Bid Cobra

KAUFMAN FM 148 (0751-03-043)

Items: 110

County: KAUFMAN
Length: N/A
Highway: FM 148
District: DALLAS
Control Number: 0751-03-043
DBE Goal: N/A
Project: F 2024(168)
Guaranty: N/A
Time: 223 WORKING DAYS
Engineer's Estimate: $8,260,263.48
Date: 10/05/2023 (2 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$8,260,263.48
$11,589,085.19
Over/Under Est: 40.3% $3,328,821.71
$12,321,796.76
Over/Under Est: 49.17% $4,061,533.28
Amt Left: 6.32% $732,711.57
$12,583,663.02
Over/Under Est: 52.34% $4,323,399.54
Amt Left: 8.58% $994,577.83
Delta: -2.13% -$261,866.26

Bid Items & Bid Tabulations

110 Total 0 of 110
KAUFMAN  |  FM 148  |  DALLAS  |  0751-03-043  |  10/05/2023  |  $8,260,263.48  |  F 2024(168)  |  REHAB EXIST ROADWAY  |  223 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FNH CONSTRUCTION, LLC
A. L. HELMCAMP, INC.
FLUOR HEAVY CIVIL, LLC
PREPARING ROW
STA 250.640 $1,000.000 $3,271.000 $600.000 $6,400.000
REMOVING CONC (DRIVEWAYS)
SY 51.000 $25.000 $50.000 $55.000 $16.330
REMOVING STAB BASE & ASPH PAV (0-6")
SY 6,221.000 $6.000 $20.000 $25.000 $8.330
REMOVE TRT BASE & ASPH PAV (12"-20")
SY 14,956.000 $7.500 $15.000 $20.000 $14.680
EXCAVATION (ROADWAY)
CY 936.300 $13.250 $20.000 $50.000 $71.750
SUBGRADE WIDENING (ORD COMP)
STA 188.330 $205.000 $450.000 $600.000 $248.290
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 5,376.750 $10.000 $30.000 $70.000 $6.920
BACKFILL (TY A OR B)
STA 249.420 $175.000 $450.000 $300.000 $460.270
ROAD GRADER WORK (ORD COMP)
STA 249.420 $150.000 $450.000 $300.000 $230.000
COMPOST MANUF TOPSOIL (4")
SY 144,802.000 $0.600 $6.000 $2.500 $1.200
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 144,802.000 $0.150 $0.500 $0.180 $0.220
DRILL SEED (TEMP)(WARM OR COOL)
SY 144,802.000 $0.150 $0.500 $0.170 $0.140
VEGETATIVE WATERING
MG 43,085.000 $0.100 $2.000 $1.000 $0.010
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
SY 18,691.000 $14.000 $18.000 $25.000 $16.700
FL BS (CMP IN PLC)(TY D GR1-2)(12")
SY 76,039.000 $29.000 $25.000 $38.000 $35.370
REWRKING BS MATL (TY C)(10")(ORD COMP)
SY 50,220.000 $2.600 $4.000 $5.000 $2.710
CEMENT
TON 479.000 $225.000 $300.000 $325.000 $317.620
CEMENT TREAT (EXIST MATL) (6")
SY 62,775.000 $2.000 $6.000 $4.000 $6.170
CEMENT TREAT (NEW BASE) (6")
SY 18,691.000 $2.200 $6.000 $6.000 $4.690
EMULS ASPH (PRIME)(MS-2 OR SS-1)
GAL 15,213.000 $4.600 $6.000 $7.000 $8.740
ASPH (CRS-2P)
GAL 37,548.000 $4.100 $6.000 $6.000 $4.530
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 15,972.000 $4.100 $6.000 $6.000 $4.770
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
CY 356.000 $125.000 $300.000 $550.000 $174.010
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
CY 727.000 $125.000 $300.000 $350.000 $187.720
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 197.000 $85.000 $85.000 $400.000 $175.060
PLANE ASPH CONC PAV (2")
SY 1,958.000 $3.500 $20.000 $10.000 $8.200
CUT & RESTORE ASPH PAVING
SY 72.000 $100.000 $200.000 $220.000 $155.620
TRENCH EXCAVATION PROTECTION
LF 128.000 $8.000 $10.000 $11.000 $13.830
TEMPORARY SPL SHORING
SF 4,754.000 $45.000 $55.000 $55.000 $35.540
RIPRAP (CONC)(5 IN)
CY 29.600 $650.000 $650.000 $1,045.000 $785.250
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 367.000 $200.000 $250.000 $275.000 $229.540
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 19.000 $600.000 $1,000.000 $715.000 $816.590
