KAUFMAN SH 198 (0443-02-023)

Items: 85

County: KAUFMAN
Length: 1.6100 MILES
Highway: SH 198
District: DALLAS
Control Number: 0443-02-023
DBE Goal: 6.0%
Project: STP 2025(969)HES
Guaranty: $99,000.00
Time: 200 WORKING DAYS
Engineer's Estimate: $4,926,221.68
Date: 08/07/2025 (10 months ago)
Contract Number: 8253007
Type: HIGHWAY IMPROVEMENT
Project ID: A00184820
Contract Type: Federal
Project Description: INSTALL CONTINUOUS TURN LANES
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
LANE SELMAN
NICHOLAS WADLINGTON
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (9)
E
Engineer's Estimate
$4,926,221.68
$5,180,451.82
Over/Under Est: 5.16% $254,230.14
Over/Under Est: 6.83% $336,669.75
Amt Left: 1.59% $82,439.61
Over/Under Est: 13.17% $648,883.33
Amt Left: 7.62% $394,653.19
Delta: -5.93% -$312,213.58
Over/Under Est: 13.52% $666,151.92
Amt Left: 7.95% $411,921.78
Delta: -0.31% -$17,268.59
Over/Under Est: 13.84% $681,957.26
Amt Left: 8.26% $427,727.12
Delta: -0.28% -$15,805.34
Over/Under Est: 14.18% $698,420.09
Amt Left: 8.57% $444,189.95
Delta: -0.29% -$16,462.83
Over/Under Est: 17.16% $845,262.88
Amt Left: 11.41% $591,032.74
Delta: -2.61% -$146,842.79
Over/Under Est: 21.7% $1,068,770.14
Amt Left: 15.72% $814,540.00
Delta: -3.87% -$223,507.26
Over/Under Est: 43.26% $2,131,173.52
Amt Left: 36.23% $1,876,943.38
Delta: -17.72% -$1,062,403.38
Subcontractor Percentage Amount
BAHENA CONSTRUCTION CO., INC. 13.57% $702,987.31
DUSTIN ALLEN, INC. 1.91% $98,946.63
COLD CREEK CONSTRUCTION, LTD 1.09% $56,466.92
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.96% $49,732.34
TRP CONSTRUCTION GROUP, LLC 0.81% $41,961.66
MARCOMS CONSTRUCTION LLC 0.42% $21,757.90
PANOLA SIGN & BARRICADE, INC. 0.24% $12,433.08
Total: 19.00% $984,285.84

Bid Items & Bid Tabulations

85 Total 0 of 85
KAUFMAN  |  SH 198  |  DALLAS  |  0443-02-023  |  08/07/2025  |  $4,926,221.68  |  STP 2025(969)HES  |  HWY IMPRV  |  200 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
BAKER & COMPANY CONSTRUCTION, LLC
ED BELL CONSTRUCTION COMPANY
D. L. LENNON INCORPORATED - CONTRACTOR
GRANITE CONSTRUCTION COMPANY
ROAD MAKER CONTRACTORS, LLC
GREY SKY CONSTRUCTION LLC
A. K. GILLIS & SONS, LLC
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 84.980 $376.000 $2,500.000 $995.000 $4,875.000 $4,087.000 $6,300.000 $5,920.000 $5,882.000 $500.000 $3,573.000
REMOV CONC (DRIVEWAYS)
SY 1,364.000 $25.000 $18.000 $15.600 $21.600 $12.000 $15.000 $12.700 $20.000 $13.200 $30.000
RMV (9"-13") TRT/UNTRT BASE & ASPH PAV
SY 3,351.000 $10.000 $10.000 $13.400 $13.500 $14.000 $12.000 $11.350 $15.000 $5.970 $18.000
RMV (6") TRT/UNTRT BASE & ASPH PAV
SY 3,419.000 $9.000 $8.000 $8.500 $13.000 $12.000 $7.000 $7.570 $15.000 $2.920 $18.000
EXCAV (ROADWAY)
CY 5,587.000 $22.000 $15.000 $11.400 $5.000 $23.000 $15.000 $17.200 $20.000 $25.000 $27.000
SUBGR WIDEN (OC)
STA 84.980 $200.000 $1,150.000 $800.000 $1,000.000 $350.000 $750.000 $396.000 $650.000 $350.000 $1,850.000
EMBANK (FNL)(OC)(TY C)
CY 5,892.000 $15.000 $27.000 $35.000 $12.000 $16.000 $10.000 $34.200 $40.000 $25.000 $57.000
BACKFILL (TY A OR B)
STA 84.980 $455.000 $150.000 $360.000 $500.000 $400.000 $250.000 $298.000 $450.000 $350.000 $400.000
ROAD GRADER WORK (ORD COMP)
STA 84.980 $300.000 $222.000 $531.000 $500.000 $650.000 $600.000 $345.000 $450.000 $350.000 $450.000
COMPOST MANUF TOPSOIL (4")
SY 49,990.000 $2.000 $2.150 $1.400 $1.120 $3.290 $2.000 $3.000 $3.000 $1.419 $1.400
