000 $12,500.000 $16,000.000 $15,000.000 $15,857.660 $12,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $30,000.000 $35,000.000 $29,840.000 $33,000.000 $33,000.000 $30,000.000 $30,000.000 $35,000.000 $33,897.660 $21,000.000
WINGWALL (PW - 1) (HW=9 FT)
EA 2.000 $43,000.000 $48,000.000 $50,490.000 $46,000.000 $46,000.000 $35,000.000 $51,000.000 $55,000.000 $48,417.660 $27,000.000
WINGWALL (PW - 2) (HW=5 FT)
EA 8.000 $15,000.000 $20,000.000 $14,850.000 $19,000.000 $19,000.000 $25,000.000 $11,250.000 $15,000.000 $15,857.070 $15,000.000
WINGWALL (PW - 2) (HW=6 FT)
EA 2.000 $17,500.000 $24,000.000 $16,885.000 $23,000.000 $23,000.000 $30,000.000 $18,000.000 $25,000.000 $24,327.660 $18,000.000
WINGWALL (PW - 2) (HW=7 FT)
EA 2.000 $20,000.000 $35,000.000 $30,745.000 $33,000.000 $33,000.000 $35,000.000 $22,900.000 $35,000.000 $25,317.660 $21,000.000
WINGWALL (PW - 2) (HW=8 FT)
EA 2.000 $22,500.000 $45,000.000 $35,750.000 $43,000.000 $43,000.000 $42,500.000 $30,000.000 $45,000.000 $35,107.660 $24,000.000
WINGWALL (SW - 0) (HW=3 FT)
EA 2.000 $12,000.000 $6,500.000 $10,750.000 $6,000.000 $6,000.000 $21,000.000 $5,700.000 $15,000.000 $6,727.660 $9,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 353.000 $1,000.000 $900.000 $980.000 $825.000 $825.000 $1,000.000 $1,000.000 $1,100.000 $852.060 $795.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 4.000 $1,200.000 $1,200.000 $1,820.000 $1,100.000 $1,100.000 $1,500.000 $2,050.000 $1,200.000 $2,118.130 $1,100.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 89.000 $1,500.000 $1,400.000 $1,460.000 $1,300.000 $1,300.000 $1,500.000 $2,500.000 $1,600.000 $1,404.790 $1,350.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,500.000 $2,600.000 $2,850.000 $2,500.000 $2,500.000 $3,500.000 $3,950.000 $2,200.000 $2,462.390 $2,500.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 4.000 $6,917.000 $6,900.000 $6,000.000 $6,500.000 $6,500.000 $4,000.000 $6,250.000 $5,500.000 $6,479.210 $5,500.000
CLEAN EXIST CULVERTS
EA 19.000 $1,600.000 $1,300.000 $2,010.000 $1,200.000 $1,200.000 $1,500.000 $1,150.000 $300.000 $4,436.450 $2,000.000
REMOV STR (SET)
EA 38.000 $500.000 $160.000 $450.000 $150.000 $150.000 $500.000 $625.000 $250.000 $515.990 $1,000.000
REMOV STR (WINGWALL)
EA 20.000 $1,665.000 $1,100.000 $3,040.000 $1,000.000 $1,000.000 $2,500.000 $1,100.000 $2,500.000 $8,183.120 $1,000.000
REMOV STR (HEADWALL)
EA 22.000 $1,362.000 $1,100.000 $770.000 $1,000.000 $1,000.000 $2,500.000 $1,100.000 $2,500.000 $5,455.410 $500.000
REMOV STR (PIPE)
LF 226.000 $29.570 $11.000 $75.000 $10.000 $10.000 $50.000 $33.000 $300.000 $68.360 $50.000
MOBILIZATION
LS 1.000 $1,607,539.790 $1,000,000.000 $677,000.000 $1,291,374.896 $1,137,458.000 $1,900,000.000 $1,866,711.000 $2,000,000.000 $2,162,000.000 $1,800,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $15,000.000 $16,000.000 $14,573.000 $10,450.000 $5,684.020 $12,500.000 $21,000.000 $25,000.000 $31,500.000 $7,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $7,500.000 $12,000.000 $11,000.000 $19,500.000 $15,000.000 $20,000.000 $28,000.000 $9,403.750 $21,000.000 $15,000.000
TMA (STATIONARY)
DAY 381.000 $267.000 $250.000 $305.000 $200.000 $250.000 $250.000 $375.000 $170.000 $157.500 $250.000
TMA (MOBILE OPERATION)