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 14.000 $700.000 $1,000.000 $770.000 $1,043.210
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 16.000 $740.000 $1,000.000 $825.000 $1,218.580
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 18.000 $720.000 $1,250.000 $880.000 $1,137.490
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 14.000 $750.000 $1,500.000 $880.000 $1,216.750
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 40.000 $800.000 $1,600.000 $935.000 $1,191.520
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 30.000 $850.000 $1,700.000 $990.000 $1,484.040
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 45.000 $900.000 $1,800.000 $1,100.000 $1,648.210
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 28.000 $900.000 $1,900.000 $1,320.000 $1,631.420
CONC BOX CULV (6 FT X 2 FT) (EXTEND)
LF 14.000 $750.000 $1,500.000 $990.000 $1,428.760
RC PIPE (CL III)(18 IN)
LF 1,466.000 $60.000 $85.000 $71.500 $113.050
RC PIPE (CL III)(24 IN)
LF 308.000 $80.000 $125.000 $165.000 $150.700
RC PIPE (CL III)(36 IN)
LF 38.000 $125.000 $165.000 $275.000 $304.690
RC PIPE (CL IV)(24 IN)
LF 117.000 $130.000 $160.000 $176.000 $184.300
RC PIPE (CL IV)(30 IN)
LF 98.000 $190.000 $185.000 $247.500 $264.190
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 2.000 $5,500.000 $3,500.000 $5,500.000 $6,420.980
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 2.000 $6,500.000 $4,500.000 $7,150.000 $8,597.530
WINGWALL (PW - 2) (HW=3 FT)
EA 2.000 $18,000.000 $8,500.000 $7,150.000 $3,895.880
WINGWALL (PW - 2) (HW=4 FT)
EA 4.000 $20,000.000 $12,500.000 $9,900.000 $8,248.840
WINGWALL (PW - 2) (HW=5 FT)
EA 2.000 $22,000.000 $15,000.000 $14,300.000 $14,988.390
WINGWALL (PW - 2) (HW=6 FT)
EA 2.000 $23,000.000 $18,500.000 $24,200.000 $22,031.840
WINGWALL (PW - 2) (HW=7 FT)
EA 2.000 $27,000.000 $22,000.000 $31,900.000 $29,744.660
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
EA 2.000 $7,185.830 $12,500.000 $9,350.000 $17,091.770
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $10,670.020 $14,500.000 $9,900.000 $22,212.770
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
EA 2.000 $7,450.550 $17,500.000 $9,350.000 $12,080.770
SET (TY I)(S= 6 FT)(HW= 3 FT)(3:1) (C)
EA 2.000 $4,700.000 $18,500.000 $13,200.000 $12,144.890
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
EA 2.000 $1,900.000 $19,000.000 $15,400.000 $19,250.730
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 117.000 $750.000 $1,250.000 $1,100.000 $1,941.510
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 4.000 $1,100.000 $2,200.000 $1,320.000 $1,826.130
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 28.000 $1,300.000 $2,200.000 $2,750.000 $2,948.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $1,500.000 $3,650.000 $3,850.000 $3,137.830
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $3,200.000 $4,500.000 $6,050.000 $7,698.410
CLEAN EXIST CULVERTS
EA 12.000 $1,600.000 $1,500.000 $2,750.000 $1,844.240
REMOV STR (SET)
EA 72.000 $150.000 $500.000 $1,320.000 $143.380
REMOV STR (WINGWALL)
EA 22.000 $1,600.000 $1,000.000 $2,200.000 $4,097.470
REMOV STR (PIPE)
LF 175.800 $15.000 $50.000 $55.000 $18.500
REMOV STR (PIPE)
EA 60.000 $500.000 $500.000 $1,320.000 $195.850
MOBILIZATION
LS 1.000 $738,193.950 $1,000,000.000 $1,000,000.000 $1,250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $10,000.000 $8,500.000 $10,000.000 $38,450.870