DRILL SEED (PERM_RURAL_CLAY)
SY 49,990.000 $0.350 $0.190 $0.300 $0.160 $0.260 $0.400 $0.450 $0.500 $0.286 $0.300
DRILL SEED (TEMP_WARM_COOL)
SY 24,996.000 $0.350 $0.200 $0.300 $0.150 $0.260 $0.290 $0.450 $0.500 $0.286 $0.300
VEGETATIVE WATERING
TGL 11,155.000 $5.000 $1.000 $1.000 $2.160 $0.010 $0.010 $22.000 $5.000 $1.500 $0.100
FL BS (CMP IN PLC)(TY D GR 1-2) (12")
SY 16,686.000 $34.000 $41.000 $38.000 $41.000 $43.190 $41.000 $24.810 $28.000 $71.110 $56.000
PRIME COAT(MC-30 OR AE-P)
GAL 3,338.000 $6.000 $7.000 $9.000 $5.290 $12.000 $5.000 $9.430 $6.000 $9.590 $10.000
SP MIXES SP-B PG64-22
TON 3,333.000 $150.000 $151.000 $177.000 $146.660 $150.590 $141.000 $182.220 $145.000 $174.300 $185.000
SP MIXES SP-C SAC-B PG70-22
TON 4,425.000 $150.000 $166.000 $180.000 $151.340 $155.130 $142.000 $194.180 $170.000 $185.730 $185.000
TACK COAT
GAL 2,458.000 $3.000 $4.000 $7.700 $1.080 $1.000 $1.000 $8.280 $6.000 $7.920 $5.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,118.000 $90.000 $93.000 $156.000 $106.540 $118.990 $115.000 $113.050 $85.000 $119.950 $120.000
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 887.000 $5.000 $16.000 $22.000 $13.500 $9.900 $10.000 $4.500 $10.000 $16.590 $11.000
TEMPORARY SPL SHORING
SF 4,315.000 $40.000 $30.000 $22.250 $55.000 $70.000 $21.000 $29.600 $55.000 $33.000 $24.000
RIPRAP (MOW STRIP)(4 IN)
CY 95.000 $700.000 $700.000 $745.000 $864.000 $675.000 $600.000 $880.000 $550.000 $742.500 $900.000
RIRRAP (STONE COMMON)(DRY)(15 IN)
CY 99.000 $135.000 $200.000 $326.000 $162.000 $350.000 $270.000 $208.000 $185.000 $391.500 $175.000
RIPRAP (STONE PROTECTION)(15 IN)
CY 434.000 $170.000 $200.000 $162.000 $162.000 $350.000 $220.000 $184.000 $185.000 $391.500 $175.000
RAIL (TY T552)
LF 62.000 $150.000 $525.000 $360.000 $300.000 $385.000 $165.000 $325.000 $210.000 $330.000 $365.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 17.000 $1,100.000 $1,050.000 $1,650.000 $702.000 $1,000.000 $600.000 $862.500 $1,000.000 $1,100.000 $1,000.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 16.000 $1,300.000 $1,260.000 $2,050.000 $918.000 $1,200.000 $900.000 $1,150.000 $1,250.000 $1,320.000 $1,300.000
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
LF 32.000 $1,500.000 $1,365.000 $1,660.000 $972.000 $1,300.000 $820.000 $1,380.000 $1,500.000 $1,430.000 $1,400.000
RC PIPE (CL III)(18 IN)
LF 713.000 $60.000 $58.000 $64.000 $66.000 $55.000 $75.000 $71.300 $85.000 $60.500 $67.000
RC PIPE (CL III)(24 IN)
LF 901.000 $90.000 $95.000 $77.000 $140.400 $90.000 $85.000 $147.000 $105.000 $99.000 $150.000
RC PIPE (CL III)(36 IN)
LF 85.000 $220.000 $184.000 $357.000 $270.000 $175.000 $130.000 $287.500 $150.000 $192.500 $290.000
WINGWALL (PW - 1) (HW=7 FT)
EA 1.000 $35,000.000 $33,600.000 $23,650.000 $28,080.000 $32,000.000 $55,088.920 $34,800.000 $40,000.000 $35,200.000 $37,000.000
WINGWALL (PW - 1) (HW=8 FT)
EA 1.000 $45,000.000 $39,900.000 $24,750.000 $32,400.000 $38,000.000 $47,668.770 $42,000.000 $65,000.000 $41,800.000 $42,000.000
WINGWALL (PW - 2) (HW=4 FT)
EA 2.000 $20,000.000 $14,700.000 $7,700.000 $8,100.000 $14,000.000 $14,399.940 $9,000.000 $35,000.000 $15,400.000 $12,000.000
WINGWALL (PW - 2) (HW=8 FT)
