Show Job Controls
Bid Cobra

KAUFMAN IH 20 (0495-01-074)

Items: 39

County: KAUFMAN
Length: N/A
Highway: IH 20
District: DALLAS
Control Number: 0495-01-074
DBE Goal: N/A
Project: NH 1702(759)
Guaranty: N/A
Time: 120 WORKING DAYS
Engineer's Estimate: $10,384,458.79
Date: 07/12/2017 (8 years ago)
Contract Number: N/A
Type: MILL AND OVERLAY EXISTING FREEWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$10,384,458.79
$9,178,944.71
Over/Under Est: -11.61% -$1,205,514.08
Over/Under Est: -9.24% -$959,521.76
Amt Left: 2.68% $245,992.32
Over/Under Est: -6.33% -$657,710.71
Amt Left: 5.97% $547,803.37
Delta: -3.20% -$301,811.05
Over/Under Est: 1.2% $124,151.25
Amt Left: 14.49% $1,329,665.33
Delta: -8.04% -$781,861.96
$13,145,097.80
Over/Under Est: 26.58% $2,760,639.01
Amt Left: 43.21% $3,966,153.09
Delta: -25.09% -$2,636,487.76
$14,786,732.11
Over/Under Est: 42.39% $4,402,273.32
Amt Left: 61.09% $5,607,787.40
Delta: -12.49% -$1,641,634.31

Bid Items & Bid Tabulations

39 Total 0 of 39
KAUFMAN  |  IH 20  |  DALLAS  |  0495-01-074  |  07/12/2017  |  $10,384,458.79  |  NH 1702(759)  |  MILL AND OVERLAY EXIST FREEWAY  |  120 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
OLDCASTLE MATERIALS TEXAS, INC.
AUSTIN BRIDGE & ROAD SERVICES, LP
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
PEACHTREE CONSTRUCTION, LTD.
EAST TEXAS BRIDGE, INC.
RK HALL, LLC
BACKFILL (TY A OR B)
STA 640.360 $175.000 $190.000 $370.000 $150.000 $300.000 $350.000 $320.000
DRILL SEEDING (PERM)(WARM OR COOL)
SY 248,292.000 $0.150 $0.205 $0.090 $0.140 $0.200 $0.300 $0.130
FL BS (RDWY DEL) (TY D GR 1-2)
TON 638.000 $25.000 $30.000 $31.000 $60.000 $50.000 $75.000 $52.000
REWORK BS MTL (TY C) (6") (DENS CONT)
SY 3,355.000 $1.900 $6.350 $14.000 $12.000 $31.000 $15.000 $16.110
PRIME COAT(MC-30 OR AE-P)
GAL 671.000 $4.150 $4.450 $6.500 $4.000 $7.500 $10.000 $5.650
SUPERPAVE MIXTURES SP-D PG64-22
TON 14,582.000 $68.000 $71.500 $70.600 $66.000 $69.500 $95.000 $100.400
SUPERPAVE MIXTURES SP-D PG64-22(LEV-UP)
TON 290.000 $100.000 $78.000 $92.000 $110.000 $140.000 $200.000 $155.000
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
TON 67,259.000 $98.000 $85.500 $84.000 $90.000 $95.500 $122.000 $143.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 3,355.000 $50.000 $62.500 $55.000 $100.000 $75.000 $100.000 $84.000
PLANE ASPH CONC PAV (2")
SY 98,321.000 $1.500 $2.400 $1.500 $1.750 $2.800 $2.500 $2.600
PAV JT UNDERSEAL (24")
LF 3,000.000 $23.150 $44.000 $12.150 $30.000 $62.000 $30.000 $20.000
RESIZING AND SEALING JOINTS
LF 3,000.000 $18.700 $23.500 $12.500 $12.000 $44.000 $20.000 $15.500
MOBILIZATION
LS 1.000 $850,000.000 $231,330.000 $930,450.000 $655,000.000 $550,000.000 $1,000,000.000 $1,225,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $12,500.000 $19,000.000 $16,200.000 $15,000.000 $10,500.000 $20,000.000 $2,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,000.000 $2.200 $1.550 $1.500 $1.500 $1.600 $4.000 $2.700
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,000.000 $0.490 $0.520 $0.500 $0.500 $0.560 $1.000 $0.540
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,200.000 $2.500 $4.300 $4.250 $4.250 $4.000 $7.000 $4.860
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,200.000 $1.000 $0.780 $0.750 $0.750 $1.300 $1.000 $1.080
RUMBLE STRIPS (SHOULDER)
LF 174,684.000 $0.140 $0.132 $0.080 $0.100 $0.130 $0.250 $0.130
MTL W-BEAM GD FEN (TIM POST)
LF 15,881.000 $20.400 $20.500 $22.000 $18.500 $20.000 $22.000 $21.600
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 41.000 $1,820.000 $1,400.000 $1,390.000 $1,390.000 $1,700.000 $1,700.000 $1,485.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 37.000 $1,008.000 $1,230.000 $890.000 $890.000 $1,100.000 $1,300.000 $1,323.000
REMOVE METAL BEAM GUARD FENCE
LF 15,881.000 $2.500 $4.020 $1.500 $1.500 $2.200 $3.000 $4.320
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 37.000 $100.000 $126.000 $100.000 $100.000 $275.000 $250.000 $135.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 41.000 $215.000 $252.000 $100.000 $100.000 $275.000 $250.000 $270.000
GUARDRAIL END TREATMENT (INSTALL)
EA 55.000 $2,303.000 $1,985.000 $1,910.000 $1,910.000 $2,450.000 $2,400.000 $2,122.200
GUARDRAIL END TREATMENT (REMOVE)
EA 55.000 $256.000 $252.000 $150.000 $150.000 $275.000 $300.000 $270.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 139.000 $23.500 $42.200 $20.000 $34.000 $38.000 $40.000 $45.360
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 104.000 $28.000 $42.200 $20.000 $37.000 $41.000 $40.000 $45.360
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,704.000 $0.250 $1.000 $0.680 $0.500 $1.800 $2.000 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,500.000 $0.270 $0.760 $0.850 $0.850 $1.000 $1.000 $0.920
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 32,018.000 $0.460 $0.360 $0.300 $0.350 $0.400 $0.350 $0.320
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 131,262.000 $0.350 $0.305 $0.300 $0.250 $0.380 $0.350 $0.320
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 127,572.000 $0.350 $0.305 $0.300 $0.250 $0.380 $0.350 $0.320
REFL PAV MRKR TY I-C
EA 1,653.000 $3.000 $3.050 $2.750 $3.250 $3.800 $3.500 $2.970
REFL PAV MRKR TY II-A-A
EA 3,004.000 $3.000 $3.050 $2.750 $3.250 $3.800 $3.500 $2.970
TRACKLESS TACK COAT
GAL 103,529.000 $4.000 $3.350 $0.000 $4.000 $3.200 $0.000 $0.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,500.000 $9,500.000 $6,000.000 $5,500.000 $20,000.000 $20,000.000 $20,000.000
1
MEMBRANE UNDERSEAL
GAL 103,529.000 $4.000 $0.000 $2.140 $0.000 $0.000 $3.000 $5.500
Totals: $10,798,574.790 $9,178,944.718 $9,424,937.030 $9,726,748.080 $10,508,610.040 $13,145,097.800 $14,786,732.110