DAY 40.000 $183.120 $250.000 $1,505.000 $200.000 $250.000 $550.000 $1.000 $850.000 $1,155.000 $750.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 210.000 $50.000 $41.000 $44.000 $70.000 $50.000 $50.000 $115.000 $42.170 $71.500 $50.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 315.000 $65.000 $77.000 $88.000 $105.000 $80.000 $50.000 $82.000 $82.300 $93.500 $80.000
ROCK FILTER DAMS (REMOVE)
LF 525.000 $10.000 $12.000 $22.000 $15.000 $10.000 $20.000 $13.000 $40.640 $44.000 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 164.000 $30.000 $20.000 $55.000 $30.000 $50.000 $40.000 $41.000 $48.520 $33.000 $50.000
CONSTRUCTION EXITS (REMOVE)
SY 164.000 $15.000 $5.000 $11.000 $10.000 $10.000 $20.000 $10.750 $15.220 $18.150 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,741.000 $3.000 $3.200 $3.600 $5.000 $5.000 $4.000 $4.500 $2.980 $3.300 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,741.000 $1.000 $1.000 $1.100 $2.000 $1.000 $2.000 $1.100 $1.010 $1.650 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,292.000 $6.000 $3.700 $3.150 $8.000 $8.000 $18.000 $5.850 $3.540 $5.500 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,292.000 $1.000 $1.000 $1.100 $1.000 $1.000 $9.000 $1.150 $0.910 $2.750 $1.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 2.000 $7,878.000 $7,500.000 $14,850.000 $9,500.000 $9,500.000 $8,500.000 $8,000.000 $20,000.000 $11,550.000 $8,500.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 180.000 $55.000 $86.000 $101.000 $55.000 $81.000 $100.000 $88.000 $35.000 $52.500 $30.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 540.000 $30.000 $35.000 $55.000 $35.000 $25.000 $20.000 $20.000 $10.000 $31.500 $22.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 180.000 $20.000 $65.000 $72.700 $55.000 $35.000 $20.000 $30.000 $15.000 $42.000 $22.000
DRIVEWAYS (CONC) (HES)
SY 1,366.000 $150.000 $110.000 $236.500 $100.000 $115.000 $100.000 $220.000 $100.000 $126.000 $95.000
DRIVEWAYS (ACP)
SY 16,744.000 $50.000 $75.000 $52.500 $78.780 $68.000 $35.000 $88.000 $95.000 $116.420 $72.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 85,425.000 $0.250 $0.260 $0.180 $0.270 $0.266 $0.500 $0.300 $0.220 $0.140 $0.240
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 38,365.000 $0.250 $0.260 $0.180 $0.340 $0.318 $0.500 $0.370 $0.220 $0.140 $0.240
MTL W-BEAM GD FEN (TIM POST)
LF 650.000 $24.800 $23.000 $23.650 $21.500 $21.500 $30.000 $28.000 $21.500 $27.500 $33.350
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,079.410 $3,200.000 $3,300.000 $3,000.000 $3,000.000 $3,250.000 $3,400.000 $3,000.000 $3,300.000 $3,355.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $2,000.000 $1,100.000 $2,750.000 $2,500.000 $2,500.000 $6,500.000 $930.000 $500.000 $1,750.000 $1,145.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $2,000.000 $1,100.000 $11,000.000 $1,000.000 $1,000.000 $2,500.000 $1,385.000 $220.000 $1,000.000 $795.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $15,000.000 $9,200.000 $9,240.000 $8,400.000 $8,400.000 $21,000.000 $8,250.000 $6,000.000 $10,500.000 $7,469.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 107.000 $300.000 $250.000 $358.000 $220.000 $185.000 $850.000 $245.000 $220.000 $319.000 $325.