EA 2.000 $45,000.000 $39,900.000 $24,475.000 $21,600.000 $38,000.000 $24,188.620 $41,400.000 $75,000.000 $41,800.000 $30,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 34.000 $900.000 $945.000 $1,245.000 $972.000 $900.000 $1,000.000 $1,092.500 $1,850.000 $990.000 $1,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 34.000 $1,400.000 $1,575.000 $1,655.000 $2,160.000 $1,500.000 $15,000.000 $2,875.000 $2,200.000 $1,650.000 $2,300.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $6,900.000 $8,400.000 $15,545.000 $5,400.000 $8,000.000 $5,500.000 $5,500.000 $3,000.000 $8,800.000 $5,800.000
SET(TY II)(24 IN)(RCP)(4:1)(P)
EA 2.000 $1,200.000 $1,365.000 $11,435.000 $1,944.000 $1,300.000 $1,100.000 $2,300.000 $2,500.000 $1,430.000 $2,090.000
CLEAN EXIST CULVERTS
EA 5.000 $3,000.000 $1,260.000 $4,245.000 $1,080.000 $1,200.000 $750.000 $2,100.000 $1,500.000 $1,320.000 $1,200.000
REMOV STR (SET)
EA 12.000 $1,600.000 $210.000 $1,770.000 $810.000 $200.000 $200.000 $862.500 $500.000 $220.000 $870.000
REMOV STR (WINGWALL)
EA 6.000 $1,100.000 $1,050.000 $1,960.000 $1,080.000 $1,000.000 $3,000.000 $1,725.000 $2,500.000 $1,100.000 $2,000.000
REMOV STR (HEADWALL)
EA 10.000 $1,300.000 $1,050.000 $1,365.000 $1,080.000 $1,000.000 $700.000 $1,725.000 $2,500.000 $1,100.000 $2,000.000
REMOV STR (PIPE)
LF 1,252.000 $30.000 $11.000 $17.000 $21.600 $10.000 $12.000 $31.500 $50.000 $11.000 $25.000
MOBILIZATION
LS 1.000 $415,040.000 $500,000.000 $360,000.000 $550,000.000 $567,000.000 $560,000.000 $197,700.000 $500,000.000 $480,198.568 $699,967.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $25,000.000 $15,000.000 $11,000.000 $31,500.000 $6,562.000 $14,000.000 $7,877.310 $15,000.000 $28,718.269 $55,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $20,000.000 $15,000.000 $12,500.000 $20,000.000 $25,000.000 $9,000.000 $18,300.000 $20,000.000 $17,500.000 $20,000.000
TMA (STATIONARY)
DAY 200.000 $250.000 $200.000 $363.000 $157.500 $150.000 $100.000 $286.000 $250.000 $150.000 $1.000
TMA (MOBILE OPERATION)
DAY 5.000 $535.000 $350.000 $1,795.000 $1,250.000 $150.000 $900.000 $465.000 $550.000 $150.000 $1.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 60.000 $77.000 $47.000 $94.000 $89.100 $80.000 $120.000 $84.000 $35.000 $88.000 $92.000
ROCK FILTER DAMS (REMOVE)
LF 670.000 $18.000 $16.000 $11.000 $26.030 $15.000 $15.000 $15.750 $20.000 $16.500 $17.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $27.000 $20.000 $28.000 $37.800 $38.000 $95.000 $39.900 $20.000 $41.800 $44.000
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $11.000 $5.000 $11.000 $9.720 $12.000 $12.000 $12.600 $10.000 $13.200 $14.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,655.000 $4.000 $4.000 $4.500 $3.890 $4.250 $6.000 $4.460 $4.000 $4.675 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,655.000 $1.000 $1.000 $1.650 $1.080 $1.250 $1.000 $1.310 $2.000 $1.375 $1.450
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 315.000 $4.000 $4.000 $5.500 $6.480 $6.000 $12.000 $6.300 $12.000 $6.600 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 315.000 $2.000 $1.000 $1.100 $1.300 $1.000 $1.500 $1.050 $5.000 $1.100 $1.150
ROCK FILTER DAMS (INSTALL) (TY 2) 6:1
LF 610.000 $102.000 $42.000 $72.000 $62.640 $65.000 $120.000 $68.250 $50.000 $71.500 $75.000
DRIVEWAYS (CONC) (HES)
SY 985.000 $120.000 $105.000 $248.000 $140.000 $115.000 $100.000 $179.220 $115.000 $127.500 $235.000
DRIVEWAYS (ACP)
SY 2,700.000 $75.000 $110.000 $88.000 $84.930 $78.370 $64.960 $94.060 $45.000 $100.270 $100.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 15,952.000 $0.250 $1.000 $0.450 $0.360 $5.520 $0.250 $0.370 $0.500 $0.253 $0.560
MTL W-BEAM GD FEN (TIM POST)