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 1,170.000 $65.000 $30.000 $60.500 $153.640
ROCK FILTER DAMS (REMOVE)
LF 1,170.000 $10.000 $15.000 $16.500 $23.320
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 328.000 $20.000 $50.000 $29.700 $49.330
CONSTRUCTION EXITS (REMOVE)
SY 328.000 $5.000 $20.000 $16.500 $14.130
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,042.000 $3.000 $4.000 $3.470 $4.590
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,042.000 $0.300 $2.000 $0.550 $1.110
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,111.000 $6.000 $18.000 $4.400 $6.330
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,111.000 $1.000 $9.000 $1.100 $1.110
DRIVEWAYS (ACP)
SY 5,791.000 $60.000 $40.000 $100.000 $84.860
DRIVEWAYS (CONC) (HES)
SY 52.000 $150.000 $150.000 $275.000 $235.740
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 49,535.000 $0.150 $0.500 $0.240 $0.140
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 25,062.000 $0.150 $0.500 $0.270 $0.140
REMOVE METAL BEAM GUARD FENCE
LF 375.000 $3.000 $3.000 $15.000 $3.020
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $250.000 $1,500.000 $350.000 $252.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 40.000 $260.000 $850.000 $330.000 $277.190
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 6.000 $320.000 $850.000 $385.000 $297.350
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 3.000 $725.000 $850.000 $660.000 $750.940
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 52.000 $725.000 $1,150.000 $687.500 $700.550
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $1,000.000 $1,150.000 $770.000 $670.310
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $1,100.000 $1,150.000 $935.000 $937.420
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,250.000 $1,150.000 $825.000 $957.580
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 5.000 $1,500.000 $1,150.000 $110.000 $1,305.330
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 44.000 $70.000 $100.000 $71.500 $44.350
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,133.000 $1.630 $6.000 $0.820 $2.620
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 140.000 $10.350 $9.000 $12.050 $11.040
REFL PAV MRK TY II (W) 6" (SLD)
LF 126,185.000 $0.330 $0.500 $0.290 $0.260
REFL PAV MRK TY II (Y) 6" (BRK)
LF 7,025.000 $0.330 $0.750 $0.310 $0.280
REFL PAV MRK TY II (Y) 6" (SLD)
LF 73,443.000 $0.330 $0.500 $0.290 $0.260
PAVEMENT SEALER 6"
LF 366.000 $0.300 $6.000 $1.100 $1.010
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 49,535.000 $1.040 $1.000 $0.780 $0.720
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 2,789.000 $0.620 $1.500 $0.790 $0.730
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 29,338.000 $1.040 $1.500 $0.780 $0.720
REFL PAV MRKR TY II-A-A
EA 562.000 $5.950 $6.000 $6.550 $6.000
PAV SURF PREP FOR MRK (6")
LF 366.000 $0.030 $6.000 $1.100 $1.010
FULL - WIDTH MOWING
CYC 3.000 $3,100.000 $5,000.000 $6,500.000 $3,124.740
SP MIXES SP-C SAC-B PG64-22
TON 8,588.000 $145.000 $145.000 $175.000 $134.880
TACK COAT
GAL 4,788.000 $4.450 $6.000 $5.000 $1.050
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $12,000.000 $16,500.000 $25,000.000 $24,695.380
TMA (STATIONARY)
DAY 223.000 $300.000 $250.000 $300.000 $117.060
TMA (MOBILE OPERATION)
DAY 20.000 $200.000 $550.000 $850.000 $700.900
Totals: $8,260,263.485 $11,589,085.190 $12,321,796.760 $12,583,663.034