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 17.000 $400.000 $270.000 $380.000 $255.000 $285.000 $850.000 $285.000 $255.000 $346.500 $345.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 9.000 $725.000 $580.000 $853.000 $550.000 $750.000 $850.000 $620.000 $550.000 $792.000 $775.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 76.000 $750.250 $720.000 $688.000 $685.000 $800.000 $1,050.000 $770.000 $631.310 $709.500 $625.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 17.000 $800.000 $860.000 $803.000 $815.000 $900.000 $1,050.000 $900.000 $737.370 $786.500 $730.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $833.000 $1,000.000 $853.000 $955.000 $800.000 $1,050.000 $1,050.000 $782.830 $764.500 $775.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,271.670 $1,400.000 $1,645.000 $1,300.000 $2,000.000 $1,050.000 $1,425.000 $1,510.100 $1,314.500 $1,495.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 20.000 $35.000 $29.000 $30.000 $27.000 $65.000 $100.000 $22.000 $15.150 $22.000 $15.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 68.000 $70.000 $70.000 $61.000 $65.000 $65.000 $100.000 $50.000 $55.560 $66.000 $55.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 694.000 $1.470 $0.750 $6.800 $2.450 $2.000 $6.000 $1.200 $4.000 $5.250 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 5,542.000 $1.630 $0.750 $2.050 $2.450 $2.000 $6.000 $1.200 $4.000 $5.250 $1.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 322.000 $2.450 $2.200 $2.200 $2.000 $2.000 $8.000 $2.210 $2.020 $2.130 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,845.000 $1.360 $1.150 $1.100 $0.970 $0.970 $8.000 $1.050 $0.810 $1.030 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 185.000 $8.620 $9.000 $7.700 $6.000 $6.000 $20.000 $6.700 $7.070 $6.390 $7.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 16.000 $168.630 $180.000 $143.000 $140.000 $140.000 $250.000 $155.000 $202.020 $149.100 $130.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 16.000 $198.810 $215.000 $165.000 $170.000 $170.000 $250.000 $189.000 $227.270 $181.050 $150.000
RE PM TY II (W) 6" (SLD)
LF 700.000 $0.330 $0.300 $2.200 $2.000 $2.000 $3.000 $2.150 $0.510 $2.130 $2.000
RE PM TY II (W) 24" (SLD)
LF 22.000 $5.570 $3.500 $5.500 $8.000 $8.000 $20.000 $8.950 $1.010 $8.520 $5.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 88,019.000 $0.900 $0.700 $0.750 $0.560 $0.560 $1.000 $0.600 $0.560 $0.600 $0.670
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 28,438.000 $1.000 $0.800 $0.830 $0.630 $0.630 $1.000 $0.700 $0.660 $0.670 $0.750
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 40,469.000 $0.900 $0.700 $0.750 $0.560 $0.560 $1.000 $0.610 $0.560 $0.600 $0.670
REFL PAV MRKR TY I-C
EA 97.000 $5.610 $5.500 $5.500 $5.000 $5.000 $6.000 $5.610 $5.050 $5.330 $5.000
REFL PAV MRKR TY II-A-A
EA 1,375.000 $5.550 $5.500 $5.500 $5.000 $5.000 $6.000 $5.610 $3.990 $5.330 $5.000
FULL - WIDTH MOWING
CYC 6.000 $5,500.000 $5,000.000 $7,150.000 $3,000.000 $3,500.000 $5,000.000 $6,150.000 $8,000.000 $10,000.000 $2,500.000
Totals: $18,042,937.690 $16,864,509.370 $17,299,428.040 $17,377,791.286 $18,198,410.040 $19,665,213.400 $20,543,921.055 $21,333,903.950 $21,465,721.010 $22,786,828.710
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $10,000.00
Total: $20,000.00