LF 1,550.000 $26.000 $23.000 $25.000 $24.300 $21.700 $21.700 $28.500 $30.000 $23.870 $26.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,900.000 $1,628.000 $2,000.000 $3,407.710 $1,850.000 $1,550.000 $2,190.000 $1,850.000 $2,972.200 $2,500.000
TL-2 31" SHORT RADIUS (W/O DAT)
EA 1.000 $35,000.000 $17,000.000 $19,800.000 $19,440.000 $16,200.000 $16,200.000 $19,983.600 $1,850.000 $17,820.000 $14,500.000
REMOVE METAL BEAM GUARD FENCE
LF 2,281.000 $4.000 $2.000 $2.750 $2.700 $2.000 $10.000 $4.200 $6.000 $2.200 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,800.000 $3,045.000 $3,245.000 $3,186.000 $2,900.000 $2,900.000 $3,317.750 $3,250.000 $3,190.000 $3,450.000
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $300.000 $210.000 $275.000 $270.000 $200.000 $400.000 $287.500 $1,500.000 $220.000 $290.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 6.000 $250.000 $289.000 $253.000 $297.000 $285.000 $250.000 $525.550 $1,100.000 $275.000 $550.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 21.000 $800.000 $656.000 $759.000 $675.000 $900.000 $631.310 $712.000 $1,150.000 $979.000 $780.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $900.000 $751.000 $930.000 $772.200 $1,230.000 $722.220 $895.000 $1,150.000 $979.000 $915.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,200.000 $1,150.000 $1,200.000 $1,182.600 $1,570.000 $1,106.060 $1,000.000 $1,150.000 $979.000 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 1.000 $900.000 $1,470.000 $1,340.000 $1,510.920 $1,900.000 $1,413.130 $1,100.000 $1,150.000 $1,540.000 $1,500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 6.000 $35.000 $26.000 $22.000 $16.200 $50.000 $15.150 $27.000 $100.000 $27.500 $23.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 30.000 $13.500 $33.000 $28.000 $27.000 $31.000 $25.250 $40.500 $100.000 $34.100 $29.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 846.000 $3.000 $1.000 $2.200 $6.710 $8.000 $5.000 $0.660 $6.000 $2.350 $1.300
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 77.000 $8.000 $8.000 $7.700 $7.560 $7.650 $8.060 $8.800 $20.000 $7.970 $8.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 20.000 $4.000 $147.000 $149.000 $145.800 $175.000 $230.350 $201.250 $250.000 $154.000 $230.000
RE PM TY II (W) 6" (SLD)
LF 16,648.000 $0.300 $0.210 $0.300 $0.270 $0.270 $0.170 $0.310 $0.550 $0.220 $0.170
RE PM TY II (Y) 6" (BRK)
LF 3,924.000 $0.350 $0.210 $0.300 $0.270 $0.350 $0.170 $0.400 $0.550 $0.220 $0.170
RE PM TY II (Y) 6" (SLD)
LF 18,170.000 $0.300 $0.210 $0.300 $0.270 $0.270 $0.170 $0.310 $0.550 $0.220 $0.170
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 16,648.000 $1.000 $0.670 $0.900 $0.860 $0.550 $0.610 $0.630 $0.550 $0.710 $0.600
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 3,924.000 $1.100 $0.670 $1.100 $1.080 $0.600 $0.610 $0.690 $0.550 $0.710 $0.600
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 18,170.000 $1.000 $0.670 $0.900 $0.860 $0.550 $0.610 $0.630 $0.550 $0.710 $0.600
REFL PAV MRKR TY II-A-A
EA 522.000 $6.000 $4.750 $6.600 $6.480 $4.500 $4.550 $5.180 $6.000 $4.950 $4.550
FULL - WIDTH MOWING
CYC 4.000 $4,000.000 $3,000.000 $5,500.000 $3,500.000 $5,000.000 $1,250.000 $4,145.000 $2,500.000 $4,000.000 $3,850.000
Totals: $4,926,221.680 $5,180,451.820 $5,262,891.430 $5,575,105.010 $5,592,373.600 $5,608,178.940 $5,624,641.770 $5,771,484.560 $5,994,991.797 $7,057,395.200
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $15,000.00
Total: $35,000.00